Permit #2025051206

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7014-00070-1680
Block: 00070
Subdivision: 7014 -
Job Phone: 407-719-7500
Location Address: 30 CLEVELAND CT
Type: PO - POOL
Issue Date: 07/09/2025
NOC: RECORDED
Applicant name: MARC R MIHALSKY
Owner: BRITT LINDSEY L & JAMES D III H&W

Address

30 CLEVELAND COURT

PALM COAST, FL 32137

Lot: 1680
Contracted Stated Job Value: ¤93,000.00
Job Description: SWIMMING POOL W/SPA & PAVER DECK
Type: CN

Contractor

BLUE HAVEN POOLS & SPAS
Status Location Address State License Number Phone
ACTIVE

348 W SR 434

OVIEDO, FL 32765

CPC1458642 (Exp: 08/31/2026) 407-542-8770

Sub Contractors

CHRISTOPHER I HALL
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 2413

Bunnell, FL 32110

EC13002161 (Exp: 08/31/2028) (386) 437-2966 386-437-5042

Inspection History

Type Request Date Result Inspector
ELECTRIC AND ALARM 06/01/2026
POOL DECK 03/11/2026 Approval - Private Provider PPROVIDER
STEEL AND GROUND 11/04/2025 Approval - Private Provider PPROVIDER
STEEL AND GROUND 10/03/2025 Approval - Private Provider PPROVIDER
SUBGRADE - FIBERGLASS POOL
POOL FINAL
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW FIELD SURVEY /GRADING CERTIFICATION
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
BADMIN INFORMATION 10/14/2025 10/14/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM For inspection result reports, the license number of the inspector license number.
BLD COMPLETE 08/26/2025 09/02/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 08/26/2025 08/26/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 08/26/2025 08/26/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD HOLD 08/18/2025 08/21/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Provide detail or note on plans showing existing fence complies with R4501.17.1.8. Show door swing and latch height. 2nd Request
BLD COMPLETE 07/02/2025 07/02/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 07/02/2025 07/02/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BFLOOD COMPLETE 07/02/2025 07/07/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 06/25/2025 06/25/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD HOLD 06/25/2025 06/30/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Fence and latches have to be done prior to the pool being complete. Change you comment on the site plan.
BFLOOD COMPLETE 06/25/2025 06/30/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON HOLD 06/10/2025 06/10/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment by Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Per land development pools must be enlcosed by fence or screen enclosure. Show the fence on site plan if a fence will enclose pool .
BFLOOD HOLD 06/10/2025 06/17/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Flood zone lines and BFE are missing from the Site Plan/Survey. 2. Provide pool deck elevation for proposed pool. 3. Ok 4. Ok 2nd Request
BLD HOLD 06/10/2025 06/17/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Provide detail or note on plans showing existing fence complies with R4501.17.1.8. Show door swing and latch height. 2nd Request
BFLOOD HOLD 05/28/2025 05/29/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Flood zone lines and BFE are missing from the Site Plan/Survey. 2. Provide pool deck elevation for proposed pool. 3. Structural systems supporting proposed pool to be designed, connected and anchored to resist flotation, collapse or permanent lateral movement due to structural loads and stresses from flooding equal to the design flood elevation. Provide engineering statement on engineered pool plans indicating design conforms to this section. R322.1.2. 4. Pool equipment shall be installed at or above the design flood elevation provided it is elevated to the extent practical and is anchored to prevent flotation and resist flood forces and is supplied by branch circuits that have ground-fault cicuit interrupter protection. Electrical wiring systems are permitted below the design flood elevation provided they conform to the provisions of the Electrical Code for wet locations. Add note to plans indicating a.) pool equipment will be installed at the highest elevation possible; b.) that all pool equiment will be anchored in a manner to prevent flotation and to resist flood forces; c.) that pool electrical equipment will be provided with branch circuites that are ground-fault circuit interrupter protected and d.) that all electrical equipment to be installed as required for wet locations per the 2017 NEC. R322.1.6 Exception.
BLD HOLD 05/28/2025 05/30/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Provide detail or note on plans showing existing fence complies with R4501.17.1.8. Show door swing and latch height.
ELEC COMPLETE 05/28/2025 05/30/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 05/28/2025 05/29/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/28/2025 05/29/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 05/28/2025 05/28/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Per land development pools must be enlcosed by fence or screen enclosure.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤10.25) 07/09/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/09/2025
ADMINISTRATIVE - RESID PP ¤75.00 07/09/2025
PLAN REVIEW - RESIDENTIAL ¤72.54 07/09/2025
SURCHARGE FS 533.721 ¤2.00 07/09/2025
SURCHARGE - FS 468.631 ¤2.51 07/09/2025
SW ENG INSPECTION 40 ¤40.00 07/09/2025
SW ENG - REVIEW 20 ¤20.00 07/09/2025
SITE PLAN 30 ¤30.00 07/09/2025
Fees Total Due: ¤0.00 Total Paid: ¤261.80