I want to search for...

Permit #2025050515

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00320-0090
CONDITIONED SPACE: 2332 sqft
GARAGE: 508 sqft
OPENED PORCH (WITH ROOF) : 259 sqft
Total Square Footage: 3099 sqft
Block: 00320
Subdivision: -
Job Phone: 352-433-8382
Location Address: 9 UNDERMOUNT PATH W
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/02/2025
NOC: RECORDED
Applicant name: ALFREDO E SCHEER
Owner: ESTELA SPECS 1 LLC

Address

2601 SOUTH BAYSHORE DRIVE

MIAMI, FL 33133

Lot: 0090
Contracted Stated Job Value: ¤175,000.00
Job Description: Single Family Residence
Type: CN

Contractor

ESTELA LIVING LLC
Status Location Address State License Number Phone
ACTIVE

237 S. DIXIE HWY, 4TH FLOOR

CORAL GABLES, FL 33133

CGC1534535 (Exp: 08/31/2026) 352-433-8382

Sub Contractors

JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 12/23/2025 APPROVED FSLADISH
Note: 12/23/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ______________________________________________________________________________________________________________________________ 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 PLEASE READ INSPECTORS NOTE. YOU ARE REQUIRED TO LAY SOD TO GRADE IN THE COPC ROW ON THE RIGHT SIDE PRPERTY LINE. YOU ARE REQUIRED TO REPAIR AND CUT OUT ANY ROOTS, RAKE OUT AND LAY SOD TO MATCH GRADE ON BARE AREA WHERE DISTURBED ON LEFT SIDE PROPERTY LINE. PLEASE SEE PHOTO FOR REFERENCE. Inspector Notes from Inspection 9465 12/19/25 I am approving this inspection as a courtesy so you may move forward with inspections but you have corrections to make before Row Final Passage. *** INSPECTORS NOTE. BUILDER WILL BE REQUIRED TO REMOVE ALL ROOTS, RAKE HIGH SPOTS AND SOD TO GRADE AREA DISTURBED/BARE AREAS ON LEFT SIDE PROPERTY LINE. BUILDER WILL BE REQUIRED TO REPAIR, SLOPE, COMPACT AND LAY SOD TO GRADE ON THE RIGHT SIDE PAST THE PROPERTY LINE ON COPC ROW THAT HAS BEEN DISTURBED. PHOTO FOR REFERENCE.***
U -UTILITY RESIDENTIAL FINAL 12/22/2025 FINAL APPROVED BHAINES
Note: Inspector Notes from Inspection 9035 No CC, No IRR.
ROW - STORMWATER FINAL 12/22/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 12/22/25 PLEASE READ INSPECTORS NOTE. YOU ARE REQUIRED TO LAY SOD TO GRADE IN THE COPC ROW ON THE RIGHT SIDE PRPERTY LINE. YOU ARE REQUIRED TO REPAIR AND CUT OUT ANY ROOTS, RAKE OUT AND LAY SOD TO MATCH GRADE ON BARE AREA WHERE DISTURBED ON LEFT SIDE PROPERTY LINE. PLEASE SEE PHOTO FOR REFERENCE. Inspector Notes from Inspection 9465 12/19/25 I am approving this inspection as a courtesy so you may move forward with inspections but you have corrections to make before Row Final Passage. *** INSPECTORS NOTE. BUILDER WILL BE REQUIRED TO REMOVE ALL ROOTS, RAKE HIGH SPOTS AND SOD TO GRADE AREA DISTURBED/BARE AREAS ON LEFT SIDE PROPERTY LINE. BUILDER WILL BE REQUIRED TO REPAIR, SLOPE, COMPACT AND LAY SOD TO GRADE ON THE RIGHT SIDE PAST THE PROPERTY LINE ON COPC ROW THAT HAS BEEN DISTURBED. PHOTO FOR REFERENCE.***
ROW - FINAL APRON (AFTER POUR) 12/22/2025 APPROVED FSLADISH
Note: 12/22/25 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _______________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 12/19/25 I am approving this inspection as a courtesy so you may move forward with inspections but you have corrections to make before Row Final Passage. *** INSPECTORS NOTE. BUILDER WILL BE REQUIRED TO REMOVE ALL ROOTS, RAKE HIGH SPOTS AND SOD TO GRADE AREA DISTURBED/BARE AREAS ON LEFT SIDE PROPERTY LINE. BUILDER WILL BE REQUIRED TO REPAIR, SLOPE, COMPACT AND LAY SOD TO GRADE ON THE RIGHT SIDE PAST THE PROPERTY LINE ON COPC ROW THAT HAS BEEN DISTURBED. PHOTO FOR REFERENCE.***
ROW FIELD SURVEY /GRADING CERTIFICATION 12/19/2025 APPROVED - AS NOTED FSLADISH
Note: 12/19/25 I am approving this inspection as a courtesy so you may move forward with inspections but you have corrections to make before Row Final Passage. *** INSPECTORS NOTE. BUILDER WILL BE REQUIRED TO REMOVE ALL ROOTS, RAKE HIGH SPOTS AND SOD TO GRADE AREA DISTURBED/BARE AREAS ON LEFT SIDE PROPERTY LINE. BUILDER WILL BE REQUIRED TO REPAIR, SLOPE, COMPACT AND LAY SOD TO GRADE ON THE RIGHT SIDE PAST THE PROPERTY LINE ON COPC ROW THAT HAS BEEN DISTURBED. PHOTO FOR REFERENCE.***
BLD - BUILDING FINAL 12/19/2025 FINAL APPROVED BTAYLOR
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/18/2025 APPROVED FSLADISH
Note: 12/12/2025 - PREVIOUS INSPECTION NOTES 12/12/25 BUILDER HAS WRONG ADDRESS POSTED ON HOUSE. THERE IS NO LGDC ON PERMIT AND THE SOD IS NOT FULLY LAID AT THE TIME OF THIS INSPECTION TO EVEN COMPLETE INSPECTION. YOU ARE REQUIRED TO UPLOAD A LOT GRADING AND DRAINAGE CHECLIST FOR REVIEW AND APPROVAL BEFORE ANY INSPECTIONS CAN BE COMPLETED. New document type: Final Lot Grading & Drainage Certification • Begins 7/1/25 – all 1 and 2 family dwelling permits submitted on or after 7/1/25 • Actual Lot Grading & Drainage Certification IS NOT submitted at time of permit application • Lot Grading & Drainage Certification submitted near completion of the home after installation of landscaping / sod and REPLACES the Final Survey • Same review process as current • Lot Grading & Drainage Certification must be on City Form – if not on City form permit revision / submittal will be rejected. • Lot Grading & Drainage Certification signed and sealed (digitally) by a Florida licensed Professional Engineer – no exceptions • If not by a PE – Lot Grading & Drainage Certification will be rejected PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 11/19/25 BUILDER TO MAINTAIN COPC RESIDENTIAL DRIVEWAY AND EROSION CONTROL STANDARDS THROUGHOUT CONSTRUCTION PROCESS. WILL CONTINUE TO MONITOR SITE FOR COMPLIANCE THROUGHOUT THE CONTRUCTION PROCESS. ________________________________________________________________________________________________________________________ 11/14/2025 - PREVIOUS INSPECTION NOTES 10/27/2025 - PREVIOUS INSPECTION NOTES 10/27/25 YOU ARE REQUIRED TO HAVE SILT FENCE ACROSS THE FRONT. YOU ARE REQUIRED TO EITHER KEEP THE SWALE OPEN TO POSITIVE FLOW OR INSTALL A TEMPORARY PIPE MINIMUM OF 12" IN DIAMETER CONSTRUCTION ENTRANCE. YOU HAVE THE FRONT WASHING INTO THE SWALE AND OBSTRUCTING DRAINAGE FLOW AND ON THE RIGHT FRONT SWALE PROPERTY LINE AREA LARGE RUTS AND WASHED IN SWALE SLOPE. PHOTO FOR REFERENCE. YOU WILL HAVE A REINSPECTION FOR COMPLIANCE ON 11/3/25.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/12/2025 Disapproved - NO FEE FSLADISH
Note: 12/12/25 BUILDER HAS WRONG ADDRESS POSTED ON HOUSE. THERE IS NO LGDC ON PERMIT AND THE SOD IS NOT FULLY LAID AT THE TIME OF THIS INSPECTION TO EVEN COMPLETE INSPECTION. YOU ARE REQUIRED TO UPLOAD A LOT GRADING AND DRAINAGE CHECLIST FOR REVIEW AND APPROVAL BEFORE ANY INSPECTIONS CAN BE COMPLETED. New document type: Final Lot Grading & Drainage Certification • Begins 7/1/25 – all 1 and 2 family dwelling permits submitted on or after 7/1/25 • Actual Lot Grading & Drainage Certification IS NOT submitted at time of permit application • Lot Grading & Drainage Certification submitted near completion of the home after installation of landscaping / sod and REPLACES the Final Survey • Same review process as current • Lot Grading & Drainage Certification must be on City Form – if not on City form permit revision / submittal will be rejected. • Lot Grading & Drainage Certification signed and sealed (digitally) by a Florida licensed Professional Engineer – no exceptions • If not by a PE – Lot Grading & Drainage Certification will be rejected PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 11/19/25 BUILDER TO MAINTAIN COPC RESIDENTIAL DRIVEWAY AND EROSION CONTROL STANDARDS THROUGHOUT CONSTRUCTION PROCESS. WILL CONTINUE TO MONITOR SITE FOR COMPLIANCE THROUGHOUT THE CONTRUCTION PROCESS. ________________________________________________________________________________________________________________________ 11/14/2025 - PREVIOUS INSPECTION NOTES 10/27/2025 - PREVIOUS INSPECTION NOTES 10/27/25 YOU ARE REQUIRED TO HAVE SILT FENCE ACROSS THE FRONT. YOU ARE REQUIRED TO EITHER KEEP THE SWALE OPEN TO POSITIVE FLOW OR INSTALL A TEMPORARY PIPE MINIMUM OF 12" IN DIAMETER CONSTRUCTION ENTRANCE. YOU HAVE THE FRONT WASHING INTO THE SWALE AND OBSTRUCTING DRAINAGE FLOW AND ON THE RIGHT FRONT SWALE PROPERTY LINE AREA LARGE RUTS AND WASHED IN SWALE SLOPE. PHOTO FOR REFERENCE. YOU WILL HAVE A REINSPECTION FOR COMPLIANCE ON 11/3/25.
U-CROSS CONNECTION 12/11/2025 APPROVED - AS NOTED BHAINES
Note: No CC, No IRR.
ROW - DRAINAGE 11/19/2025 APPROVED - AS NOTED FSLADISH
Note: 11/19/25 BUILDER TO MAINTAIN COPC RESIDENTIAL DRIVEWAY AND EROSION CONTROL STANDARDS THROUGHOUT CONSTRUCTION PROCESS. WILL CONTINUE TO MONITOR SITE FOR COMPLIANCE THROUGHOUT THE CONTRUCTION PROCESS. ________________________________________________________________________________________________________________________ 11/14/2025 - PREVIOUS INSPECTION NOTES 10/27/2025 - PREVIOUS INSPECTION NOTES 10/27/25 YOU ARE REQUIRED TO HAVE SILT FENCE ACROSS THE FRONT. YOU ARE REQUIRED TO EITHER KEEP THE SWALE OPEN TO POSITIVE FLOW OR INSTALL A TEMPORARY PIPE MINIMUM OF 12" IN DIAMETER CONSTRUCTION ENTRANCE. YOU HAVE THE FRONT WASHING INTO THE SWALE AND OBSTRUCTING DRAINAGE FLOW AND ON THE RIGHT FRONT SWALE PROPERTY LINE AREA LARGE RUTS AND WASHED IN SWALE SLOPE. PHOTO FOR REFERENCE. YOU WILL HAVE A REINSPECTION FOR COMPLIANCE ON 11/3/25.
ROW - DRAINAGE 11/14/2025 PARTIALLY APPROVED FSLADISH
Note: 10/27/2025 - PREVIOUS INSPECTION NOTES 10/27/25 YOU ARE REQUIRED TO HAVE SILT FENCE ACROSS THE FRONT. YOU ARE REQUIRED TO EITHER KEEP THE SWALE OPEN TO POSITIVE FLOW OR INSTALL A TEMPORARY PIPE MINIMUM OF 12" IN DIAMETER CONSTRUCTION ENTRANCE. YOU HAVE THE FRONT WASHING INTO THE SWALE AND OBSTRUCTING DRAINAGE FLOW AND ON THE RIGHT FRONT SWALE PROPERTY LINE AREA LARGE RUTS AND WASHED IN SWALE SLOPE. PHOTO FOR REFERENCE. YOU WILL HAVE A REINSPECTION FOR COMPLIANCE ON 11/3/25.
ROW- PRE-APRON (PRE-POUR) 11/14/2025 APPROVED FSLADISH
Note: 11/14/25 BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25 RECEIVED TEXT MESSAGE FROM DOUG CM TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY.
ELECTRIC - EARLY POWER 11/14/2025 APPROVED CVANSTRAHLEN
Note: 11/13/2025 - PREVIOUS INSPECTION NOTES 11-13-25 1. House is not ready.
ELECTRIC - EARLY POWER 11/13/2025 Disapproved - NO FEE BTAYLOR
Note: 11-13-25 1. House is not ready.
ROW- PRE-APRON (PRE-POUR) 11/13/2025 CANCELLED BY APPLICANT FSLADISH
Note: 11/13/25 RECEIVED TEXT MESSAGE FROM DOUG CM TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY.
GRAVITY SEWER TEST 11/10/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 11/10/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION, TAP WAS BLOCKED BY POWER POLE FOR THE LOTSERVICING THIS ADDRESS THIS WAS A VIRTUAL INSPECTION
ROW - DRAINAGE 10/27/2025 Disapproved - NO FEE FSLADISH
Note: 10/27/25 YOU ARE REQUIRED TO HAVE SILT FENCE ACROSS THE FRONT. YOU ARE REQUIRED TO EITHER KEEP THE SWALE OPEN TO POSITIVE FLOW OR INSTALL A TEMPORARY PIPE MINIMUM OF 12" IN DIAMETER CONSTRUCTION ENTRANCE. YOU HAVE THE FRONT WASHING INTO THE SWALE AND OBSTRUCTING DRAINAGE FLOW AND ON THE RIGHT FRONT SWALE PROPERTY LINE AREA LARGE RUTS AND WASHED IN SWALE SLOPE. PHOTO FOR REFERENCE. YOU WILL HAVE A REINSPECTION FOR COMPLIANCE ON 11/3/25.
INSULATION 10/10/2025 APPROVED BTAYLOR
Note: 10/8/2025 - PREVIOUS INSPECTION NOTES 10-8-25 1. Still no 5' head pressure. 2. Master bathroom window not foamed in. Inspector Notes from Inspection 2420 Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( top of front door, need solid shims , window in share bedroom . mark with red sharpie market #3- Please install the permit box in a accesible area
INSULATION 10/08/2025 Disapproved - NO FEE BTAYLOR
Note: 10-8-25 1. Still no 5' head pressure. 2. Master bathroom window not foamed in. Inspector Notes from Inspection 2420 Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( top of front door, need solid shims , window in share bedroom . mark with red sharpie market #3- Please install the permit box in a accesible area
LATH/BRICK/ WATER BARRIER 10/01/2025 APPROVED CVANSTRAHLEN
ALL ROUGH 10/01/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( top of front door, need solid shims , window in share bedroom . mark with red sharpie market #3- Please install the permit box in a accesible area
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/30/2025 APPROVED CVANSTRAHLEN
Note:
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/29/2025 Disapproved - NO FEE BTAYLOR
Note: 9-29-25 1. Need readable set of plans in the box. 9/10/2025 - PREVIOUS INSPECTION NOTES 9/10/25 1. Truss' T12 & T14 missing engineering (highlighted) 2. Need proper repair on gusset plate for truss T10 (garage side) 3. All interior load bearing walls not per detail 4. Left side load bearing wall overhangs pad 5. Missing 2nd attic access in hallway per plan 6. Small load bearing wall calls for 2x6 framing and its 2x4 7. Truss' need to be cleaned 8. No detail for interior load bearing header --Roof sheathing is okay--
WALL SHEATHING 09/24/2025 APPROVED MCONTRYMAN
ROOF VALLEY & METAL 09/12/2025 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/10/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 9/10/25 1. Truss' T12 & T14 missing engineering (highlighted) 2. Need proper repair on gusset plate for truss T10 (garage side) 3. All interior load bearing walls not per detail 4. Left side load bearing wall overhangs pad 5. Missing 2nd attic access in hallway per plan 6. Small load bearing wall calls for 2x6 framing and its 2x4 7. Truss' need to be cleaned 8. No detail for interior load bearing header --Roof sheathing is okay--
TIE BEAM / LINTEL 08/28/2025 APPROVED MCONTRYMAN
MONOLITHIC SLAB 08/19/2025 APPROVED MCONTRYMAN
Note: 8/19/25 Noting that trusses are on site 8/15/2025 - PREVIOUS INSPECTION NOTES 8-15-25 1. All rebar uprights are installed wrong. Uprights should be perpendicular to footing rebar not parallel. 8/14/2025 - PREVIOUS INSPECTION NOTES 8-14-25 1. Missing #4 rebar in shower pans. 2. All rebar uprights are installed wrong. Uprights should be perpendicular to footing rebar not parallel.
MONOLITHIC SLAB 08/15/2025 Disapproved - NO FEE BTAYLOR
Note: 8-15-25 1. All rebar uprights are installed wrong. Uprights should be perpendicular to footing rebar not parallel. 8/14/2025 - PREVIOUS INSPECTION NOTES 8-14-25 1. Missing #4 rebar in shower pans. 2. All rebar uprights are installed wrong. Uprights should be perpendicular to footing rebar not parallel.
MONOLITHIC SLAB 08/14/2025 Disapproved - NO FEE BTAYLOR
Note: 8-14-25 1. Missing #4 rebar in shower pans. 2. All rebar uprights are installed wrong. Uprights should be perpendicular to footing rebar not parallel.
PLUMBING 1ST ROUGH UNDERGROUND 08/12/2025 APPROVED MGIBSON
Note: 8/5/2025 - PREVIOUS INSPECTION NOTES p-2503.5 head test 5 ' not holding
PLUMBING 1ST ROUGH UNDERGROUND 08/05/2025 Disapproved -FEE REQUIRED MGIBSON
Note: p-2503.5 head test 5 ' not holding
FORMBOARD SURVEY (OFFICE USE ONLY) 08/05/2025 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 08/04/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 07/11/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 09/23/2025 09/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 09/15/2025 09/22/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 08/06/2025 08/08/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/04/2025 08/05/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 08/04/2025 08/04/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 07/31/2025 08/04/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 07/25/2025 07/28/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Your contractor certificate is not active. Unable to result the geotech inspection. When corrected, put in a revision form so we can complete the inspection
BLD COMPLETE 07/23/2025 07/25/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/29/2025 06/02/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/29/2025 05/30/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 05/29/2025 05/29/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
ZON COMPLETE 05/27/2025 05/27/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 05/27/2025 05/29/2025
Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM The draiange swale shall have a minimum of 0.2' fall going to the swale on right side. There is flat spots going all the way to the front of the house, there shall be positive to the proposed swale to ensure the majority of the stormwater is contained to the swale and not the yard.
BLD COMPLETE 05/27/2025 05/28/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/27/2025 05/28/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SWALE COMPLETE 05/13/2025 06/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 05/12/2025 05/19/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 05/12/2025 05/19/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Missing truss layout from truss manufacturer
CUSVC COMPLETE 05/12/2025 05/15/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 05/12/2025 05/19/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/12/2025 05/13/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 05/12/2025 05/14/2025
LOCATE COMPLETE 05/12/2025 05/14/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 05/12/2025 05/14/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 05/12/2025 05/16/2025
Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM - In the front there shall be a minimum fall of 6" in first 10' of the house. - There is a flat spot in the back of the yard. Per technical manual there shall be a minimum of 0.5% (0.1') every 10' feet. - Removing too much dirt on front property line. Front property line can be higher the edge of pavement just not lower by more than a .1'
ZON HOLD 05/12/2025 05/14/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Color sheet Provide the correct LRV for those colors as the numbers provided do not match Sherwin Williams samples Elevation Plan: Does not match other plans provide the correct model Floor plan: Does not match the site plan and the landscape plan. Provide the correct model all plans must match

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 12/23/2025
RSI REINSPECTION 1 ¤35.00 12/23/2025
RSI REINSPECTION 1 ¤35.00 12/23/2025
RSI REINSPECTION 1 ¤35.00 12/23/2025
REINSPECTION RESIDENTIAL ¤40.00 12/23/2025
REINSPECTION RESIDENTIAL ¤40.00 12/23/2025
FC IMPACT FEE EMS ¤62.00 06/02/2025
IMPACT FEE FIRE ¤434.51 06/02/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/02/2025
FC IMPACT FEE LIBRARY ¤268.00 06/02/2025
IMPACT FEE PARKS ¤1,828.01 06/02/2025
IMPACT FEE SCHOOL ¤5,450.00 06/02/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 06/02/2025
WATER- TURN ON ¤50.00 06/02/2025
ADJUSTMENT 10% (¤158.67) 06/02/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/02/2025
INSPECTION - RESIDENTIAL ¤1,212.75 06/02/2025
PLAN REVIEW - RESIDENTIAL ¤343.98 06/02/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 06/02/2025
SURCHARGE FS 533.721 ¤14.28 06/02/2025
SURCHARGE - FS 468.631 ¤21.42 06/02/2025
SW ENG - FOUNDATION SURVEY ¤20.00 06/02/2025
SW ENG INSPECTION 80 ¤80.00 06/02/2025
SW ENG PRE APRON ¤30.00 06/02/2025
SW ENG - REVIEW 20 ¤20.00 06/02/2025
SW ENG RES REVIEW 200 ¤200.00 06/02/2025
WATER METER W/ TAP ¤2,326.93 06/02/2025
SEWER CREDIT (¤850.00) 06/02/2025
WASTEWATER PERM INSPECTION ¤80.00 06/02/2025
WASTEWATER PERM REVIEW ¤25.00 06/02/2025
SEWER CAPITAL FACILITY ¤4,415.00 06/02/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 06/02/2025
WATER PERMIT REVIEW ¤25.00 06/02/2025
WATER MAIN EXTENSION IMPACT ¤917.27 06/02/2025
SITE PLAN 30 ¤30.00 06/02/2025
Fees Total Due: ¤0.00 Total Paid: ¤25,404.97