I want to search for...
Permit #2025050966
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00210-0190 |
| CONDITIONED SPACE: 1873 sqft |
| GARAGE: 759 sqft |
| OPENED PORCH (WITH ROOF) : 249 sqft |
| Total Square Footage: 2881 sqft |
| Block: 00210 |
| Subdivision: - |
| Job Phone: 352-433-8382 |
| Location Address: 12 SEVILLE ORANGE PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/09/2025 |
| NOC: RECORDED |
| Applicant name: ALFREDO E SCHEER |
| Owner: REHOBOTH REAL ESTATE LLC |
|
Address 1335 KINGSLEY AVE ORANGE PARK, FL 32067 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
ESTELA LIVING LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
237 S. DIXIE HWY, 4TH FLOOR CORAL GABLES, FL 33133 |
CGC1534535 (Exp: 08/31/2026) | 352-433-8382 |
Sub Contractors
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/29/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/29/2025 2:28:13 PM *** Inspector Notes from Inspection 2320 10/14/25 The following items need to be address before scheduling any other inspections to avoid failure and fees 1. Swale needs to be clear to allow for proper flow FBC 3303.5 2. Porta jon nneds to be moved out of swale FBC 3303.5 | |||
| U-CROSS CONNECTION | 12/29/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR | |||
| U -UTILITY RESIDENTIAL FINAL | 12/29/2025 | FINAL APPROVED | BHAINES |
| ROW - FINAL APRON (AFTER POUR) | 12/26/2025 | APPROVED | RRICKS |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/26/2025 | APPROVED | RRICKS |
| Note: RRicks Approved as noted - A few grades adjacent to home were shot on top of mulch reflecting a slighyly higher elevation. Actutally grade is lower. At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25 YOU MUST HAVE A MINIMUM OF 4" BELOW FFE SOD ELEVATIONS AT STRUCTURE ELEVATION SHOTS. PLEASE SEE PHOTO FOR REFERENCE. 4" FOR BLOCK 6" FOR WOOD Section 200.01.1.b. (12) "(12) The elevation of finished grading at corners and at 10-foot intervals directly adjacent to the home’s foundation on all sides shall be shown. Finished grade elevations shall not be less than 0.33 tenths of a foot (4 inches) lower than the FFE of the living area for CMU construction and not less than 0.5 tenths of a foot (6 inches) lower than the FFE of the living area for wood framed construction and where siding or foam plastic insulation is installed. • The elevation at the front property line shall be shown at 10-foot intervals and shall match the elevation of the edge of pavement (EOP). • The FFE of the home’s living space shall not be less than 12 inches above the crown of the road. • The FFE shall be at the lowest elevation necessary to provide positive slope to convey stormwater to the drainage outfall but no higher than 1.83 feet (22 inches) above the crown of the road. • Exception: a higher FFE may be approved by the City Engineer. • The FFE shall be no more than 0.833 of a foot (10 inches) different than the lowest FFE of the adjacent (left and right side) lots. • FFE should not be lower than existing homes unless there is a site-specific condition (ex. Road and ground slope downward). • The FFE of homes proposed within subdivisions with a City approved Preliminary Plat application shall match the FFE shown on the approved plans." | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/26/2025 | APPROVED | RRICKS |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 12/26/2025 | APPROVED | RRICKS |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/23/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 12/23/25 YOU MUST HAVE A MINIMUM OF 4" BELOW FFE SOD ELEVATIONS AT STRUCTURE ELEVATION SHOTS. PLEASE SEE PHOTO FOR REFERENCE. 4" FOR BLOCK 6" FOR WOOD Section 200.01.1.b. (12) "(12) The elevation of finished grading at corners and at 10-foot intervals directly adjacent to the home’s foundation on all sides shall be shown. Finished grade elevations shall not be less than 0.33 tenths of a foot (4 inches) lower than the FFE of the living area for CMU construction and not less than 0.5 tenths of a foot (6 inches) lower than the FFE of the living area for wood framed construction and where siding or foam plastic insulation is installed. • The elevation at the front property line shall be shown at 10-foot intervals and shall match the elevation of the edge of pavement (EOP). • The FFE of the home’s living space shall not be less than 12 inches above the crown of the road. • The FFE shall be at the lowest elevation necessary to provide positive slope to convey stormwater to the drainage outfall but no higher than 1.83 feet (22 inches) above the crown of the road. • Exception: a higher FFE may be approved by the City Engineer. • The FFE shall be no more than 0.833 of a foot (10 inches) different than the lowest FFE of the adjacent (left and right side) lots. • FFE should not be lower than existing homes unless there is a site-specific condition (ex. Road and ground slope downward). • The FFE of homes proposed within subdivisions with a City approved Preliminary Plat application shall match the FFE shown on the approved plans." | |||
| ROW- PRE-APRON (PRE-POUR) | 12/03/2025 | APPROVED | FSLADISH |
| Note: 12/3/25 PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AT THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. Inspector Notes from Inspection 9470 11/13/25 REQUIRED CORRECTION COMPLETED AT THE TIME OF THIS INSPECTION. THIS SITE WILL BE MONITORED FOR CONTINUED COMPLIANCE THROUGHOUT THE CONSTRUCTION PROCESS, APPROVING AS NOTED THAT SITE WILL NEED TO BE KEPT IN COMPLIANCE WITH COPC STANDARDS. 11/10/2025 - PREVIOUS INSPECTION NOTES 11/10/25 YOUR CULVERT PIPE IS CRUSHED ON THE LEFT SIDE, FULLY CLOGGED AND STICKING UP IN THE AIR ON THE RIGHT SIDE NOT AT GRADE. YOU ARE REQUIRED TO CLEAN OUT THE CULVERT PIPE REPAIR IF NECCESSARY, RESET TO GRADE WITH APPROPRIATE COVER OVER IT. YOU HAVE TRASH AND DEBRIS ALL IN THE COPC FRONT SWALE AND ALL OVER YOUR SITE THAT NEEDS TO BE CLEANED UP.. YOUR DUMPSTER IS OVERFLOWING. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 11/13/25 AT WHICH TIME A PERMIT HOLD WILL BE PLACED IF REQUIRED COPC STANDARDS CORRECTIONS ARE NOT COPMPLETED. SEE PHOTO FOR REFERENCE. 11/3/2025 - PREVIOUS INSPECTION NOTES 11/3/25 YOU ARE REQUIRED TO OPEN THE SWALE EXPOSE CULVERT PIPE ENDS AND CLEAN ALL DIRT AND DEBRIS FROM INSIDE OF PIPE. REMOVE PORTA POTTY AND PALLET FROM COPC ROW *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 11/13/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/13/25 REQUIRED CORRECTION COMPLETED AT THE TIME OF THIS INSPECTION. THIS SITE WILL BE MONITORED FOR CONTINUED COMPLIANCE THROUGHOUT THE CONSTRUCTION PROCESS, APPROVING AS NOTED THAT SITE WILL NEED TO BE KEPT IN COMPLIANCE WITH COPC STANDARDS. 11/10/2025 - PREVIOUS INSPECTION NOTES 11/10/25 YOUR CULVERT PIPE IS CRUSHED ON THE LEFT SIDE, FULLY CLOGGED AND STICKING UP IN THE AIR ON THE RIGHT SIDE NOT AT GRADE. YOU ARE REQUIRED TO CLEAN OUT THE CULVERT PIPE REPAIR IF NECCESSARY, RESET TO GRADE WITH APPROPRIATE COVER OVER IT. YOU HAVE TRASH AND DEBRIS ALL IN THE COPC FRONT SWALE AND ALL OVER YOUR SITE THAT NEEDS TO BE CLEANED UP.. YOUR DUMPSTER IS OVERFLOWING. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 11/13/25 AT WHICH TIME A PERMIT HOLD WILL BE PLACED IF REQUIRED COPC STANDARDS CORRECTIONS ARE NOT COPMPLETED. SEE PHOTO FOR REFERENCE. 11/3/2025 - PREVIOUS INSPECTION NOTES 11/3/25 YOU ARE REQUIRED TO OPEN THE SWALE EXPOSE CULVERT PIPE ENDS AND CLEAN ALL DIRT AND DEBRIS FROM INSIDE OF PIPE. REMOVE PORTA POTTY AND PALLET FROM COPC ROW *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| GRAVITY SEWER TEST | 11/12/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION FBC 3303.5 SWALE BLOCKED | |||
| SEWER TIE IN | 11/12/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION FBC 3303.5 SWALE BLOCKED | |||
| ELECTRIC - EARLY POWER | 11/12/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ELECTRIC - EARLY POWER | 11/10/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 11/15/25 1. Garage lights have wire missing sheathing | |||
| ROW - DRAINAGE | 11/10/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 11/10/25 YOUR CULVERT PIPE IS CRUSHED ON THE LEFT SIDE, FULLY CLOGGED AND STICKING UP IN THE AIR ON THE RIGHT SIDE NOT AT GRADE. YOU ARE REQUIRED TO CLEAN OUT THE CULVERT PIPE REPAIR IF NECCESSARY, RESET TO GRADE WITH APPROPRIATE COVER OVER IT. YOU HAVE TRASH AND DEBRIS ALL IN THE COPC FRONT SWALE AND ALL OVER YOUR SITE THAT NEEDS TO BE CLEANED UP.. YOUR DUMPSTER IS OVERFLOWING. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 11/13/25 AT WHICH TIME A PERMIT HOLD WILL BE PLACED IF REQUIRED COPC STANDARDS CORRECTIONS ARE NOT COPMPLETED. SEE PHOTO FOR REFERENCE. 11/3/2025 - PREVIOUS INSPECTION NOTES 11/3/25 YOU ARE REQUIRED TO OPEN THE SWALE EXPOSE CULVERT PIPE ENDS AND CLEAN ALL DIRT AND DEBRIS FROM INSIDE OF PIPE. REMOVE PORTA POTTY AND PALLET FROM COPC ROW *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| ROW - DRAINAGE | 11/03/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 11/3/25 YOU ARE REQUIRED TO OPEN THE SWALE EXPOSE CULVERT PIPE ENDS AND CLEAN ALL DIRT AND DEBRIS FROM INSIDE OF PIPE. REMOVE PORTA POTTY AND PALLET FROM COPC ROW *** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. | |||
| LATH/BRICK/ WATER BARRIER | 10/14/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 10/14/25 The following items need to be address before scheduling any other inspections to avoid failure and fees 1. Swale needs to be clear to allow for proper flow FBC 3303.5 2. Porta jon nneds to be moved out of swale FBC 3303.5 | |||
| INSULATION | 10/09/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 10-6-25 1. No 5' head pressure. | |||
| ALL ROUGH | 10/06/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10-6-25 1. No 5' head pressure. | |||
| WALL SHEATHING | 10/03/2025 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 09/22/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 9/19/2025 1:46:40 PM *** 9/19/25: Approved as noted to check at next inspection. 1). Knee wall at entry are required to be 16" OC. Highlighted. FBC [A]107.4 2). Anchor bolts requires 3" washers but 2" are installed. FBC [A]107.4 3). Please fix any stusses that are not plumb and/or are bowed significantly. FBC [A]107.4 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/19/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/19/2025 1:46:40 PM *** 9/19/25: Approved as noted to check at next inspection. 1). Knee wall at entry are required to be 16" OC. Highlighted. FBC [A]107.4 2). Anchor bolts requires 3" washers but 2" are installed. FBC [A]107.4 3). Please fix any stusses that are not plumb and/or are bowed significantly. FBC [A]107.4 | |||
| TIE BEAM / LINTEL | 08/29/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2250 8/21/25 1. Porta jon needs to be moved out of the swale FBC 3303.5 --Noting that trusses are on site | |||
| WATER METER INSTALLATION REQUEST | 08/28/2025 | APPROVED | CBOWERMASTER |
| MONOLITHIC SLAB | 08/21/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 8/21/25 1. Porta jon needs to be moved out of the swale FBC 3303.5 --Noting that trusses are on site | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/19/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: FBC 3303.5 SWALE BLOCKED | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 08/15/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 08/15/2025 | APPROVED | PKNAPIK |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 12/22/2025 | 12/22/2025 |
| Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM BLOWER DOOR SUBMITTED IS FOR ANOTHER ADDRESS AND JURISDICTION IS LISTED AS ANOTHER COUNTY | |||
| BLD | COMPLETE | 09/23/2025 | 09/29/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/19/2025 | 09/22/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM FL# 15943 not horizontal slider. | |||
| BLD | COMPLETE | 08/13/2025 | 08/15/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/13/2025 | 08/15/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/13/2025 | 08/13/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/11/2025 | 08/12/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Need to submit initial Geotech report | |||
| SW1 | COMPLETE | 07/01/2025 | 07/02/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved contingent on final survey. | |||
| ENGIN1 | COMPLETE | 07/01/2025 | 07/02/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/01/2025 | 07/02/2025 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/18/2025 | 06/24/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM New homes shall not be considerably lowet than existing homes. The proposed FF for this home is 1.24' lower than lot 20. The maximum allowable difference between FFEs is 0.83' (10"). Please revise site plan to meet COPC standards. As always, please feel free call or email me if there any questions or concerns to prevent any further delays. | |||
| ENGIN1 | COMPLETE | 06/18/2025 | 06/23/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/18/2025 | 06/20/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/17/2025 | 06/17/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM After further review there shall be 0.3 fall from the back property line to the toe of swale. Common swales are preferred alonf vacant lots. Please revise with a common swale between vacant lot 18. | |||
| SW1 | COMPLETE | 06/13/2025 | 06/17/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/13/2025 | 06/16/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/13/2025 | 06/13/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/03/2025 | 06/03/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/03/2025 | 06/10/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM There is a low spot in the backyard. 28.85', additionally along the left side of the property there shall be fall to the proposed common swale between both property lines. Flow lines in the front of property are higher than the elevations along the front property line. | |||
| ENGIN1 | COMPLETE | 06/03/2025 | 06/04/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/22/2025 | 05/28/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/22/2025 | 05/28/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/22/2025 | 05/29/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/22/2025 | 05/23/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/22/2025 | 05/22/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/22/2025 | 05/23/2025 |
| LOCATE | COMPLETE | 05/22/2025 | 05/28/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/22/2025 | 05/27/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/22/2025 | 05/29/2025 |
| Note: Held By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM -The back property line shall have a 0.3' fall to the swale to ensure there is no impact to the lots in the back. - In the first 10' from the home there shall be a 6" drop per building code. - This lot is negatively impacting lot 20 | |||
| ZON | HOLD | 05/22/2025 | 05/22/2025 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. SITE PLAN MISSING SETBACKS | |||
| SWALE | COMPLETE | 05/22/2025 | 06/18/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 12/29/2025 |
| RSI REINSPECTION 1 | ¤35.00 | 12/29/2025 |
| RSI REINSPECTION 2 | ¤75.00 | 12/29/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 07/09/2025 |
| SURCHARGE FS 533.721 | ¤12.31 | 07/09/2025 |
| SURCHARGE - FS 468.631 | ¤18.47 | 07/09/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/09/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/09/2025 |
| SW ENG PRE APRON | ¤30.00 | 07/09/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/09/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/09/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 07/09/2025 |
| SEWER CREDIT | (¤2,465.75) | 07/09/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 07/09/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 07/09/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 07/09/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 07/09/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 07/09/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 07/09/2025 |
| SITE PLAN 30 | ¤30.00 | 07/09/2025 |
| WATER- TURN ON | ¤50.00 | 07/09/2025 |
| ADJUSTMENT 10% | (¤136.79) | 07/09/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/09/2025 |
| INSPECTION - RESIDENTIAL | ¤1,042.25 | 07/09/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤295.62 | 07/09/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 07/09/2025 |
| IMPACT FEE FIRE | ¤434.51 | 07/09/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/09/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/09/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 07/09/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/09/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 07/09/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,512.32 |