Permit #2025050745
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7063-00280-0180 |
| PATIO/DECK (NO ROOF) : 1126 sqft |
| Total Square Footage: 1126 sqft |
| Block: 00280 |
| Subdivision: 7063 - |
| Job Phone: 838-684-6512 X9 |
| Location Address: 30 ZINNIA TRL |
| Type: PO - POOL |
| Issue Date: 05/22/2025 |
| NOC: RECORDED |
| Applicant name: SAMANTHA JESSICA ALEXANDER |
| Owner: PAGANO PAUL PHILIP |
|
Address 30 ZINNIA TRAIL PALM COAST, FL 32164 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤72,000.00 |
| Job Description: swimming pool & screen enclosure |
| Type: CN |
Contractor
AFFORDABLE POOLS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3438 LONGLEAF ROAD , |
CPC1460092 (Exp: 08/31/2026) | 838-684-6512 X9 |
Sub Contractors
MICHAEL ANTHONY NOMAR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
537 JOSIE ST NEW SYMRNA BEACAH, FL 32168 |
ER13016145 (Exp: 08/31/2026) | 386-402-8046 |
TODD MICHAEL ORIE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
560 S. YONGE ST. ORMOND BEACH, FL 32174 |
CBC036417 (Exp: 08/31/2026) | (386)673-4589 | (386)673-8045 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 08/27/2025 | FINAL APPROVED | BTAYLOR |
| U -UTILITY RESIDENTIAL FINAL | 08/26/2025 | FINAL APPROVED | BHAINES |
| ROW - FINAL INSPECTION | 08/25/2025 | APPROVED | FSLADISH |
| Note: 8/25/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/25/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2025 | APPROVED | FSLADISH |
| Note: 8/25/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ELECTRIC AND ALARM | 07/28/2025 | APPROVED | MCONTRYMAN |
| POOL DECK | 07/01/2025 | APPROVED | BTAYLOR |
| ROW - DRAINAGE | 06/25/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 6/25/25 SWALE HAS BEEN OPENED AND AT DIRT GRADE AT THE TIME OF THIS INSPECTION. YOU ARE RESPOSIBLE TO KEEP IT OPEN AND FLOWING THROUGHOUT CONSTRUCTION PROCESS. YOU WILL BE REQUIRED TO SOD TO MATCH EXISTING GRADE BEFRORE ROW FINAL PASSAGE. ________________________________________________________________________________________________________________________ 6/24/2025 - PREVIOUS INSPECTION NOTES 6/24/25 NO CHANGE MADE AT THE TIME OF THIS INSPECTION. PLEASE READ PREVIOUS NOTE FROM PREVIOUS INSPECTOR. NEED TO REMOVE THE TWO 6" PIPES AND REPLACE WITH ONE 12" PIPE. SEE PHOTO FOR REFERENCE. WILL BE BACK ON 6/25/25 FOR COMPLIANCE REINSPECTION. _______________________________________________________________________________________________________________________ 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25 PLEASE READ PREVIOUS NOTE FROM PREVIOUS INSPECTOR. NEED TO REMOVED THE TWO 6" PIPES AND ADD ONE 12" PIPE. 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/2025 - PREVIOUS INSPECTION NOTES INSPECTION BEFORE WAS PASSED BUT SHOULDN'T PLEASE DO THE FOLLOWING 1) NEED TO OPEN SWALE SO WATER CAN FLOW TO OUTFALL. 2) IF YOU HAVE A ENTREANCE YOU NEED TO HAVE 12" CULVERT PIPE MINIMUM SO WATER CAN FLOW PROPERLY. 3) NEED TO SWEEP ALL DIRT SAND AND ROCK FROM ROADWAY. YOU WILL HAVE 7DAYS TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 06/24/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 6/24/25 NO CHANGE MADE AT THE TIME OF THIS INSPECTION. PLEASE READ PREVIOUS NOTE FROM PREVIOUS INSPECTOR. NEED TO REMOVE THE TWO 6" PIPES AND REPLACE WITH ONE 12" PIPE. SEE PHOTO FOR REFERENCE. WILL BE BACK ON 6/25/25 FOR COMPLIANCE REINSPECTION. _______________________________________________________________________________________________________________________ 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25 PLEASE READ PREVIOUS NOTE FROM PREVIOUS INSPECTOR. NEED TO REMOVED THE TWO 6" PIPES AND ADD ONE 12" PIPE. 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/2025 - PREVIOUS INSPECTION NOTES INSPECTION BEFORE WAS PASSED BUT SHOULDN'T PLEASE DO THE FOLLOWING 1) NEED TO OPEN SWALE SO WATER CAN FLOW TO OUTFALL. 2) IF YOU HAVE A ENTREANCE YOU NEED TO HAVE 12" CULVERT PIPE MINIMUM SO WATER CAN FLOW PROPERLY. 3) NEED TO SWEEP ALL DIRT SAND AND ROCK FROM ROADWAY. YOU WILL HAVE 7DAYS TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 06/20/2025 | Disapproved - NO FEE | RRICKS |
| Note: 6/20/25 PLEASE READ PREVIOUS NOTE FROM PREVIOUS INSPECTOR. NEED TO REMOVED THE TWO 6" PIPES AND ADD ONE 12" PIPE. 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/2025 - PREVIOUS INSPECTION NOTES INSPECTION BEFORE WAS PASSED BUT SHOULDN'T PLEASE DO THE FOLLOWING 1) NEED TO OPEN SWALE SO WATER CAN FLOW TO OUTFALL. 2) IF YOU HAVE A ENTREANCE YOU NEED TO HAVE 12" CULVERT PIPE MINIMUM SO WATER CAN FLOW PROPERLY. 3) NEED TO SWEEP ALL DIRT SAND AND ROCK FROM ROADWAY. YOU WILL HAVE 7DAYS TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 06/19/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: 6/12/2025 - PREVIOUS INSPECTION NOTES INSPECTION BEFORE WAS PASSED BUT SHOULDN'T PLEASE DO THE FOLLOWING 1) NEED TO OPEN SWALE SO WATER CAN FLOW TO OUTFALL. 2) IF YOU HAVE A ENTREANCE YOU NEED TO HAVE 12" CULVERT PIPE MINIMUM SO WATER CAN FLOW PROPERLY. 3) NEED TO SWEEP ALL DIRT SAND AND ROCK FROM ROADWAY. YOU WILL HAVE 7DAYS TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 06/12/2025 | APPROVED | PFLANAGAN |
| Note: 1) NEED TO OPEN SWALE SO WATER CAN FLOW TO OUTFALL. 2) IF YOU HAVE A ENTREANCE YOU NEED TO HAVE 12" CULVERT PIPE MINIMUM SO WATER CAN FLOW PROPERLY. 3) NEED TO SWEEP ALL DIRT SAND AND ROCK FROM ROADWAY. YOU WILL HAVE 7DAYS TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 06/12/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: INSPECTION BEFORE WAS PASSED BUT SHOULDN'T PLEASE DO THE FOLLOWING 1) NEED TO OPEN SWALE SO WATER CAN FLOW TO OUTFALL. 2) IF YOU HAVE A ENTREANCE YOU NEED TO HAVE 12" CULVERT PIPE MINIMUM SO WATER CAN FLOW PROPERLY. 3) NEED TO SWEEP ALL DIRT SAND AND ROCK FROM ROADWAY. YOU WILL HAVE 7DAYS TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| STEEL AND GROUND | 06/02/2025 | APPROVED | MCONTRYMAN |
Review History
| Department | Status | Date In | Date Out |
| BFLOOD | CANCEL | 05/18/2025 | 05/21/2025 |
| BLD | COMPLETE | 05/18/2025 | 05/21/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/18/2025 | 05/22/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/18/2025 | 05/21/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/18/2025 | 05/20/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/18/2025 | 05/19/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/26/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/26/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/26/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/26/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/26/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/26/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 05/22/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/22/2025 |
| SITE PLAN 30 | ¤30.00 | 05/22/2025 |
| ADJUSTMENT 10% | (¤25.50) | 05/22/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/22/2025 |
| INSPECTION- POOL | ¤160.00 | 05/22/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 05/22/2025 |
| SURCHARGE FS 533.721 | ¤2.30 | 05/22/2025 |
| SURCHARGE - FS 468.631 | ¤3.44 | 05/22/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤445.24 |