I want to search for...

Permit #2025050792

Permit Details

Status: COED

Parcel Id: 07-11-31-7010-00300-0120
Block: 00300
Subdivision: 7010 -
Job Phone: 407-719-7500
Location Address: 46 FANSHAWE LN
Type: PO - POOL
Issue Date: 07/10/2025
NOC: RECORDED
Applicant name: MARC R MIHALSKY
Owner: JONES DAVID & STACY H&W

Address

46 FANSHAWE LANE

PALM COAST, FL 32137

Lot: 0120
Contracted Stated Job Value: ¤53,000.00
Job Description: SWIMMING POOL
Type: CN

Contractor

BLUE HAVEN POOLS & SPAS
Status Location Address State License Number Phone
ACTIVE

348 W SR 434

OVIEDO, FL 32765

CPC1458642 (Exp: 08/31/2026) 407-542-8770

Sub Contractors

CHRISTOPHER I HALL
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 2413

Bunnell, FL 32110

EC13002161 (Exp: 08/31/2028) (386) 437-2966 386-437-5042

Inspection History

Type Request Date Result Inspector
POOL FINAL 01/15/2026 CANCELLED BY APPLICANT WEB
POOL FINAL 01/15/2026 Approval - Private Provider PPROVIDER
U -UTILITY RESIDENTIAL FINAL 01/08/2026 FINAL APPROVED BHAINES
ROW - FINAL INSPECTION 01/07/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/07/2026 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 01/07/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ELECTRIC AND ALARM 10/03/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 09/18/2025 APPROVED - AS NOTED EMADISON
Note: Inspector Notes from Inspection 9470 ** 09/18/25 CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY 9/18/25= ED, PLEASE POST A STOP WORK ORDER ON THE PROPERTY IF THERE ARE NO CHANGES ON THE SITE. THANK YOU. Per Gbertola _____________________________________________________________________________________________________________________ 9/17/2025 - PREVIOUS INSPECTION NOTES 9/17/2025 - PREVIOUS INSPECTION NOTES ** 09/17/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/18/25 _______________________________________________________________________________________________________________________ 9/16/2025 - PREVIOUS INSPECTION NOTES ** 09/16/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/15/2025 - PREVIOUS INSPECTION NOTES ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 9/18/25= ED, PLEASE POST A STOP WORK ORDER ON THE PROPERTY IF THERE ARE NO CHANGES ON THE SITE. THANK YOU. Per Gbertola 9/17/2025 - PREVIOUS INSPECTION NOTES 9/17/2025 - PREVIOUS INSPECTION NOTES ** 09/17/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/18/25 _______________________________________________________________________________________________________________________ 9/16/2025 - PREVIOUS INSPECTION NOTES ** 09/16/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/15/2025 - PREVIOUS INSPECTION NOTES ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25
ROW - DRAINAGE 09/17/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/17/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/18/25 _______________________________________________________________________________________________________________________ 9/16/2025 - PREVIOUS INSPECTION NOTES ** 09/16/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/15/2025 - PREVIOUS INSPECTION NOTES ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25
ROW - DRAINAGE 09/17/2025 Disapproved - NO FEE EMADISON
Note: 9/17/2025 - PREVIOUS INSPECTION NOTES ** 09/17/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/18/25 _______________________________________________________________________________________________________________________ 9/16/2025 - PREVIOUS INSPECTION NOTES ** 09/16/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/15/2025 - PREVIOUS INSPECTION NOTES ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25
ROW - DRAINAGE 09/16/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/16/25 CORRECTIONS ARE STILL REQUIREDAS THE BUILDER HAS NOT ADDRESSED THE CORRECTIONS THAT HAVE BEEN NOTED SINCE THE FIRST DRAINAGE INSPECTION ON 09/04/25 THIS IS NOW BEING TURNED OVER TO CODE ENFORCEMENT.THIS IS AN ILLICIT DISCHARGE OF SEDIMENT INTO THE STORMWATER DRAINAGE SYSTEM ** LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. ** LDC DEC.9.04.06.Any sedimentation leaving the site or impacting adjacent areas shall be halted immediately and the adjacent areas restored to pre-existing conditions. ** 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. ** NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/15/2025 - PREVIOUS INSPECTION NOTES ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25
ROW - DRAINAGE 09/15/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/15/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/16/25 _______________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25
ROW - DRAINAGE 09/12/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/12/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/15/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25
ROW - DRAINAGE 09/11/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/11/25 NO CORRECTIONS HAVE BEEN MADE THIS PERMIT IS NOW ON PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE IF ALL CORRECTIONS ARE NOT MADE PRIOR TO THE INSPECTION ON 09/16/25 THIS WILL BE TURNED OVER TO CODE FOR A CODE CASE ** BUILDER IS STILL REQUIRED TO REMOVE THE LARGE PILE OF MATERIAL FROM THE (ROW) RIGHT OF WAY AND ROADSIDE SWALE REMOVE SEDIMENT THAT HAS ALREADY BEGUN TO ERODE INTO SWALE ** OPEN AND MAINTAN SWALE OR INSTALL A TEMPORARY PIPE A MINIMUM OF 10 INCHES IN DIAMETER ** FOLLOW UP INSPECTION ON 09/12/25 ________________________________________________________________________________________________________________ 9/4/2025 - PREVIOUS INSPECTION NOTES ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25
ROW - DRAINAGE 09/04/2025 Disapproved - NO FEE EMADISON
Note: ** 09/04/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AND REMOVE THE LARGE PILE OF MATERIAL FROM THE SWALE AND MAINTAIN DAILY OR INSTALL A TEMPORARY CULVERT PIPE A MINIMUM DIAMETER OF 10 INCHES IN ORDER FOR THE STORMWATER TO FLOW UNOBSTRUCTED ** YOU WILL HAVE (5) DAYS IN WHICH TO MAKE ALL REQUIRED CORRECTIONS IF THEY ARE NOT MADE BY THE NEXT SCHEDULED INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS INSPECTIONS WILL BE CONDUCTED DAILY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25
POOL DECK 08/29/2025 Approval - Private Provider PPROVIDER
STEEL AND GROUND 07/25/2025 Approval - Private Provider PPROVIDER

Review History

Department Status Date In Date Out
ZON COMPLETE 06/30/2025 07/01/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BLD COMPLETE 06/30/2025 07/02/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 06/30/2025 07/08/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
MECH COMPLETE 06/02/2025 06/02/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
SW1 COMPLETE 06/02/2025 06/02/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BFLOOD COMPLETE 05/19/2025 05/23/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 05/19/2025 05/22/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Provide detail or note on plans showing existing fence complies with R4501.17.1.8. Show door swing and latch height.
ELEC COMPLETE 05/19/2025 05/22/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH HOLD 05/19/2025 05/21/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide manufacturer's information for pool pump indicating pump is two-speed or variable speed with lower speed capable at operating at one-half the rotation rate of the upper speed. Florida Energy Conservation Code Section R403.12 / APSP-15.
SW1 HOLD 05/19/2025 05/20/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE FLOW ARROW TO SHOW NEW DRAINAGE OF THE LOT AFTER POOL IS COMPLETED
ZON HOLD 05/19/2025 05/21/2025
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. MARK FENCE LOCATION ON SITE PLAN 2. POOL DOES NOT MEET FRONT SETBACK OF 20' (18' 6")

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 01/14/2026
SW ENG - INSPECTION 20 ¤20.00 01/14/2026
SW ENG - INSPECTION 20 ¤20.00 01/14/2026
SW ENG - INSPECTION 20 ¤20.00 01/14/2026
SW ENG - INSPECTION 20 ¤20.00 01/14/2026
SW ENG - INSPECTION 20 ¤20.00 01/14/2026
SW ENG - INSPECTION 20 ¤20.00 01/14/2026
SW ENG - INSPECTION 20 ¤20.00 01/14/2026
SW ENG INSPECTION 40 ¤40.00 07/10/2025
SW ENG - REVIEW 20 ¤20.00 07/10/2025
SITE PLAN 30 ¤30.00 07/10/2025
ADJUSTMENT 10% (¤9.50) 07/10/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/10/2025
ADMINISTRATIVE - RESID PP ¤75.00 07/10/2025
PLAN REVIEW - RESIDENTIAL ¤65.00 07/10/2025
SURCHARGE FS 533.721 ¤2.00 07/10/2025
SURCHARGE - FS 468.631 ¤2.41 07/10/2025
Fees Total Due: ¤0.00 Total Paid: ¤414.91