I want to search for...
Permit #2025050417
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00180-0060 |
| CONDITIONED SPACE: 1873 sqft |
| OPENED PORCH (WITH ROOF) : 249 sqft |
| GARAGE: 524 sqft |
| Total Square Footage: 2646 sqft |
| Block: 00180 |
| Subdivision: - |
| Job Phone: 352-433-8382 |
| Location Address: 34 RYLEY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/16/2025 |
| NOC: RECORDED |
| Applicant name: ALFREDO E SCHEER |
| Owner: DELEON CARLOS C & MYRNA M |
|
Address 90-04 FRANCIS LEWIS BLVD QUEENS VILLAGE, NY 11428 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤155,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
ESTELA LIVING LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
237 S. DIXIE HWY, 4TH FLOOR CORAL GABLES, FL 33133 |
CGC1534535 (Exp: 08/31/2026) | 352-433-8382 |
Sub Contractors
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 12/15/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 No CC, No IRR | |||
| ROW - STORMWATER FINAL | 12/12/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 12/12/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/12/2025 | APPROVED | TPOLACEK |
| Note: 12/10/2025 - PREVIOUS INSPECTION NOTES 12-10-25 TPOLACEK*** SPOKE WITH BUILDER ABOUT SWALE ELEVATION NOT MEETING REQUIRMENTS 12/5/2025 - PREVIOUS INSPECTION NOTES You need to add elevation along the property line on the left side, .Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. The elevation is going from 28.64 to 28.37. Facing the house on the right side, the swale needs to be centered to the pipe. On Ryland Dr, halfway down to the property line, you need to install a 4/1 slope for the swale; water will be returning to the property. Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/12/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 12/5/25=You need to add elevation along the property line on the left side, .Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. The elevation is going from 28.64 to 28.37. Facing the house on the right side, the swale needs to be centered to the pipe. On Ryland Dr, halfway down to the property line, you need to install a 4/1 slope for the swale; water will be returning to the property. Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. ________________________________________________________________________________________________________________________________ 12/3/2025 - PREVIOUS INSPECTION NOTES 12-3-25 TPOLACEK*** FINAL SURVEY MUST INDICATE TYPE OF CONSTRUCTION TO DETERMINE IF GRADE MEETS REQUIREMENTS, FFE OF GARAGE IS NEEDED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/10/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 12-10-25 TPOLACEK*** SPOKE WITH BUILDER ABOUT SWALE ELEVATION NOT MEETING REQUIRMENTS 12/5/2025 - PREVIOUS INSPECTION NOTES You need to add elevation along the property line on the left side, .Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. The elevation is going from 28.64 to 28.37. Facing the house on the right side, the swale needs to be centered to the pipe. On Ryland Dr, halfway down to the property line, you need to install a 4/1 slope for the swale; water will be returning to the property. Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/05/2025 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: You need to add elevation along the property line on the left side, .Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. The elevation is going from 28.64 to 28.37. Facing the house on the right side, the swale needs to be centered to the pipe. On Ryland Dr, halfway down to the property line, you need to install a 4/1 slope for the swale; water will be returning to the property. Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/03/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 12-3-25 TPOLACEK*** FINAL SURVEY MUST INDICATE TYPE OF CONSTRUCTION TO DETERMINE IF GRADE MEETS REQUIREMENTS, FFE OF GARAGE IS NEEDED | |||
| U-CROSS CONNECTION | 12/02/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR | |||
| BLD - BUILDING FINAL | 12/02/2025 | APPROVED | CVANSTRAHLEN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/01/2025 | APPROVED | FSLADISH |
| ROW- PRE-APRON (PRE-POUR) | 11/10/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/10/25 MAKE SURE ALL PIECES OF ROOTS ARE CUT OUT IN APRON BEFORE POURING. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AT THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. Inspector Notes from Inspection 9470 09-11-25 TPOLACEK*** APPROVING AS NOTED PLEASE READ ALL NOTES**** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/8/2025 - PREVIOUS INSPECTION NOTES 09-08-25 TPOLACEK*** SILT FENCE AND PORTA POTTY STILL NEED TO BE CORRECTED. BUILDER HAS 3 DAY BEFORE PERMIT IS PLACED ON HOLD. THURSDAY 09-11-25 9/4/2025 - PREVIOUS INSPECTION NOTES 09-04-25 TPOLACEK*** PARTIAL APPROVAL FOR CONCRETE BEING REMOVED 9/3/2025 - PREVIOUS INSPECTION NOTES 09-3-25 TPOLACEK*** SILT FENCE IS NOT INSTALLED PROPERLY AND IS FALLING DOWN THERE IS A LARGE OVER POUR OF CONCRETE IN SWALE THAT IS AN ILLICIT DISCHARGE. BUILDER HAS 24 HOURS TO REMOVE THE ILLICIT DISCHARGE AND 3 DAY (MONDAY) TO REPAIR SILT FENCE. BUILDER MUST ALSO REMOVE PORTA JON FROM THE ROW. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| GRAVITY SEWER TEST | 10/22/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION 8/1/2025 - PREVIOUS INSPECTION NOTES P-2503.5 HEAD TEST NOT HOLDING FBCR-3307.1 SILT FENCE SHALL BE IN PLACE BEFORE NEXT INSPECTION | |||
| SEWER TIE IN | 10/22/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION 8/1/2025 - PREVIOUS INSPECTION NOTES P-2503.5 HEAD TEST NOT HOLDING FBCR-3307.1 SILT FENCE SHALL BE IN PLACE BEFORE NEXT INSPECTION Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION 8/1/2025 - PREVIOUS INSPECTION NOTES P-2503.5 HEAD TEST NOT HOLDING FBCR-3307.1 SILT FENCE SHALL BE IN PLACE BEFORE NEXT INSPECTION | |||
| ELECTRIC - EARLY POWER | 10/22/2025 | APPROVED | CVANSTRAHLEN |
| Note: email FPL | |||
| PEP TANK INSTALLATION REQUEST | 10/03/2025 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 09/22/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/22/2025 9:43:27 AM *** | |||
| INSULATION | 09/17/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/17/2025 11:16:53 AM *** 9/17/25: Previously noted item 1 remains unresolved. 1. Left rear bedroom shared wall with kitchen/living area has open hole in top stud FBC 302.11 NOTE: if possible please add firerstop in holes > Horizontally at intervals not exceeding 10 feet (3048 mm). FBC-302.11.1.2 9/16/2025 - PREVIOUS INSPECTION NOTES 9/16/25 1. Left rear bedroom shared wall with kitchen/living area has open hole in top stud FBC 302.11 2. Dryer vent needs to be resealed around top plate FBC 302.11 Inspector Notes from Inspection 2420 Please seal master toilet exhaust duct at roof sheathing. Will check at insulation. | |||
| INSULATION | 09/17/2025 | APPROVED | RSIMS |
| Note: 9/17/2025 - PREVIOUS INSPECTION NOTES 9/17/25: Previously noted item 1 remains unresolved. 1. Left rear bedroom shared wall with kitchen/living area has open hole in top stud FBC 302.11 NOTE: if possible please add firerstop in holes > Horizontally at intervals not exceeding 10 feet (3048 mm). FBC-302.11.1.2 9/16/2025 - PREVIOUS INSPECTION NOTES 9/16/25 1. Left rear bedroom shared wall with kitchen/living area has open hole in top stud FBC 302.11 2. Dryer vent needs to be resealed around top plate FBC 302.11 Inspector Notes from Inspection 2420 Please seal master toilet exhaust duct at roof sheathing. Will check at insulation. | |||
| INSULATION | 09/16/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 9/16/25 1. Left rear bedroom shared wall with kitchen/living area has open hole in top stud FBC 302.11 2. Dryer vent needs to be resealed around top plate FBC 302.11 Inspector Notes from Inspection 2420 Please seal master toilet exhaust duct at roof sheathing. Will check at insulation. | |||
| ROW - DRAINAGE | 09/11/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 09-11-25 TPOLACEK*** APPROVING AS NOTED PLEASE READ ALL NOTES**** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/8/2025 - PREVIOUS INSPECTION NOTES 09-08-25 TPOLACEK*** SILT FENCE AND PORTA POTTY STILL NEED TO BE CORRECTED. BUILDER HAS 3 DAY BEFORE PERMIT IS PLACED ON HOLD. THURSDAY 09-11-25 9/4/2025 - PREVIOUS INSPECTION NOTES 09-04-25 TPOLACEK*** PARTIAL APPROVAL FOR CONCRETE BEING REMOVED 9/3/2025 - PREVIOUS INSPECTION NOTES 09-3-25 TPOLACEK*** SILT FENCE IS NOT INSTALLED PROPERLY AND IS FALLING DOWN THERE IS A LARGE OVER POUR OF CONCRETE IN SWALE THAT IS AN ILLICIT DISCHARGE. BUILDER HAS 24 HOURS TO REMOVE THE ILLICIT DISCHARGE AND 3 DAY (MONDAY) TO REPAIR SILT FENCE. BUILDER MUST ALSO REMOVE PORTA JON FROM THE ROW. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ALL ROUGH | 09/10/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Please seal master toilet exhaust duct at roof sheathing. Will check at insulation. | |||
| WALL SHEATHING | 09/08/2025 | APPROVED | CVANSTRAHLEN |
| Note: Please fix driveway entrance to allow inspector to have access to the construcction side #1-FBC 3307.1-NEEDS SILT FENCE PROPERLY INSTALLED | |||
| ROW - DRAINAGE | 09/08/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 09-08-25 TPOLACEK*** SILT FENCE AND PORTA POTTY STILL NEED TO BE CORRECTED. BUILDER HAS 3 DAY BEFORE PERMIT IS PLACED ON HOLD. THURSDAY 09-11-25 9/4/2025 - PREVIOUS INSPECTION NOTES 09-04-25 TPOLACEK*** PARTIAL APPROVAL FOR CONCRETE BEING REMOVED 9/3/2025 - PREVIOUS INSPECTION NOTES 09-3-25 TPOLACEK*** SILT FENCE IS NOT INSTALLED PROPERLY AND IS FALLING DOWN THERE IS A LARGE OVER POUR OF CONCRETE IN SWALE THAT IS AN ILLICIT DISCHARGE. BUILDER HAS 24 HOURS TO REMOVE THE ILLICIT DISCHARGE AND 3 DAY (MONDAY) TO REPAIR SILT FENCE. BUILDER MUST ALSO REMOVE PORTA JON FROM THE ROW. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 09/04/2025 | PARTIALLY APPROVED | TPOLACEK |
| Note: 09-04-25 TPOLACEK*** PARTIAL APPROVAL FOR CONCRETE BEING REMOVED 9/3/2025 - PREVIOUS INSPECTION NOTES 09-3-25 TPOLACEK*** SILT FENCE IS NOT INSTALLED PROPERLY AND IS FALLING DOWN THERE IS A LARGE OVER POUR OF CONCRETE IN SWALE THAT IS AN ILLICIT DISCHARGE. BUILDER HAS 24 HOURS TO REMOVE THE ILLICIT DISCHARGE AND 3 DAY (MONDAY) TO REPAIR SILT FENCE. BUILDER MUST ALSO REMOVE PORTA JON FROM THE ROW. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 09/03/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 09-3-25 TPOLACEK*** SILT FENCE IS NOT INSTALLED PROPERLY AND IS FALLING DOWN THERE IS A LARGE OVER POUR OF CONCRETE IN SWALE THAT IS AN ILLICIT DISCHARGE. BUILDER HAS 24 HOURS TO REMOVE THE ILLICIT DISCHARGE AND 3 DAY (MONDAY) TO REPAIR SILT FENCE. BUILDER MUST ALSO REMOVE PORTA JON FROM THE ROW. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROOF VALLEY & METAL | 08/28/2025 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2460 Please cleand up job side | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/27/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please cleand up job side | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 08/26/2025 | APPROVED | RRICKS |
| ROW - DRAINAGE | 08/26/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 08/26/2025 | CANCELLED BY INSPECTOR | TPOLACEK |
| Note: 8/26/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| TIE BEAM / LINTEL | 08/20/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| TIE BEAM / LINTEL | 08/18/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE ( missing tie beam & lintel plan ) #2-back left side windoe lintel is damage on right side corner exterior side -FBCR 606.3.1-HEAD AND BED JOINT LIMITS Mark with red sharpie market where need fix #3-left side wall need rebar move to center ( tie beam , Mark with red sharpie market ) | |||
| MONOLITHIC SLAB | 08/06/2025 | APPROVED | CVANSTRAHLEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/04/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: 8/1/2025 - PREVIOUS INSPECTION NOTES P-2503.5 HEAD TEST NOT HOLDING FBCR-3307.1 SILT FENCE SHALL BE IN PLACE BEFORE NEXT INSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/01/2025 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: P-2503.5 HEAD TEST NOT HOLDING | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/25/2025 | APPROVED | CPISCITELLI |
| WATER METER INSTALLATION REQUEST | 07/16/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 08/25/2025 | 08/26/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/25/2025 | 08/26/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/23/2025 | 07/25/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/09/2025 | 06/16/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/09/2025 | 06/10/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/09/2025 | 06/09/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/03/2025 | 06/06/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Per Florida Building Code there shall be a 0.5' drop in the first 10' of the house. There are two eleavtions of 28.80' that does not depict what is required. | |||
| ENGIN1 | COMPLETE | 06/03/2025 | 06/04/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/03/2025 | 06/03/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/28/2025 | 05/28/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/28/2025 | 05/29/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/28/2025 | 05/30/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Drainage was also changed after it was approved. Site plan proposes an FFE with 0' tolerance to the upside. The increase in the FFE also creates an need for a berm when common swales are preferred. Please revise. | |||
| ZON | HOLD | 05/20/2025 | 05/20/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Setbacks missing on site plan/survey | |||
| SW1 | COMPLETE | 05/20/2025 | 05/20/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/20/2025 | 05/27/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/20/2025 | 05/20/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/09/2025 | 05/16/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/09/2025 | 05/16/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Truss layout from manufacturer missing. | |||
| CUSVC | COMPLETE | 05/09/2025 | 05/15/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/09/2025 | 05/12/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/09/2025 | 05/09/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/09/2025 | 05/13/2025 |
| LOCATE | COMPLETE | 05/09/2025 | 05/13/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/09/2025 | 05/14/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/09/2025 | 05/14/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) THE DRINAGE PATTERN ON THE RIGHT SIDE OF THE HOUSE NEED TO HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN. 2) THE GRADING PLAN HAS PROPOSED ELEVATIONS OF 0.00 PLEASE INCLUDE PROPOSED ELEVATIONS IN THOSE ELEVATION BOXES. | |||
| ZON | HOLD | 05/09/2025 | 05/13/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Setbacks missing on site plan Window facing right of way must have banding (left side) I changed this one and stamped it but Please note and correct color sheets on future permits. Agreeable Grey LRV is 60 and Urban Bronze is 8 | |||
| SWALE | COMPLETE | 05/09/2025 | 06/03/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/12/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/12/2025 |
| RSI REINSPECTION 1 | ¤35.00 | 12/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/12/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/16/2025 |
| SW ENG PRE APRON | ¤30.00 | 06/16/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/16/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/16/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 06/16/2025 |
| SEWER CREDIT | (¤1,342.00) | 06/16/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 06/16/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 06/16/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 06/16/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 06/16/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 06/16/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 06/16/2025 |
| SITE PLAN 30 | ¤30.00 | 06/16/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 06/16/2025 |
| SURCHARGE FS 533.721 | ¤11.83 | 06/16/2025 |
| SURCHARGE - FS 468.631 | ¤17.75 | 06/16/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/16/2025 |
| WATER- TURN ON | ¤50.00 | 06/16/2025 |
| ADJUSTMENT 10% | (¤131.49) | 06/16/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/16/2025 |
| INSPECTION - RESIDENTIAL | ¤1,001.00 | 06/16/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤283.92 | 06/16/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 06/16/2025 |
| IMPACT FEE FIRE | ¤434.51 | 06/16/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/16/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/16/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 06/16/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/16/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 06/16/2025 |
| PEP TANK INSTALL | ¤756.74 | 06/16/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤25,433.96 |