| Type |
Request Date |
Result |
Inspector |
|
ROW CABLE PROJECT STATUS |
04/14/2026 |
Status Check |
FSLADISH |
|
ROW - FINAL INSPECTION |
04/14/2026 |
Disapproved - NO FEE |
FSLADISH |
|
Note: *** NOTES ADDED BY FSLADISH 4/14/2026 3:03:07 PM ***
Where any work disturbs the area Sec. 42-52. - Restoration and clean up. Where any work disturbs the area outside the roadway, the permittee shall insure that the area is completely restored to a like or better condition than that which existed prior to construction or, in a manner acceptable to the City Sec. 42-52. - Restoration and clean up. (C)
4/14/26 YOU ARE REQUIRED TO RAKE/DIG/SMOOTH OUT AND SOD TO GRADE ALL BARE AREAS IN THE WORK ZONE TO AS GOOD OR BETTER CONDITION THAN WHEN PROJECT BEGAN. THERE ARE SEVERAL LONG AREAS OF BARE EARTH THROUGHOUT THE ENTIRE WORK ZONE WHERE TRENCHING OCCURED THAT REQUIRE REPAIR/SOD CORRECTION BEFORE ROW FINAL PASSAGE.
Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage
|
|
ROW - FINAL INSPECTION |
|
|
|
|
Note:
4/14/2026 - PREVIOUS INSPECTION NOTES
4/14/26 YOU ARE REQUIRED TO RAKE/DIG/SMOOTH OUT AND SOD TO GRADE ALL BARE AREAS IN THE WORK ZONE TO AS GOOD OR BETTER CONDITION THAN WHEN PROJECT BEGAN. THERE ARE SEVERAL LONG AREAS OF BARE EARTH THROUGHOUT THE ENTIRE WORK ZONE WHERE TRENCHING OCCURED THAT REQUIRE REPAIR/SOD CORRECTION BEFORE ROW FINAL PASSAGE.
Lot Grading Permit Requirements (Improved Properties) Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage
|
| Department |
Status |
Date In |
Date Out |
|
BADMIN |
COMPLETE |
07/07/2025 |
07/07/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
|
|
BADMIN |
HOLD |
07/03/2025 |
07/03/2025 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
1. SUBMIT JOB ADDRESS |
|
SW1 |
COMPLETE |
06/20/2025 |
06/26/2025 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
|
|
TRENG |
COMPLETE |
06/20/2025 |
07/03/2025 |
| Note: Released By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM
|
|
SW1 |
HOLD |
06/10/2025 |
06/12/2025 |
| Note: Held By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM
** 06/12/25 AS REQUESTED IN PREVIOUS REVIEW NEED TO PROVIDE THE NAME AND CONTACT PHONE NUMBER OF THE ON-SITE SUPERVISOR IN THE FIELD AS WELL AS ADDRESS FOR THE STARTING AND ENDING POINTS OF WORK BEING PROPOSED IN THE (ROW) RIGHT OF WAY |
|
TRENG |
HOLD |
06/10/2025 |
06/12/2025 |
| Note: Held By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM
The city is finalizing a signalization plan for the intersection of Seminole Woods and Airport Commerce. Please coordinate with the project manager to avoid any conflicts with the signal installation.
Tyler Gibson
TGibson@palmcoastgov.com
Tel: 386-986-4756756
|
|
SW1 |
HOLD |
05/29/2025 |
06/03/2025 |
| Note: Held By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM
** 06/03/25 PLEASE PROVIDE THE CONTACT INFORMATION (PHONE NUMBER AND NAME OF THE ON-SITE FIELD SUPERVISOR) ALSO PLEASE PROVIDE THE STARTING POINT ADDRESS AND THE END POINT ADDRESS. |
|
TRENG |
HOLD |
05/29/2025 |
06/06/2025 |
| Note: Held By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM
1. Tie-in point at SR-100 is within FDOT right of way and active FDOT project. FDOT will be installing a right turn lane where the tie in point located. Please provide an approved FDOT permit.
2. City of Palm Coast (COPC) fiber optic line is project to be installed in the same location. Please co-ordinate with COPC project Manger;
Bill Eldredge
IT Broadband Manager
Tel: 386-986-3757
beldredge@palmcoastgov.com
|
|
UD1 |
COMPLETE |
05/29/2025 |
05/30/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
|