I want to search for...
Permit #2025050792
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00300-0120 |
| Block: 00300 |
| Subdivision: 7010 - |
| Job Phone: 407-719-7500 |
| Location Address: 46 FANSHAWE LN |
| Type: PO - POOL |
| Issue Date: 07/10/2025 |
| NOC: RECORDED |
| Applicant name: MARC R MIHALSKY |
| Owner: JONES DAVID & STACY H&W |
|
Address 46 FANSHAWE LANE PALM COAST, FL 32137 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤53,000.00 |
| Job Description: SWIMMING POOL |
| Type: CN |
Contractor
BLUE HAVEN POOLS & SPAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
348 W SR 434 OVIEDO, FL 32765 |
CPC1458642 (Exp: 08/31/2026) | 407-542-8770 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 2413 Bunnell, FL 32110 |
EC13002161 (Exp: 08/31/2028) | (386) 437-2966 | 386-437-5042 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 01/15/2026 | CANCELLED BY APPLICANT | WEB |
| POOL FINAL | 01/15/2026 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 01/08/2026 | FINAL APPROVED | BHAINES |
| ROW - FINAL INSPECTION | 01/07/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/07/2026 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/07/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ELECTRIC AND ALARM | 10/03/2025 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 09/18/2025 | APPROVED - AS NOTED | EMADISON |
| Note: Inspector Notes from Inspection 9470 ** 09/18/25 CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY 9/18/25= ED, PLEASE POST A STOP WORK ORDER ON THE PROPERTY IF THERE ARE NO CHANGES ON THE SITE. THANK YOU. Per Gbertola _____________________________________________________________________________________________________________________ 9/17/2025 - PREVIOUS INSPECTION NOTES 9/17/2025 - PREVIOUS INSPECTION NOTES ** 09/17/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/18/25 _______________________________________________________________________________________________________________________ 9/16/2025 - PREVIOUS INSPECTION NOTES ** 09/16/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/15/2025 - PREVIOUS INSPECTION NOTES ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 9/18/25= ED, PLEASE POST A STOP WORK ORDER ON THE PROPERTY IF THERE ARE NO CHANGES ON THE SITE. THANK YOU. Per Gbertola 9/17/2025 - PREVIOUS INSPECTION NOTES 9/17/2025 - PREVIOUS INSPECTION NOTES ** 09/17/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/18/25 _______________________________________________________________________________________________________________________ 9/16/2025 - PREVIOUS INSPECTION NOTES ** 09/16/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/15/2025 - PREVIOUS INSPECTION NOTES ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 | |||
| ROW - DRAINAGE | 09/17/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/17/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/18/25 _______________________________________________________________________________________________________________________ 9/16/2025 - PREVIOUS INSPECTION NOTES ** 09/16/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/15/2025 - PREVIOUS INSPECTION NOTES ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 | |||
| ROW - DRAINAGE | 09/17/2025 | Disapproved - NO FEE | EMADISON |
| Note: 9/17/2025 - PREVIOUS INSPECTION NOTES ** 09/17/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/18/25 _______________________________________________________________________________________________________________________ 9/16/2025 - PREVIOUS INSPECTION NOTES ** 09/16/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/15/2025 - PREVIOUS INSPECTION NOTES ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 | |||
| ROW - DRAINAGE | 09/16/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/16/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/15/2025 - PREVIOUS INSPECTION NOTES ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 | |||
| ROW - DRAINAGE | 09/15/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 | |||
| ROW - DRAINAGE | 09/12/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 | |||
| ROW - DRAINAGE | 09/11/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/12/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 | |||
| ROW - DRAINAGE | 09/04/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 | |||
| POOL DECK | 08/29/2025 | Approval - Private Provider | PPROVIDER |
| STEEL AND GROUND | 07/25/2025 | Approval - Private Provider | PPROVIDER |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 06/30/2025 | 07/01/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/30/2025 | 07/02/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/30/2025 | 07/08/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/02/2025 | 06/02/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/02/2025 | 06/02/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BFLOOD | COMPLETE | 05/19/2025 | 05/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/19/2025 | 05/22/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Provide detail or note on plans showing existing fence complies with R4501.17.1.8. Show door swing and latch height. | |||
| ELEC | COMPLETE | 05/19/2025 | 05/22/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/19/2025 | 05/21/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide manufacturer's information for pool pump indicating pump is two-speed or variable speed with lower speed capable at operating at one-half the rotation rate of the upper speed. Florida Energy Conservation Code Section R403.12 / APSP-15. | |||
| SW1 | HOLD | 05/19/2025 | 05/20/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE FLOW ARROW TO SHOW NEW DRAINAGE OF THE LOT AFTER POOL IS COMPLETED | |||
| ZON | HOLD | 05/19/2025 | 05/21/2025 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. MARK FENCE LOCATION ON SITE PLAN 2. POOL DOES NOT MEET FRONT SETBACK OF 20' (18' 6") |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/14/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/14/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/14/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/14/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/14/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/14/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/14/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/14/2026 |
| SW ENG INSPECTION 40 | ¤40.00 | 07/10/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/10/2025 |
| SITE PLAN 30 | ¤30.00 | 07/10/2025 |
| ADJUSTMENT 10% | (¤9.50) | 07/10/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/10/2025 |
| ADMINISTRATIVE - RESID PP | ¤75.00 | 07/10/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 07/10/2025 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/10/2025 |
| SURCHARGE - FS 468.631 | ¤2.41 | 07/10/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤414.91 |