Permit #2025050906

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7024-00540-0370
Block: 00540
Subdivision: 7024 -
Job Phone: 786-512-4421
Location Address: 21 PROVIDENCE LN
Type: DR - DRIVEWAY
Issue Date: 06/03/2025
NOC: RECORDED
Applicant name: ABEL MENENDEZ
Owner: MATHELIER ROSELANDE

Address

21 PROVIDENCE LANE

PALM COAST, FL 32164

Lot: 0370
Contracted Stated Job Value: ¤16,500.00
Job Description: Replace concrete drive way with pavers
Type: CN

Contractor

ROYAL TILE & PAVERS INC
Status Location Address Phone
ACTIVE

69 FLEETWOOD DR

PALM COAST, FL 32137

786-512-4421

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 10/20/2025 APPROVED TPOLACEK
Note: 10-20-25 TPOLACEK*** PAVERS ARE NOW SET. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/29/2025 - PREVIOUS INSPECTION NOTES 09-29-25 TPOLACEK*** THERE ARE A FEW PAVERS ALONG LEFT SIDE THAT ARE NOT SECURED TO PAVER RESTRAINT. PLEASE SECURE PAVERS. APPROVING THE AFTER POUR AND HOLDING THE FINAL ROW. Inspector Notes from Inspection 9270 06/16/25 TPOLACEK*** PAVER BASE IN ROADWEAY MUST BE REMOVED ASAP. PAVERS APPROVED TO BE SET. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS Inspector Notes from Inspection 9270 06/16/25 TPOLACEK*** PAVER BASE IN ROADWEAY MUST BE REMOVED ASAP. PAVERS APPROVED TO BE SET. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
U -UTILITY RESIDENTIAL FINAL 09/29/2025 APPROVED - AS NOTED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 09/29/2025 APPROVED - AS NOTED TPOLACEK
Note: 09-29-25 TPOLACEK*** THERE ARE A FEW PAVERS ALONG LEFT SIDE THAT ARE NOT SECURED TO PAVER RESTRAINT. PLEASE SECURE PAVERS. APPROVING THE AFTER POUR AND HOLDING THE FINAL ROW. Inspector Notes from Inspection 9270 06/16/25 TPOLACEK*** PAVER BASE IN ROADWEAY MUST BE REMOVED ASAP. PAVERS APPROVED TO BE SET. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW - FINAL INSPECTION 09/29/2025 Disapproved - NO FEE TPOLACEK
Note: 09-29-25 TPOLACEK*** THERE ARE A FEW PAVERS ALONG LEFT SIDE THAT ARE NOT SECURED TO PAVER RESTRAINT. PLEASE SECURE PAVERS. APPROVING THE AFTER POUR AND HOLDING THE FINAL ROW. Inspector Notes from Inspection 9270 06/16/25 TPOLACEK*** PAVER BASE IN ROADWEAY MUST BE REMOVED ASAP. PAVERS APPROVED TO BE SET. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS Inspector Notes from Inspection 9270 06/16/25 TPOLACEK*** PAVER BASE IN ROADWEAY MUST BE REMOVED ASAP. PAVERS APPROVED TO BE SET. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 06/16/2025 APPROVED - AS NOTED TPOLACEK
Note: 06/16/25 TPOLACEK*** PAVER BASE IN ROADWEAY MUST BE REMOVED ASAP. PAVERS APPROVED TO BE SET. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/10/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PAVER RESTRAINTS 06/10/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 06/10/2025 PARTIALLY APPROVED TPOLACEK
Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS

Review History

Department Status Date In Date Out
ZON COMPLETE 05/22/2025 05/22/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/21/2025 05/21/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
UTL COMPLETE 05/21/2025 05/27/2025
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 05/21/2025 05/21/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utililzation Agreement.
SWALE COMPLETE 05/21/2025 05/23/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤3.00) 06/03/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/03/2025
RECORDING FEE REIMBURSE DOC ¤44.00 06/03/2025
SW ENG INSPECTION 40 ¤40.00 06/03/2025
SW ENG PRE APRON ¤30.00 06/03/2025
SW ENG RES REVIEW 200 ¤200.00 06/03/2025
SITE PLAN 15 ¤15.00 06/03/2025
Fees Total Due: ¤0.00 Total Paid: ¤356.00