Permit #2025050139
Permit Details
Status: EXPIRED
| Parcel Id: 07-11-31-7012-00160-0560 |
| Total Square Footage: 1000 sqft |
| Block: 00160 |
| Subdivision: 7012 - |
| Job Phone: 386-237-5837 |
| Location Address: 50 BASSETT LN |
| Type: DR - DRIVEWAY |
| Issue Date: 07/21/2025 |
| NOC: RECORDED |
| Applicant name: MARSEL GILMANSHIN |
| Owner: SMITH SHANYN L |
|
Address 50 BASSETT LANE PALM COAST, FL 32137 |
| Lot: 0560 |
| Contracted Stated Job Value: ¤14,000.00 |
| Job Description: PAVER DRIVEWAY |
| Type: CN |
Contractor
GILMANS DEVELOPMENT CORP
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4873 PALM COAST PARKWAY NW #4 PALM COAST, FL 32137 |
CBC1263180 (Exp: 08/31/2026) | 386-237-5837 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 08/27/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 08/19/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/19/25 READY TO SET PAVERS ** CULVERT ELEVATION IS GOOD ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED _________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED 8/14/2025 - PREVIOUS INSPECTION NOTES ** 08/14/25 CANCELLED BY BUILDER ON SITE | |||
| ROW- PAVER RESTRAINTS | 08/15/2025 | APPROVED | EMADISON |
| Note: ** 08/15/25 READY TO POUR PAVER RESTRAINTS WITH APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/15/2025 | PARTIALLY APPROVED | EMADISON |
| Note: ** 08/15/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED 8/14/2025 - PREVIOUS INSPECTION NOTES ** 08/14/25 CANCELLED BY BUILDER ON SITE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/14/2025 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 08/14/25 CANCELLED BY BUILDER ON SITE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/13/2025 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 07/18/2025 | 07/18/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/05/2025 | 05/05/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 05/05/2025 | 05/06/2025 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/05/2025 | 05/05/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utilization Agreement for Paver Driveway. | |||
| SWALE | COMPLETE | 05/05/2025 | 05/13/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤3.00) | 07/21/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/21/2025 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 07/21/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 07/21/2025 |
| SW ENG PRE APRON | ¤30.00 | 07/21/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/21/2025 |
| SITE PLAN 15 | ¤15.00 | 07/21/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤356.00 |