I want to search for...
Permit #2025050524
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-1040-00000-0550 |
| Block: 00000 |
| Subdivision: 2078 - CANTERBURY ESTATES |
| Job Phone: 786-512-4421 |
| Location Address: 11 LEWISDALE LN |
| Type: DR - DRIVEWAY |
| Issue Date: 06/03/2025 |
| NOC: RECORDED |
| Applicant name: ABEL MENENDEZ |
| Owner: SALMAN STEVEN & BUSHRA MAHMOUD H&W |
|
Address 11 LEWISDALE LANE PALM COAST, FL 32137 |
| Lot: 0550 |
| Contracted Stated Job Value: ¤12,800.00 |
| Job Description: PAVER DRIVEWAY |
| Type: CN |
Contractor
ROYAL TILE & PAVERS INC
| Status | Location Address | Phone |
| ACTIVE |
69 FLEETWOOD DR PALM COAST, FL 32137 |
786-512-4421 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 08/28/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL INSPECTION | 08/28/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 08/28/2025 | FINAL APPROVED | BWRIGHT |
| ROW- PRE-APRON (PRE-POUR) | 06/16/2025 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS ----------------------------------------------------------------------- 6/10/2025 - PREVIOUS INSPECTION NOTES PASSING AS NOTED THAT I TALK TO THE CONTRACTOR AND HE IS GOING TO EXTEND THE POURING OF THE SIDEWALK TO THE NEXT SECTION OF SIDEWALK BECAUSE WHEN PULLING CONCRETE IT CRAKED THE SECTION. READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. | |||
| ROW- PAVER RESTRAINTS | 06/10/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/10/2025 | PARTIALLY APPROVED | PFLANAGAN |
| Note: PASSING AS NOTED THAT I TALK TO THE CONTRACTOR AND HE IS GOING TO EXTEND THE POURING OF THE SIDEWALK TO THE NEXT SECTION OF SIDEWALK BECAUSE WHEN PULLING CONCRETE IT CRAKED THE SECTION. READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. |
Review History
| Department | Status | Date In | Date Out |
| ZON | HOLD | 05/20/2025 | 05/20/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in original right of way agreement | |||
| ENGIN1 | COMPLETE | 05/20/2025 | 05/20/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 05/20/2025 | 05/20/2025 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/20/2025 | 05/20/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/13/2025 | 05/13/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 05/13/2025 | 05/13/2025 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/13/2025 | 05/14/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway cannot go all the way up to the front entry. There has to be a separation for their foundation plantings Please turn in original right of way agreement |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤3.00) | 06/03/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/03/2025 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 06/03/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 06/03/2025 |
| SW ENG PRE APRON | ¤30.00 | 06/03/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/03/2025 |
| SITE PLAN 15 | ¤15.00 | 06/03/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤356.00 |