Permit #2025050414
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00130-0010 |
| CONDITIONED SPACE: 1873 sqft |
| OPENED PORCH (WITH ROOF) : 249 sqft |
| GARAGE: 759 sqft |
| Total Square Footage: 2881 sqft |
| Block: 00130 |
| Subdivision: 7012 - |
| Job Phone: 352-433-8382 |
| Location Address: 1 BARBERA LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/18/2025 |
| NOC: RECORDED |
| Applicant name: ALFREDO E SCHEER |
| Owner: ESTELA SPECS 6 LLC |
|
Address 2601 SOUTH BAYSHORE DRIVE MIAMI, FL 33133 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤165,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
ESTELA LIVING LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
237 S. DIXIE HWY, 4TH FLOOR CORAL GABLES, FL 33133 |
CGC1534535 (Exp: 08/31/2026) | 352-433-8382 |
Sub Contractors
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 01/09/2026 | FINAL APPROVED | BHAINES |
| Note: Inspector Notes from Inspection 9035 No IRR. No CC | |||
| ROW - FINAL APRON (AFTER POUR) | 01/08/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/08/2026 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 12-22-25 TPOLACEK*** BUILDING FINAL NEEDS TO BE COMPLTEED BEFORE FIELD CAN BE SCHEDULED HOWEVER, UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 01/08/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U-CROSS CONNECTION | 01/07/2026 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR. No CC | |||
| BLD - BUILDING FINAL | 01/07/2026 | FINAL APPROVED | MCONTRYMAN |
| Note: 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: 1). Dryer gooseneck needs screen removed. FBC M1502.3 2). Heat strip on AHU is not identified. FBCR M1303.1 3). AHU closet wall (and linest sleeve) needs to be sealed where sleeve enters the wall. FBC EC TABLE R402.4.1.1 4). 1 of three locking caps is not locked. FBCR M1411.8 5). LFMC under kitchen cabinet needs to be secured within 12in. of switch box. NEC 350.30(A) 6). Attic light is not working. (Pull chain switch jammed/broken). NEC-210.70(2)(C) 7). drywall screws in attic door framing need to be removed so drywall panel can sit flush with ceiling. FBC-R302.11 8). Dryer exhaust box needs to be sealed around perimeter and duct needs to be taped off properly. FBC EC TABLE R402.4.1.1 / FBC-M1502.4.7 9). Guest bathroom: Bathtub spout needs to be sealed at wall. FBC-P2705.1(3) 10). Guest bathroom: Left side vanity faucet > hot & cold water are switched. FBCR P2722.2 11). Front entry door: anchors in frame are not sealed to make weatherproof. FBC [A] 107.4 | |||
| BLD - BUILDING FINAL | 12/23/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 12/23/25: 1). Dryer gooseneck needs screen removed. FBC M1502.3 2). Heat strip on AHU is not identified. FBCR M1303.1 3). AHU closet wall (and linest sleeve) needs to be sealed where sleeve enters the wall. FBC EC TABLE R402.4.1.1 4). 1 of three locking caps is not locked. FBCR M1411.8 5). LFMC under kitchen cabinet needs to be secured within 12in. of switch box. NEC 350.30(A) 6). Attic light is not working. (Pull chain switch jammed/broken). NEC-210.70(2)(C) 7). drywall screws in attic door framing need to be removed so drywall panel can sit flush with ceiling. FBC-R302.11 8). Dryer exhaust box needs to be sealed around perimeter and duct needs to be taped off properly. FBC EC TABLE R402.4.1.1 / FBC-M1502.4.7 9). Guest bathroom: Bathtub spout needs to be sealed at wall. FBC-P2705.1(3) 10). Guest bathroom: Left side vanity faucet > hot & cold water are switched. FBCR P2722.2 11). Front entry door: anchors in frame are not sealed to make weatherproof. FBC [A] 107.4 | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/22/2025 | APPROVED | TPOLACEK |
| Note: 12/17/2025 - PREVIOUS INSPECTION NOTES 12-17-25 TPOLACEK** PLEASE SEE ATTACHED PHOTO AND READ NOTES, THE SWALE PLAN DIAGRAM INDICATES THE HIGH POINT OF THE SWALE IS ON THE CORNER. DRAINAGE SHOULD SPLIT AND FLOW ACCORDING TO DESIGN. THE MAX ALLOWED DEVIATION IS .10 +/- . Building Residential Final Survey Plan Reviews Technical Manual, Section 300.01(A)(1) (C)(1) (V-17) The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 of a foot and must demonstrate a positive fall in the direction described in the Swale Plan. (E)Technical Manual, Section 300.01(A)(1) (C)(1) (V-17) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/17/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 12-17-25 TPOLACEK** PLEASE SEE ATTACHED PHOTO AND READ NOTES, THE SWALE PLAN DIAGRAM INDICATES THE HIGH POINT OF THE SWALE IS ON THE CORNER. DRAINAGE SHOULD SPLIT AND FLOW ACCORDING TO DESIGN. THE MAX ALLOWED DEVIATION IS .10 +/- . Building Residential Final Survey Plan Reviews Technical Manual, Section 300.01(A)(1) (C)(1) (V-17) The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 of a foot and must demonstrate a positive fall in the direction described in the Swale Plan. (E)Technical Manual, Section 300.01(A)(1) (C)(1) (V-17) | |||
| ROW- PRE-APRON (PRE-POUR) | 11/21/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. | |||
| ELECTRIC - EARLY POWER | 11/21/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 11am | |||
| ELECTRIC - EARLY POWER | 11/14/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Overhead service wires coming out of weather head must have separatly bushed openings NEC 250.54(E) | |||
| GRAVITY SEWER TEST | 11/13/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 11/13/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| ROW - DRAINAGE | 11/07/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 11/6/2025 - PREVIOUS INSPECTION NOTES 11-06-25 TPOLACEK*** SPOKE WITH BUILDER AND THE ASKED IF IT WERE POSSIBLE TO GIVE THEM MORE TIME. I WILL CANCEL TODAYS INSPECTION AND SCHEDULE RETURN FOR TOMORROW AT WHICH TIME IF CONDITIONS ARE NOT CORRECTED PERMIT WILL BE PLACED ON HOLD. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/5/2025 - PREVIOUS INSPECTION NOTES 11-05-25 TPOLACEK*** BUILDER HAS 24 HOURS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/4/2025 - PREVIOUS INSPECTION NOTES 11-04-25 TPOLACEK**** SITE CONDITIONS REMAIN THE SAME SEE TODAYS PHOTOS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/30/2025 - PREVIOUS INSPECTION NOTES ** 10/30/25 BUILDER IS REQUIRED TO REMOVE DUMPED CONCRETE OUT OF THE ROADSIDE SWALE IN (2) TWO LOCATIONS OF THE CONSTRUCTION SITE (1) AREA ON THE BARBERA LN SIDE OF THE SITE (2) ON THE BARRINGTON LN SIDE OF YOUR SITE ** REMOVE ALL CONSTRUCTION DEBRIS AND TRASH OUT OF THE ROADSIDE SWALE (ROW) ** REMOVE PILE OF BARK MULCH OUT OF THE (ROW) ** PICKUP ALL TRASH AND CONSTRUCTION DEBRIS SCATTERED ON SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTIONS ON 11/04 | |||
| ROW - DRAINAGE | 11/06/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 11-06-25 TPOLACEK*** SPOKE WITH BUILDER AND THE ASKED IF IT WERE POSSIBLE TO GIVE THEM MORE TIME. I WILL CANCEL TODAYS INSPECTION AND SCHEDULE RETURN FOR TOMORROW AT WHICH TIME IF CONDITIONS ARE NOT CORRECTED PERMIT WILL BE PLACED ON HOLD. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/5/2025 - PREVIOUS INSPECTION NOTES 11-05-25 TPOLACEK*** BUILDER HAS 24 HOURS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/4/2025 - PREVIOUS INSPECTION NOTES 11-04-25 TPOLACEK**** SITE CONDITIONS REMAIN THE SAME SEE TODAYS PHOTOS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/30/2025 - PREVIOUS INSPECTION NOTES ** 10/30/25 BUILDER IS REQUIRED TO REMOVE DUMPED CONCRETE OUT OF THE ROADSIDE SWALE IN (2) TWO LOCATIONS OF THE CONSTRUCTION SITE (1) AREA ON THE BARBERA LN SIDE OF THE SITE (2) ON THE BARRINGTON LN SIDE OF YOUR SITE ** REMOVE ALL CONSTRUCTION DEBRIS AND TRASH OUT OF THE ROADSIDE SWALE (ROW) ** REMOVE PILE OF BARK MULCH OUT OF THE (ROW) ** PICKUP ALL TRASH AND CONSTRUCTION DEBRIS SCATTERED ON SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTIONS ON 11/04 | |||
| ROW - DRAINAGE | 11/05/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11-05-25 TPOLACEK*** BUILDER HAS 24 HOURS TO COMPLY BEFORE PERMIT IS PLACED ON HOLD. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/4/2025 - PREVIOUS INSPECTION NOTES 11-04-25 TPOLACEK**** SITE CONDITIONS REMAIN THE SAME SEE TODAYS PHOTOS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/30/2025 - PREVIOUS INSPECTION NOTES ** 10/30/25 BUILDER IS REQUIRED TO REMOVE DUMPED CONCRETE OUT OF THE ROADSIDE SWALE IN (2) TWO LOCATIONS OF THE CONSTRUCTION SITE (1) AREA ON THE BARBERA LN SIDE OF THE SITE (2) ON THE BARRINGTON LN SIDE OF YOUR SITE ** REMOVE ALL CONSTRUCTION DEBRIS AND TRASH OUT OF THE ROADSIDE SWALE (ROW) ** REMOVE PILE OF BARK MULCH OUT OF THE (ROW) ** PICKUP ALL TRASH AND CONSTRUCTION DEBRIS SCATTERED ON SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTIONS ON 11/04 | |||
| ROW - DRAINAGE | 11/04/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11-04-25 TPOLACEK**** SITE CONDITIONS REMAIN THE SAME SEE TODAYS PHOTOS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/30/2025 - PREVIOUS INSPECTION NOTES ** 10/30/25 BUILDER IS REQUIRED TO REMOVE DUMPED CONCRETE OUT OF THE ROADSIDE SWALE IN (2) TWO LOCATIONS OF THE CONSTRUCTION SITE (1) AREA ON THE BARBERA LN SIDE OF THE SITE (2) ON THE BARRINGTON LN SIDE OF YOUR SITE ** REMOVE ALL CONSTRUCTION DEBRIS AND TRASH OUT OF THE ROADSIDE SWALE (ROW) ** REMOVE PILE OF BARK MULCH OUT OF THE (ROW) ** PICKUP ALL TRASH AND CONSTRUCTION DEBRIS SCATTERED ON SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTIONS ON 11/04 | |||
| ROW - DRAINAGE | 10/30/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/30/25 BUILDER IS REQUIRED TO REMOVE DUMPED CONCRETE OUT OF THE ROADSIDE SWALE IN (2) TWO LOCATIONS OF THE CONSTRUCTION SITE (1) AREA ON THE BARBERA LN SIDE OF THE SITE (2) ON THE BARRINGTON LN SIDE OF YOUR SITE ** REMOVE ALL CONSTRUCTION DEBRIS AND TRASH OUT OF THE ROADSIDE SWALE (ROW) ** REMOVE PILE OF BARK MULCH OUT OF THE (ROW) ** PICKUP ALL TRASH AND CONSTRUCTION DEBRIS SCATTERED ON SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTIONS ON 11/04 | |||
| INSULATION | 10/15/2025 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 1. Repair Nail shield at Dryer duct TP. FBCR M1308.2 2. Install steel strap at TP for dryer duct Notched over 50%. FBC R602.6.1 3. Seal dryer duct roof Penetration. FBCR M1601.4.1 4. Seal All Bath exhaust duct at roof penetration. FBCR M1601.4.1 5. Seal Duct connections at distribution boxes at gaps/missing Mastic. 6. 5ft Head fail (empty). FBCR P2503.7 Will check at Insulation. | |||
| LATH/BRICK/ WATER BARRIER | 10/15/2025 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 1. Repair Nail shield at Dryer duct TP. FBCR M1308.2 2. Install steel strap at TP for dryer duct Notched over 50%. FBC R602.6.1 3. Seal dryer duct roof Penetration. FBCR M1601.4.1 4. Seal All Bath exhaust duct at roof penetration. FBCR M1601.4.1 5. Seal Duct connections at distribution boxes at gaps/missing Mastic. 6. 5ft Head fail (empty). FBCR P2503.7 Will check at Insulation. | |||
| ALL ROUGH | 10/09/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: 1. Repair Nail shield at Dryer duct TP. FBCR M1308.2 2. Install steel strap at TP for dryer duct Notched over 50%. FBC R602.6.1 3. Seal dryer duct roof Penetration. FBCR M1601.4.1 4. Seal All Bath exhaust duct at roof penetration. FBCR M1601.4.1 5. Seal Duct connections at distribution boxes at gaps/missing Mastic. 6. 5ft Head fail (empty). FBCR P2503.7 Will check at Insulation. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/08/2025 | APPROVED | FWILLIS |
| Note: ITEMS CORRECTED 10/2/2025 - PREVIOUS INSPECTION NOTES 10/2/25 1. Missing all stud to block anchors per plan 2. Missing all hold downs/anchors on bearing walls to floor per plan 3. A06 missing engineering | |||
| ROOF VALLEY & METAL | 10/03/2025 | APPROVED | MCONTRYMAN |
| WALL SHEATHING | 10/03/2025 | APPROVED | MCONTRYMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/02/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 10/2/25 1. Missing all stud to block anchors per plan 2. Missing all hold downs/anchors on bearing walls to floor per plan 3. A06 missing engineering | |||
| TIE BEAM / LINTEL | 09/18/2025 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 09/10/2025 | APPROVED | FWILLIS |
| Note: 9/8/2025 - PREVIOUS INSPECTION NOTES 9/5/2025 - PREVIOUS INSPECTION NOTES NO PLASTIC, NO REBAR, NO UFER, NO COMPACTION, NO FOOTER. FBC107, FBC R404.1.33, FBC R506.2.3, NEC 250.52, FBCR 318 9/8/25 - NO UFER GROUND AS REQUIRED NEC 250.52. PLEASE HAVE PLANS ON SITE ORGANIZED, CLEAN AND IN NUMERICAL ORDER FOR INSPECTORS AND APPROVED. FBC107.3.1. | |||
| MONOLITHIC SLAB | 09/08/2025 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: 9/5/2025 - PREVIOUS INSPECTION NOTES NO PLASTIC, NO REBAR, NO UFER, NO COMPACTION, NO FOOTER. FBC107, FBC R404.1.33, FBC R506.2.3, NEC 250.52, FBCR 318 9/8/25 - NO UFER GROUND AS REQUIRED NEC 250.52. PLEASE HAVE PLANS ON SITE ORGANIZED, CLEAN AND IN NUMERICAL ORDER FOR INSPECTORS AND APPROVED. FBC107.3.1. | |||
| MONOLITHIC SLAB | 09/05/2025 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: NO PLASTIC, NO REBAR, NO UFER, NO COMPACTION, NO FOOTER. FBC107, FBC R404.1.33, FBC R506.2.3, NEC 250.52, FBCR 318 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/02/2025 | APPROVED | MGIBSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 08/29/2025 | APPROVED | RRICKS |
| Note: Approved as noted. Please ensure that during pour formboards and foundation stay within 10" tolerance of adjacent lot. | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 08/29/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 07/18/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/06/2025 | 10/08/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/29/2025 | 08/29/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Formboard survey approved as noted. I talked to Doug and he is going to upload the site plan with the benchmark completely shown. Note: Benchmark has not changed per discussion. | |||
| BLD | COMPLETE | 08/29/2025 | 08/29/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/29/2025 | 08/29/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/29/2025 | 08/29/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/29/2025 | 08/29/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/26/2025 | 08/28/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM AS STATED FROM LAST REVIEW YOU NEED TO RESUBMIT A NEW SITE PLAN THAT THE BENCHMARK IS NOT CUT OFF BEFORE PASSING FORM BOARD SURVEY | |||
| BLD | HOLD | 08/26/2025 | 08/29/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech certification letter needs to be digitally signed, sealed, and verifiable. 2nd Request | |||
| ZON | COMPLETE | 08/26/2025 | 08/27/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/25/2025 | 08/26/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech certification letter needs to be digitally signed, sealed, and verifiable. | |||
| SW1 | HOLD | 08/22/2025 | 08/25/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Formboard survey FFE shall be to the nearest 0.01. Corrections Needed: 1. Submit revised site plan with benchmark not cut off. 2. Submit formboard survey with FFE to the nearest 0.01. | |||
| ZON | COMPLETE | 08/22/2025 | 08/22/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/12/2025 | 06/16/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved contingent on final survey. Note: Based on the proposed FFE for this lot, there is only 0.1' tolerance to the upside when the formboards are constructed and the slab is poured. Any considerable deviations may result in a hold at the very least. | |||
| ENGIN1 | COMPLETE | 06/12/2025 | 06/13/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/12/2025 | 06/12/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/06/2025 | 06/06/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM After further review the shall be a 6" fall in the first 10' of home. In the front yard on the right side there is no 6" fall in the first 10' | |||
| SW1 | COMPLETE | 06/03/2025 | 06/06/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/03/2025 | 06/04/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/03/2025 | 06/03/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/28/2025 | 05/28/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/28/2025 | 05/30/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM On the right side along the property line the last two proposed elevations exceed the 4:1 slope. Please depict the drainage swale 6 feet off the right property line for both of these proposed elevations to meet the COPC standards. Please feel free to call or email if there are any questions. | |||
| ENGIN1 | COMPLETE | 05/28/2025 | 05/29/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/20/2025 | 05/20/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Setbacks are missing on site plan/survey | |||
| SW1 | HOLD | 05/20/2025 | 05/20/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM STILL NEED TO MOVE THE DRAINAGE PATTERN IN THE BACK ON THE PROPOERTY LINE OR WITH IN THE 5' EASEMENT | |||
| BLD | COMPLETE | 05/20/2025 | 05/27/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/20/2025 | 05/20/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/09/2025 | 05/16/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/09/2025 | 05/16/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Truss layout from manufacturer missing. | |||
| CUSVC | COMPLETE | 05/09/2025 | 05/15/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/09/2025 | 05/12/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/09/2025 | 05/09/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/09/2025 | 05/13/2025 |
| LOCATE | COMPLETE | 05/09/2025 | 05/13/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/09/2025 | 05/14/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/09/2025 | 05/14/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) THE DRAINAGE PATTERN I N BACK NEEDS TO BE MOVE TO THE BACK PROPERTY LINE DUE TO THE LOT BEHIND THIS PROPOSED HOME IS UNDER CONSTRUCTION. 2) THE DRAINAGE PATTERN IN THE BACK ON THIS SITE PLAN DOESNT HAVE POSITIVE FALL WITH THE ARROWS THAT IS ON THE GRADING PLAN | |||
| ZON | HOLD | 05/09/2025 | 05/12/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Windows facing right of way must have banding (left side) Walkway width and material missing on site plan/survey | |||
| SWALE | COMPLETE | 05/09/2025 | 06/03/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 02/13/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 02/13/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 02/13/2026 |
| RSI REINSPECTION 2 | ¤75.00 | 02/13/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/13/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/13/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/13/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/13/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 06/18/2025 |
| IMPACT FEE FIRE | ¤434.51 | 06/18/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/18/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/18/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 06/18/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/18/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 06/18/2025 |
| WATER- TURN ON | ¤50.00 | 06/18/2025 |
| ADJUSTMENT 10% | (¤136.79) | 06/18/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/18/2025 |
| INSPECTION - RESIDENTIAL | ¤1,042.25 | 06/18/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤295.62 | 06/18/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 06/18/2025 |
| SURCHARGE FS 533.721 | ¤12.31 | 06/18/2025 |
| SURCHARGE - FS 468.631 | ¤18.47 | 06/18/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/18/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/18/2025 |
| SW ENG PRE APRON | ¤30.00 | 06/18/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/18/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/18/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 06/18/2025 |
| SEWER CREDIT | (¤2,465.75) | 06/18/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 06/18/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 06/18/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 06/18/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 06/18/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 06/18/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 06/18/2025 |
| SITE PLAN 30 | ¤30.00 | 06/18/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,707.32 |