I want to search for...
Permit #2025050526
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7028-00310-0150 |
| OPENED PORCH (WITH ROOF) : 400 sqft |
| Total Square Footage: 400 sqft |
| Block: 00310 |
| Subdivision: 7028 - |
| Job Phone: 386-898-3419 |
| Location Address: 49 POINT PLEASANT DR |
| Type: PA - PATIO/SLAB (STRUCTURAL) |
| Issue Date: 05/19/2025 |
| NOC: Unknown |
| Applicant name: PAULO JM DOS SANTOS |
| Owner: PINKHASOVA ISABELLA |
|
Address 49 POINT PLEASANT DRIVE PALM COAST, FL 32164 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤2,400.00 |
| Job Description: Add new 40'x10' structural slab back of pool deck. |
| Type: CN |
Contractor
C & P CONCRETE INC
| Status | Location Address | Phone | Fax |
| ACTIVE |
1 WESTROCK LANE PALM COAST, FL 32164 |
386-898-3419 | 386-446-9206 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL - BUILDING MISC | 07/31/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 7/31/2025 1:59:50 PM *** | |||
| ROW - FINAL INSPECTION | 07/30/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. Inspector Notes from Inspection 9463 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/22/2025 - PREVIOUS INSPECTION NOTES 07/22/25 TPOLACEK*** FINAL SURVEY INDICATES DRAINAGE WILL NOT FLOW AWAY FROM PATIO AS REQUIRED. PLEASE SEE ATTACHED PHOTO AND MAKE REQUIRED CORRECTIONS TO GRADE TO ALLOW DRAINAGE TO MOVE AWAY FROM STRUCTURE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/24/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/22/2025 - PREVIOUS INSPECTION NOTES 07/22/25 TPOLACEK*** FINAL SURVEY INDICATES DRAINAGE WILL NOT FLOW AWAY FROM PATIO AS REQUIRED. PLEASE SEE ATTACHED PHOTO AND MAKE REQUIRED CORRECTIONS TO GRADE TO ALLOW DRAINAGE TO MOVE AWAY FROM STRUCTURE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/24/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. Inspector Notes from Inspection 9463 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/22/2025 - PREVIOUS INSPECTION NOTES 07/22/25 TPOLACEK*** FINAL SURVEY INDICATES DRAINAGE WILL NOT FLOW AWAY FROM PATIO AS REQUIRED. PLEASE SEE ATTACHED PHOTO AND MAKE REQUIRED CORRECTIONS TO GRADE TO ALLOW DRAINAGE TO MOVE AWAY FROM STRUCTURE. | |||
| ROW- PROJECT STATUS | 07/24/2025 | Status Check | TPOLACEK |
| Note: 07/24/25 TPOLACEK*** MET CM ON SITE AND PATIO IS ACTUALL PITCHED TO THE SIDES BY 2% TO ACHIEVE PROPER DRAINAGE. CM WILL INSTALL A DRAIN BOX ON RIGHT SIDE AND PIPE OUT TOWARDS THE FRONT TO HELP MOVE THE DRAINAGE AWAY FROM PATIO. ON THE LEFT SIDE BY STOOP AND WHERE PATIO MEETE POOL DECK THEY WILL CREATE A SMALL SWALE TO ALLOW DRAINAGE TO MOVE OUT TO SWALE. ALTHOUGH FINAL SURVEY DOES INDICATE IT SITE CONDITIONS MEET THE MINIMUM STANDARDS. I WILL APPROVE THE FINAL SURVEY WITH THESE NOTES AND CHECK ALL CONDITIONS WHEN FINAL ROW IS REQUESTED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/22/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 07/22/25 TPOLACEK*** FINAL SURVEY INDICATES DRAINAGE WILL NOT FLOW AWAY FROM PATIO AS REQUIRED. PLEASE SEE ATTACHED PHOTO AND MAKE REQUIRED CORRECTIONS TO GRADE TO ALLOW DRAINAGE TO MOVE AWAY FROM STRUCTURE. | |||
| MONOLITHIC SLAB | 06/05/2025 | APPROVED | MCONTRYMAN |
| Note: 6/4/2025 - PREVIOUS INSPECTION NOTES 6/4/25: 1). No permit box, permit or plans on site for project/inspection. FBC [A]107.3.1 2). Rebar at 32" OC into existing slab is not installed as required. FBC [A]107.4 NOTE: New landing pad for existing screen door on left side does not show on site plan or plans at all. FBC 107.2.1 | |||
| MONOLITHIC SLAB | 06/04/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/4/2025 9:04:21 AM *** 6/4/25: 1). No permit box, permit or plans on site for project/inspection. FBC [A]107.3.1 2). Rebar at 32" OC into existing slab is not installed as required. FBC [A]107.4 NOTE: New landing pad for existing screen door on left side does not show on site plan or plans at all. FBC 107.2.1 |
Review History
| Department | Status | Date In | Date Out |
| BFLOOD | CANCEL | 05/13/2025 | 05/19/2025 |
| BLD | COMPLETE | 05/13/2025 | 05/19/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/13/2025 | 05/13/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/13/2025 | 05/13/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/29/2025 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/19/2025 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/19/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/19/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/19/2025 |
| SITE PLAN 15 | ¤15.00 | 05/19/2025 |
| ADJUSTMENT 10% | (¤13.40) | 05/19/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/19/2025 |
| INSPECTION - RESIDENTIAL | ¤71.50 | 05/19/2025 |
| PLAN REVIEW - MISC 32.50 | ¤32.50 | 05/19/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤219.60 |