Permit #2025050526

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7028-00310-0150
OPENED PORCH (WITH ROOF) : 400 sqft
Total Square Footage: 400 sqft
Block: 00310
Subdivision: 7028 -
Job Phone: 386-898-3419
Location Address: 49 POINT PLEASANT DR
Type: PA - PATIO/SLAB (STRUCTURAL)
Issue Date: 05/19/2025
NOC: Unknown
Applicant name: PAULO JM DOS SANTOS
Owner: PINKHASOVA ISABELLA

Address

49 POINT PLEASANT DRIVE

PALM COAST, FL 32164

Lot: 0150
Contracted Stated Job Value: ¤2,400.00
Job Description: Add new 40'x10' structural slab back of pool deck.
Type: CN

Contractor

C & P CONCRETE INC
Status Location Address Phone Fax
ACTIVE

1 WESTROCK LANE

PALM COAST, FL 32164

386-898-3419 386-446-9206

Inspection History

Type Request Date Result Inspector
FINAL - BUILDING MISC 07/31/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 7/31/2025 1:59:50 PM ***
ROW - FINAL INSPECTION 07/30/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. Inspector Notes from Inspection 9463 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/22/2025 - PREVIOUS INSPECTION NOTES 07/22/25 TPOLACEK*** FINAL SURVEY INDICATES DRAINAGE WILL NOT FLOW AWAY FROM PATIO AS REQUIRED. PLEASE SEE ATTACHED PHOTO AND MAKE REQUIRED CORRECTIONS TO GRADE TO ALLOW DRAINAGE TO MOVE AWAY FROM STRUCTURE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/24/2025 APPROVED - AS NOTED TPOLACEK
Note: 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/22/2025 - PREVIOUS INSPECTION NOTES 07/22/25 TPOLACEK*** FINAL SURVEY INDICATES DRAINAGE WILL NOT FLOW AWAY FROM PATIO AS REQUIRED. PLEASE SEE ATTACHED PHOTO AND MAKE REQUIRED CORRECTIONS TO GRADE TO ALLOW DRAINAGE TO MOVE AWAY FROM STRUCTURE.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/24/2025 APPROVED - AS NOTED TPOLACEK
Note: 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. Inspector Notes from Inspection 9463 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/22/2025 - PREVIOUS INSPECTION NOTES 07/22/25 TPOLACEK*** FINAL SURVEY INDICATES DRAINAGE WILL NOT FLOW AWAY FROM PATIO AS REQUIRED. PLEASE SEE ATTACHED PHOTO AND MAKE REQUIRED CORRECTIONS TO GRADE TO ALLOW DRAINAGE TO MOVE AWAY FROM STRUCTURE.
ROW- PROJECT STATUS 07/24/2025 Status Check TPOLACEK
Note: 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/22/2025 Disapproved - NO FEE TPOLACEK
Note: 07/22/25 TPOLACEK*** FINAL SURVEY INDICATES DRAINAGE WILL NOT FLOW AWAY FROM PATIO AS REQUIRED. PLEASE SEE ATTACHED PHOTO AND MAKE REQUIRED CORRECTIONS TO GRADE TO ALLOW DRAINAGE TO MOVE AWAY FROM STRUCTURE.
MONOLITHIC SLAB 06/05/2025 APPROVED MCONTRYMAN
Note: 6/4/2025 - PREVIOUS INSPECTION NOTES 6/4/25: 1). No permit box, permit or plans on site for project/inspection. FBC [A]107.3.1 2). Rebar at 32" OC into existing slab is not installed as required. FBC [A]107.4 NOTE: New landing pad for existing screen door on left side does not show on site plan or plans at all. FBC 107.2.1
MONOLITHIC SLAB 06/04/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/4/2025 9:04:21 AM *** 6/4/25: 1). No permit box, permit or plans on site for project/inspection. FBC [A]107.3.1 2). Rebar at 32" OC into existing slab is not installed as required. FBC [A]107.4 NOTE: New landing pad for existing screen door on left side does not show on site plan or plans at all. FBC 107.2.1

Review History

Department Status Date In Date Out
BFLOOD CANCEL 05/13/2025 05/19/2025
BLD COMPLETE 05/13/2025 05/19/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 05/13/2025 05/13/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 05/13/2025 05/13/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 07/29/2025
SURCHARGE FS 533.721 ¤2.00 05/19/2025
SURCHARGE - FS 468.631 ¤2.00 05/19/2025
SW ENG - INSPECTION 20 ¤20.00 05/19/2025
SW ENG - REVIEW 20 ¤20.00 05/19/2025
SITE PLAN 15 ¤15.00 05/19/2025
ADJUSTMENT 10% (¤13.40) 05/19/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/19/2025
INSPECTION - RESIDENTIAL ¤71.50 05/19/2025
PLAN REVIEW - MISC 32.50 ¤32.50 05/19/2025
Fees Total Due: ¤0.00 Total Paid: ¤219.60