Permit #2025060081
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7034-00750-0020 |
| Block: 00750 |
| Subdivision: - |
| Job Phone: 386-234-9464 |
| Location Address: 67 EGRET TR |
| Type: DR - DRIVEWAY |
| Issue Date: 06/03/2025 |
| NOC: RECORDED |
| Applicant name: CYRUS BROWN |
| Owner: BROWN GEORGE & DEITRA C SYDNOR |
|
Address 67 EGRET TRAIL PALM COAST, FL 32164 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤9,500.00 |
| Job Description: REF 2022100426 DRIVEWAY |
| Type: CN |
| Original Permit #: 2022100426 |
Contractor
FLAGLER FINISH & CONCRETE LLC
| Status | Location Address | Mailing Address | Phone |
| ACTIVE |
101 PALM HARBOR PKWY BUNNELL, FL 32110 |
#209A PALM COAST, FL 32137 |
386-234-9464 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 06/06/2025 | APPROVED | FSLADISH |
| Note: 6/6/25 THIS IS A REISSUED PERMIT, THE DRIVEWAY POUR HAS BEEN DONE FOR AWHILE. CHECKED ELEVATION AND PIPE OK AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _______________________________________________________________________________________________________________________ 6/4/2025 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL DIRT FROM CULVERT PIPE SO WE CAN CHECK THE CULVERT ELEVATION CORRECTLY. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/04/2025 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 06/04/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO CLEAN ALL DIRT FROM CULVERT PIPE SO WE CAN CHECK THE CULVERT ELEVATION CORRECTLY. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/04/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/27/2022 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR THE DRIVEWAY |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/10/2022 | 10/12/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 10/10/2022 | 10/13/2022 |
| Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/10/2022 | 10/10/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/05/2025 |
| ADJUSTMENT 10% | (¤3.00) | 06/03/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/03/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 06/03/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤87.00 |