Permit #2025050064
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00320-0150 |
| CONDITIONED SPACE: 2400 sqft |
| GARAGE: 566 sqft |
| OPENED PORCH (WITH ROOF) : 350 sqft |
| Total Square Footage: 3316 sqft |
| Block: 00320 |
| Subdivision: 7032 - |
| Job Phone: 386-283-2035 |
| Location Address: 21 ROSEPETAL LN |
| Type: DU - DUPLEX |
| Issue Date: 06/05/2025 |
| NOC: RECORDED |
| Applicant name: OLEG BELINSKIY |
| Owner: FLORIDAS BEST BUILDERS INC |
|
Address 19 PINE CIRCLE DR PALM COAST, FL 32164 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
FLORIDAS BEST BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE PALM COAST, FL 32164 |
CBC1264760 (Exp: 08/31/2026) | 386-283-2035 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
SERGEY A VORONIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7631 SEVERN JACKSONVILLE, FL 32224 |
EC13011326 (Exp: 08/31/2026) | 360-798-2819 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/12/2026 | APPROVED | CVANSTRAHLEN |
| Note: 1/6/2026 - PREVIOUS INSPECTION NOTES Inspection was completed on 01/05/26 Please fix items before next inspection #1-Seal open slot on main mater panel for A & B side #2-Seal sotfit penetration on main meter panel conduit #3-MIssing light bolb on attic on A & B side #4-Seal dryer box framing bottom trim ,( letf side ) #5-FBC [A] 107.4-MECHANICAL EQUIPMENT DOES NOT MATCH ENERGY CALCS ( AH Unit )for A & B sides #6-Insulation certificated need company name , signature and date #7-FBCR 318-TERMITE TREATMENT OR NOTICE OF INTENT FOR BORACARE Code for lock box - 1980 | |||
| ROW - FINAL INSPECTION | 01/12/2026 | APPROVED | FSLADISH |
| Note: 1/12/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________________ 1/6/2026 - PREVIOUS INSPECTION NOTES 1/6/26 DUE TO THE ENTIRE COPC CD PLUS SYSTEM BEING DOWN YESTERDAY AND SPEAKING WITH CM ABOUT REQUIRED CORRECTIONS NEEDED, I AM DISAPPROVING THIS INSPECTION WITHOUT A FEE AS IT WAS ALREADY IN THE SYSTEM PREVIOUS TO THE OUTAGE AND MEETING ON SITE. BUILDER REQUIRED TO REGLUE AND RESET PAVER ON LEFT SIDE DRIVEWAY APRON WING AT ROAD EDGE AND CLEAN ALL DIRT AND SEDIMENT OUT OF CULVERT PIPE, ESPECIALLY RIGHT SIDE BEFORE ROW FINAL PASSAGE. PHOTO FOR REFERENCE. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/05/2026 | FINAL APPROVED | BHAINES |
| ROW - FINAL INSPECTION | 01/05/2026 | Disapproved - NO FEE | FSLADISH |
| Note: 1/6/26 DUE TO THE ENTIRE COPC CD PLUS SYSTEM BEING DOWN YESTERDAY AND SPEAKING WITH CM ABOUT REQUIRED CORRECTIONS NEEDED, I AM DISAPPROVING THIS INSPECTION WITHOUT A FEE AS IT WAS ALREADY IN THE SYSTEM PREVIOUS TO THE OUTAGE AND MEETING ON SITE. BUILDER REQUIRED TO REGLUE AND RESET PAVER ON LEFT SIDE DRIVEWAY APRON WING AT ROAD EDGE AND CLEAN ALL DIRT AND SEDIMENT OUT OF CULVERT PIPE, ESPECIALLY RIGHT SIDE BEFORE ROW FINAL PASSAGE. PHOTO FOR REFERENCE. | |||
| U-CROSS CONNECTION | 01/05/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR | |||
| BLD - BUILDING FINAL | 01/05/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Inspection was completed on 01/05/26 Please fix items before next inspection #1-Seal open slot on main mater panel for A & B side #2-Seal sotfit penetration on main meter panel conduit #3-MIssing light bolb on attic on A & B side #4-Seal dryer box framing bottom trim ,( letf side ) #5-FBC [A] 107.4-MECHANICAL EQUIPMENT DOES NOT MATCH ENERGY CALCS ( AH Unit )for A & B sides #6-Insulation certificated need company name , signature and date #7-FBCR 318-TERMITE TREATMENT OR NOTICE OF INTENT FOR BORACARE Code for lock box - 1980 | |||
| ROW - FINAL APRON (AFTER POUR) | 01/05/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/6/26 I AM APPROVING THIS INSPECTION AS NOTED THAT YOU HAVE A LOOSE PAVER ON THE LEFT SIDE DRIVEWAY APRON THAT NEEDS TO BE REGLUED AND SET. I WILL HOLD IT UP ON THE ROW FINAL INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/26/2025 | APPROVED | TPOLACEK |
| Note: 11/14/2025 - PREVIOUS INSPECTION NOTES 11-14-25 TPOLACEK** FINAL SURVEY INDICATES THE CULVERT IS PITCHED AGAINST THE FLOW BY .04 PLEASE HAVE CULVERT ELEVATION RESHOT TO CONFIRM | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/26/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 11-26-25 TPOLACEK*** BEFORE ROW FINAL WILL BE APPROVED THERE IS TRASH BEHIND PROPERTY THAT MUST BE REMOVED. APPROVING FIELD AS NOTED Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage 1 Road Damage must be seen before construction starts Sec 300.01 E2/ Sec 300.03 F1 Sec 300.01 E2 A pre-lot clearing inspection for road damage may be requested, if necessary, by calling inspector for you area. If an inspection has not been requested the builder will be responsible for all road damage and debris at the time of the final inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/14/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 11-14-25 TPOLACEK** FINAL SURVEY INDICATES THE CULVERT IS PITCHED AGAINST THE FLOW BY .04 PLEASE HAVE CULVERT ELEVATION RESHOT TO CONFIRM | |||
| ELECTRIC - EARLY POWER | 11/06/2025 | APPROVED | CVANSTRAHLEN |
| Note: 11/5/2025 - PREVIOUS INSPECTION NOTES House is locked. Need access for inspection FRC110.1 | |||
| ELECTRIC - EARLY POWER | 11/05/2025 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: House is locked. Need access for inspection FRC110.1 | |||
| ROW- PRE-APRON (PRE-POUR) | 10/21/2025 | APPROVED | TPOLACEK |
| Note: 10-21-25 POLACEK*** READY TO LAY PAVERS, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/17/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS Inspector Notes from Inspection 9470 09-03-25 TPOLACEK** BUILDER MUST MAINTAIN SITE THROUGHOUT THE ENTIRE BUILD. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25 YOU ARE REQUIRED TO HAVE SILT FENCE ACROSS THE FRONT OF SITE ON EITHER SIDE OF THE CONSTRUCTION ENTRANCE. YOU WILL BE GIVEN UNTIL 9/3/25 TO ADD SILT FENCE AS REQUIRED PER COPC RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE STANDARDS. __________________________________________________________________________________________________________________________ 8/29/2025 - PREVIOUS INSPECTION NOTES 08/29/25 TPOLACEK*** SITE CONDITIONS REMAIN UNCHANGED. BUILDER WILL NEED TO MAKE CORRECTION BY TUESDAY OF THERE WILL BE A STOP WORK ORDER PLACED ON SITE. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/28/2025 - PREVIOUS INSPECTION NOTES SPOKE WITH AUSTIN AND WILL GIVE AN ADDITIONAL DAY TO MAKE CORRECTIONS 8/27/2025 - PREVIOUS INSPECTION NOTES 08/27/25 TPOLACEK**** PERMIT IS PLACED ON HOLD UNTIL ILLICIT DISCHARGE OF CONCRETE IS REMOVED. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK *** BUILDER MUST REMOVE OVER POUR CONCRETE FROM SITE, THIS IS AN ILLICIT DISCHARGE AND MAY CONTAMINATE THE STORMWATER SYSTEM YOU WILL HAVE 24 TO REMOVE CONCRETE. BUILDER WILL HAVE 7 DAYS TO REESTABLISH TEMPORARY PIPE AND INSTALL RESIDENTIAL CONSTRUCTION ENTRANCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW- PAVER RESTRAINTS | 10/17/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 10/17/2025 | PARTIALLY APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS Inspector Notes from Inspection 9470 09-03-25 TPOLACEK** BUILDER MUST MAINTAIN SITE THROUGHOUT THE ENTIRE BUILD. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25 YOU ARE REQUIRED TO HAVE SILT FENCE ACROSS THE FRONT OF SITE ON EITHER SIDE OF THE CONSTRUCTION ENTRANCE. YOU WILL BE GIVEN UNTIL 9/3/25 TO ADD SILT FENCE AS REQUIRED PER COPC RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE STANDARDS. __________________________________________________________________________________________________________________________ 8/29/2025 - PREVIOUS INSPECTION NOTES 08/29/25 TPOLACEK*** SITE CONDITIONS REMAIN UNCHANGED. BUILDER WILL NEED TO MAKE CORRECTION BY TUESDAY OF THERE WILL BE A STOP WORK ORDER PLACED ON SITE. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/28/2025 - PREVIOUS INSPECTION NOTES SPOKE WITH AUSTIN AND WILL GIVE AN ADDITIONAL DAY TO MAKE CORRECTIONS 8/27/2025 - PREVIOUS INSPECTION NOTES 08/27/25 TPOLACEK**** PERMIT IS PLACED ON HOLD UNTIL ILLICIT DISCHARGE OF CONCRETE IS REMOVED. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK *** BUILDER MUST REMOVE OVER POUR CONCRETE FROM SITE, THIS IS AN ILLICIT DISCHARGE AND MAY CONTAMINATE THE STORMWATER SYSTEM YOU WILL HAVE 24 TO REMOVE CONCRETE. BUILDER WILL HAVE 7 DAYS TO REESTABLISH TEMPORARY PIPE AND INSTALL RESIDENTIAL CONSTRUCTION ENTRANCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| INSULATION | 09/15/2025 | APPROVED | CVANSTRAHLEN |
| GRAVITY SEWER TEST | 09/15/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 THIS WASA VIRTUAL INSPECTION FBC-3303.5 SWALE BLOCKED BY PORTABLE | |||
| SEWER TIE IN | 09/15/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION FBC-3303.5 SWALE BLOCKED BY PORTABLE | |||
| LATH/BRICK/ WATER BARRIER | 09/09/2025 | APPROVED | CVANSTRAHLEN |
| ALL ROUGH | 09/09/2025 | APPROVED | CVANSTRAHLEN |
| ALL ROUGH | 09/04/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS ( side B) #2-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE ( side A & B ) #3- Bathrooms Exhausted fans for unit A & B need @ points of security by unit and flex #4-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( back door on SIde A / Back and front door on Side B) | |||
| ROW - DRAINAGE | 09/03/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 09-03-25 TPOLACEK** BUILDER MUST MAINTAIN SITE THROUGHOUT THE ENTIRE BUILD. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25 YOU ARE REQUIRED TO HAVE SILT FENCE ACROSS THE FRONT OF SITE ON EITHER SIDE OF THE CONSTRUCTION ENTRANCE. YOU WILL BE GIVEN UNTIL 9/3/25 TO ADD SILT FENCE AS REQUIRED PER COPC RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE STANDARDS. __________________________________________________________________________________________________________________________ 8/29/2025 - PREVIOUS INSPECTION NOTES 08/29/25 TPOLACEK*** SITE CONDITIONS REMAIN UNCHANGED. BUILDER WILL NEED TO MAKE CORRECTION BY TUESDAY OF THERE WILL BE A STOP WORK ORDER PLACED ON SITE. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/28/2025 - PREVIOUS INSPECTION NOTES SPOKE WITH AUSTIN AND WILL GIVE AN ADDITIONAL DAY TO MAKE CORRECTIONS 8/27/2025 - PREVIOUS INSPECTION NOTES 08/27/25 TPOLACEK**** PERMIT IS PLACED ON HOLD UNTIL ILLICIT DISCHARGE OF CONCRETE IS REMOVED. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK *** BUILDER MUST REMOVE OVER POUR CONCRETE FROM SITE, THIS IS AN ILLICIT DISCHARGE AND MAY CONTAMINATE THE STORMWATER SYSTEM YOU WILL HAVE 24 TO REMOVE CONCRETE. BUILDER WILL HAVE 7 DAYS TO REESTABLISH TEMPORARY PIPE AND INSTALL RESIDENTIAL CONSTRUCTION ENTRANCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 09/02/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 9/2/25 YOU ARE REQUIRED TO HAVE SILT FENCE ACROSS THE FRONT OF SITE ON EITHER SIDE OF THE CONSTRUCTION ENTRANCE. YOU WILL BE GIVEN UNTIL 9/3/25 TO ADD SILT FENCE AS REQUIRED PER COPC RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE STANDARDS. NEXT COMPLIANCE REINSPECTION 9/3/25. __________________________________________________________________________________________________________________________ 8/29/2025 - PREVIOUS INSPECTION NOTES 08/29/25 TPOLACEK*** SITE CONDITIONS REMAIN UNCHANGED. BUILDER WILL NEED TO MAKE CORRECTION BY TUESDAY OF THERE WILL BE A STOP WORK ORDER PLACED ON SITE. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/28/2025 - PREVIOUS INSPECTION NOTES SPOKE WITH AUSTIN AND WILL GIVE AN ADDITIONAL DAY TO MAKE CORRECTIONS 8/27/2025 - PREVIOUS INSPECTION NOTES 08/27/25 TPOLACEK**** PERMIT IS PLACED ON HOLD UNTIL ILLICIT DISCHARGE OF CONCRETE IS REMOVED. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK *** BUILDER MUST REMOVE OVER POUR CONCRETE FROM SITE, THIS IS AN ILLICIT DISCHARGE AND MAY CONTAMINATE THE STORMWATER SYSTEM YOU WILL HAVE 24 TO REMOVE CONCRETE. BUILDER WILL HAVE 7 DAYS TO REESTABLISH TEMPORARY PIPE AND INSTALL RESIDENTIAL CONSTRUCTION ENTRANCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 08/29/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 08/29/25 TPOLACEK*** SITE CONDITIONS REMAIN UNCHANGED. BUILDER WILL NEED TO MAKE CORRECTION BY TUESDAY OF THERE WILL BE A STOP WORK ORDER PLACED ON SITE. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/28/2025 - PREVIOUS INSPECTION NOTES SPOKE WITH AUSTIN AND WILL GIVE AN ADDITIONAL DAY TO MAKE CORRECTIONS 8/27/2025 - PREVIOUS INSPECTION NOTES 08/27/25 TPOLACEK**** PERMIT IS PLACED ON HOLD UNTIL ILLICIT DISCHARGE OF CONCRETE IS REMOVED. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK *** BUILDER MUST REMOVE OVER POUR CONCRETE FROM SITE, THIS IS AN ILLICIT DISCHARGE AND MAY CONTAMINATE THE STORMWATER SYSTEM YOU WILL HAVE 24 TO REMOVE CONCRETE. BUILDER WILL HAVE 7 DAYS TO REESTABLISH TEMPORARY PIPE AND INSTALL RESIDENTIAL CONSTRUCTION ENTRANCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 08/28/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: SPOKE WITH AUSTIN AND WILL GIVE AN ADDITIONAL DAY TO MAKE CORRECTIONS 8/27/2025 - PREVIOUS INSPECTION NOTES 08/27/25 TPOLACEK**** PERMIT IS PLACED ON HOLD UNTIL ILLICIT DISCHARGE OF CONCRETE IS REMOVED. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK *** BUILDER MUST REMOVE OVER POUR CONCRETE FROM SITE, THIS IS AN ILLICIT DISCHARGE AND MAY CONTAMINATE THE STORMWATER SYSTEM YOU WILL HAVE 24 TO REMOVE CONCRETE. BUILDER WILL HAVE 7 DAYS TO REESTABLISH TEMPORARY PIPE AND INSTALL RESIDENTIAL CONSTRUCTION ENTRANCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 08/27/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 08/27/25 TPOLACEK**** PERMIT IS PLACED ON HOLD UNTIL ILLICIT DISCHARGE OF CONCRETE IS REMOVED. =+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK *** BUILDER MUST REMOVE OVER POUR CONCRETE FROM SITE, THIS IS AN ILLICIT DISCHARGE AND MAY CONTAMINATE THE STORMWATER SYSTEM YOU WILL HAVE 24 TO REMOVE CONCRETE. BUILDER WILL HAVE 7 DAYS TO REESTABLISH TEMPORARY PIPE AND INSTALL RESIDENTIAL CONSTRUCTION ENTRANCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 08/26/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 08/26/25 TPOLACEK *** BUILDER MUST REMOVE OVER POUR CONCRETE FROM SITE, THIS IS AN ILLICIT DISCHARGE AND MAY CONTAMINATE THE STORMWATER SYSTEM YOU WILL HAVE 24 TO REMOVE CONCRETE. BUILDER WILL HAVE 7 DAYS TO REESTABLISH TEMPORARY PIPE AND INSTALL RESIDENTIAL CONSTRUCTION ENTRANCE. *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| FIREWALL FINAL | 08/19/2025 | APPROVED | CVANSTRAHLEN |
| ROOF VALLEY & METAL | 08/15/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ROOF VALLEY & METAL | 08/13/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Remove silt fence from swale to allow water to flow freely. FBC 3303.5 2. Per manufacture specs and roofing worksheet, entire deck must be cover with 2 layer of synthetic underlayment, first run of underlayment at drip edge is only one layer. | |||
| FIREWALL DRYWALL NAILING | 08/12/2025 | APPROVED | CVANSTRAHLEN |
| WALL SHEATHING | 08/06/2025 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/06/2025 | APPROVED | CVANSTRAHLEN |
| FIREWALL FRAMING | 08/06/2025 | APPROVED | CVANSTRAHLEN |
| TIE BEAM / LINTEL | 07/22/2025 | APPROVED | CVANSTRAHLEN |
| MONOLITHIC SLAB | 07/03/2025 | APPROVED | CVANSTRAHLEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/01/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: FBC-3303.5 SWALE BLOCKED BY PORTABLE | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 07/01/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/30/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 06/13/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/06/2026 | 01/07/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/29/2025 | 09/29/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/16/2025 | 09/17/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/16/2025 | 09/17/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/16/2025 | 09/17/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in original agreement | |||
| MECH | COMPLETE | 09/08/2025 | 09/08/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/04/2025 | 09/05/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout is missing returns in bedrooms | |||
| SW1 | COMPLETE | 07/14/2025 | 07/15/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/14/2025 | 07/14/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/01/2025 | 07/01/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/01/2025 | 07/01/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/27/2025 | 06/27/2025 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please repload under the correct document type - geo tech certification and rename your file the same. | |||
| BLD | COMPLETE | 06/27/2025 | 06/30/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/30/2025 | 06/02/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/30/2025 | 06/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/30/2025 | 05/30/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/27/2025 | 05/29/2025 |
| Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM Missing proposed flow elevations on the left side of the property near the front | |||
| ENGIN1 | COMPLETE | 05/27/2025 | 05/28/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/27/2025 | 05/27/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/12/2025 | 05/12/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/12/2025 | 05/15/2025 |
| Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM 1- Berm shall be at the 5' easement to minimize impact to reserved parcel. 2- Base on the elevations on the right and left property lines the berm is not needed on either side. | |||
| BLD | COMPLETE | 05/12/2025 | 05/19/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/12/2025 | 05/13/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/02/2025 | 05/22/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/01/2025 | 05/08/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/01/2025 | 05/08/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Plan sheet 2 has "Upper tennant firewall detail" - calls for draftstop in attic and 5/8 type X on ceilings. Plan sheet 3 has Exception 2 in a box stating the same.. Also on PS 3 you have firewall detail utilizing detail U338. Which one are you using? If going with 5/8 type X on ceilings, remove U338 refrence off plans. If using U338 detail, please include the detail drawing as you did for the U905 detail. | |||
| CUSVC | COMPLETE | 05/01/2025 | 05/08/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/01/2025 | 05/05/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/01/2025 | 05/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/01/2025 | 05/02/2025 |
| LOCATE | COMPLETE | 05/01/2025 | 05/06/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/01/2025 | 05/02/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/01/2025 | 05/07/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) BENCHMARK NEEDS TO BE IN A POWER POLE OR A FIRE HYDRANT OR MANHOLE PER CITY CODE 300.01 B(9) 2) THE BERM IS NOT NEEDED ON THE SIDE OF THE LOT DUE TO THE PROPERTY LINE ELEVATIONS 3) THE BERM IN THE BACK CAN NOT BE MORE THEN 5' OFF THE BACK PROPERTY LINE DUE TO THE 2:1 SLOPE FOR THE RESERVE PARCEL. | |||
| ZON | HOLD | 05/01/2025 | 05/02/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveways must be a minimum 16ft on each side so driveway should total 32ft in width |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/09/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/06/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/06/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/06/2026 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 01/06/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/02/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/05/2025 |
| SW ENG PRE APRON | ¤30.00 | 06/05/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/05/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/05/2025 |
| WATER METER W/ TAP | ¤4,653.86 | 06/05/2025 |
| SEWER CREDIT | (¤2,294.00) | 06/05/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 06/05/2025 |
| WASTEWATER PERM REVIEW | ¤100.00 | 06/05/2025 |
| SEWER CAPITAL FACILITY | ¤8,830.00 | 06/05/2025 |
| WATER CAPITAL FACILITY FEE | ¤7,580.98 | 06/05/2025 |
| WATER PERMIT INSPECTION | ¤80.00 | 06/05/2025 |
| WATER MAIN EXTENSION IMPACT | ¤1,834.54 | 06/05/2025 |
| SITE PLAN 30 | ¤30.00 | 06/05/2025 |
| WATER- TURN ON | ¤100.00 | 06/05/2025 |
| ADJUSTMENT 10% | (¤166.09) | 06/05/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/05/2025 |
| INSPECTION - RESIDENTIAL | ¤1,270.50 | 06/05/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤360.36 | 06/05/2025 |
| IMPACT FEE TRANSPORTATION | ¤2,974.00 | 06/05/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤4,770.00 | 06/05/2025 |
| SURCHARGE FS 533.721 | ¤14.95 | 06/05/2025 |
| SURCHARGE - FS 468.631 | ¤22.42 | 06/05/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/05/2025 |
| FC IMPACT FEE EMS | ¤124.00 | 06/05/2025 |
| IMPACT FEE FIRE | ¤869.02 | 06/05/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 06/05/2025 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 06/05/2025 |
| IMPACT FEE PARKS | ¤3,656.02 | 06/05/2025 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 06/05/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤47,507.56 |