Permit #2025050855

Permit Details

Status: COED

Parcel Id: 03-12-31-1125-00000-R010
Block: 01010
Subdivision: 2112 - COLBERT LANDINGS PH 1
Job Phone: 904-772-1316
Location Address: 5 ARMOYAN DR
Type: CAS - COMMERCIAL ACCESSORY STRUCTURE
Issue Date: 08/05/2025
NOC: RECORDED
Applicant name: AARON JAMES GALLEY
Owner: MERITAGE HOMES OF FLORIDA INC

Address

8800 E RAINTREE DRIVE

SCOTTSDALE, AZ 85260

Lot: 0130
Contracted Stated Job Value: ¤20,000.00
Job Description: Colbert Pickleball Court
Type: CN

Contractor

K & G CONSTRUCTION CO INC
Status Location Address State License Number Phone
ACTIVE

542 EDGEWOOD AVE S

JACKSONVILLE, FL 32205

CGC1511097 (Exp: 08/31/2026) 904-772-1316

Inspection History

Type Request Date Result Inspector
LDSC- LANDSCAPE FINAL 08/08/2025 APPROVED RPICATAGI
MONOLITHIC SLAB 08/07/2025 Disapproved -FEE REQUIRED KSANDOE
Note: Work is complete. Unable to inspect
ACCESSORY FINAL 08/07/2025 Disapproved - NO FEE KSANDOE
Note: Slab must pass first
ACCESSORY FINAL 08/07/2025 APPROVED - AS NOTED PBUCKLEY
Note: 8/7/2025 - PREVIOUS INSPECTION NOTES Slab must pass first 08/07/25 Monolithic slab inspection not required for this permit. Sports court, not a structural slab. Being that is the only correction, I've approved this Accessory Final Inspection.

Review History

Department Status Date In Date Out
BLD COMPLETE 07/30/2025 08/05/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 07/08/2025 07/08/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM REPEAT COMMENT: 3. Provide foundation details for posts. 107.2.1(PROVIDE FOUNDATION DETAIL FROM ENGINEER. PLAN STILL SHOWS FOOTING BY ENGINEER. DRAWING OF DETAIL NOT UPLOADED)
BLD HOLD 06/20/2025 06/30/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. ok 2. ok 3. Provide foundation details for posts. 107.2.1(PROVIDE FOUNDATION DETAIL FROM ENGINEER OR SHOP DRAWING) 4. ok 5. ok 6. ok 7. ok. 8. ok 9. Provide gate detail indicating gate surfaces qwithin 10 inches above the ground to have smooth surfaces on the push side of gate for the full width of gates. Section 404.2.10( I SEE NOTE. GATE DETAIL NEEDS TO SHOW SMOOTH SURFACE.)
ARCHR COMPLETE 05/20/2025 06/04/2025
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BFLOOD COMPLETE 05/20/2025 05/29/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 05/20/2025 05/29/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plan sheets need to be digitally signed, sealed and verifiable by a licensed Florida PE. F.S.471.025 2. Reference FBC 2023 code cycle on plans 107.2.1 3. Provide foundation details for posts. 107.2.1 4. Provide gate latches and hardware details at public access gates that meet reach ranges based on direction of approach (both sides of gate) and that require no grasping, pinching or turning of the wrist. Sections 308, 309.4. 404.2.7. 5. If gates are to have spring hinges and / or gate closers, provide details in accordance with Section 404.2.8, 404.2.8.1, 404.2.8.2 and 404.2.9. 6. Show landing dimensions and areas on each side of each gate. Slopes at landings at gates not to exceed 2% in any direction. Landings to be as wide as gates plus clearance beyond latch side and 48 inches in the direction of travel based on forward approach. 7. Show required maneuvering clearances at gates including minimum clear dimension beyond latch side of gates on both sides of gates based on direction of approach and swing of gates. . 8. Show minimum clear opening width at each gate of 32 inches. Section 404.2.3. 9. Provide gate detail indicating gate surfaces qwithin 10 inches above the ground to have smooth surfaces on the push side of gate for the full width of gates. Section 404.2.10
DSD COMPLETE 05/20/2025 05/23/2025
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM
ELEC COMPLETE 05/20/2025 05/28/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 CANCEL 05/20/2025 05/30/2025
PLENG COMPLETE 05/20/2025 05/21/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
UD1 COMPLETE 05/20/2025 05/23/2025
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION - COMMERCIAL ¤60.00 08/07/2025
IMPACT FEE FIRE ¤1,503.60 08/05/2025
SURCHARGE FS 533.721 ¤2.61 08/05/2025
SURCHARGE - FS 468.631 ¤3.92 08/05/2025
SITE PLAN 30 ¤30.00 08/05/2025
ADJUSTMENT 10% (¤29.00) 08/05/2025
ADMINISTRATIVE - COMMERCIAL ¤75.00 08/05/2025
INSPECTION COMMERCIAL ¤140.00 08/05/2025
INSPECTION - FIRE COMMERCIAL ¤5.00 08/05/2025
PLAN REVIEW - COMMERCIAL ¤70.00 08/05/2025
Fees Total Due: ¤0.00 Total Paid: ¤1,861.13