I want to search for...

Permit #2025060083

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7035-01060-0150
PATIO/DECK (NO ROOF) : 860 sqft
Total Square Footage: 860 sqft
Block: 01060
Subdivision: 7035 -
Job Phone: 838-684-6512 X9
Location Address: 62 BICKFORD DR
Type: PO - POOL
Issue Date: 06/10/2025
NOC: RECORDED
Applicant name: SAMANTHA JESSICA ALEXANDER
Owner: MARTIN JONOTHAN EVERETT & LACY LEIGH H&W

Address

62 BICKFORD DR

PALM COAST, FL 32137

Lot: 0150
Contracted Stated Job Value: ¤55,000.00
Job Description: swimming pool
Type: CN

Contractor

AFFORDABLE POOLS INC
Status Location Address State License Number Phone
ACTIVE

3438 LONGLEAF ROAD

,

CPC1460092 (Exp: 08/31/2026) 838-684-6512 X9

Sub Contractors

MICHAEL ANTHONY NOMAR
Status Location Address State License Number Phone
ACTIVE

537 JOSIE ST

NEW SYMRNA BEACAH, FL 32168

ER13016145 (Exp: 08/31/2026) 386-402-8046

Inspection History

Type Request Date Result Inspector
POOL FINAL 09/30/2025 FINAL APPROVED KSANDOE
U -UTILITY RESIDENTIAL FINAL 09/29/2025 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/25/2025 APPROVED - AS NOTED GBERTOLA
Note: 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 THIS FINAL SURVEY STILL SHOWS YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY IN REAR ** NEED TO IDENTIFY IF YOU HAVE A DRAINAGE FEATURE THAT MOVES YOUR WATER FROM THE REAR TO FRONT ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan.(1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/8/2025 - PREVIOUS INSPECTION NOTES ** 09/08/25 NEED TO IDENTIFY IF ADJACENT PROPERTIES ARE IMPROVED OR VACANT ** NEED THE FINISHED FLOOR ELEVATIONS OF ADJACENT PROPERTIES ON ALL IMPROVED PROPERTIES ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16
ROW FIELD SURVEY /GRADING CERTIFICATION 09/25/2025 APPROVED - AS NOTED GBERTOLA
Note: Inspector Notes from Inspection 9463 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 THIS FINAL SURVEY STILL SHOWS YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY IN REAR ** NEED TO IDENTIFY IF YOU HAVE A DRAINAGE FEATURE THAT MOVES YOUR WATER FROM THE REAR TO FRONT ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan.(1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/8/2025 - PREVIOUS INSPECTION NOTES ** 09/08/25 NEED TO IDENTIFY IF ADJACENT PROPERTIES ARE IMPROVED OR VACANT ** NEED THE FINISHED FLOOR ELEVATIONS OF ADJACENT PROPERTIES ON ALL IMPROVED PROPERTIES ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/25/25= 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/15/25=I spoke to the homeowner and explained that they need to create a berm at the end of the property line, which should be at least 1 foot wide and 7 inches high, compacted and sodded.Per GBertola
ROW - FINAL INSPECTION 09/25/2025 APPROVED GBERTOLA
Note: Inspector Notes from Inspection 9465 Inspector Notes from Inspection 9463 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 THIS FINAL SURVEY STILL SHOWS YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY IN REAR ** NEED TO IDENTIFY IF YOU HAVE A DRAINAGE FEATURE THAT MOVES YOUR WATER FROM THE REAR TO FRONT ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan.(1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/8/2025 - PREVIOUS INSPECTION NOTES ** 09/08/25 NEED TO IDENTIFY IF ADJACENT PROPERTIES ARE IMPROVED OR VACANT ** NEED THE FINISHED FLOOR ELEVATIONS OF ADJACENT PROPERTIES ON ALL IMPROVED PROPERTIES ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/25/25= 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/15/25=I spoke to the homeowner and explained that they need to create a berm at the end of the property line, which should be at least 1 foot wide and 7 inches high, compacted and sodded.Per GBertola 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/12/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/12/25 THIS FINAL SURVEY STILL SHOWS YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY IN REAR ** NEED TO IDENTIFY IF YOU HAVE A DRAINAGE FEATURE THAT MOVES YOUR WATER FROM THE REAR TO FRONT ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan.(1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/8/2025 - PREVIOUS INSPECTION NOTES ** 09/08/25 NEED TO IDENTIFY IF ADJACENT PROPERTIES ARE IMPROVED OR VACANT ** NEED THE FINISHED FLOOR ELEVATIONS OF ADJACENT PROPERTIES ON ALL IMPROVED PROPERTIES ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/08/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/08/25 NEED TO IDENTIFY IF ADJACENT PROPERTIES ARE IMPROVED OR VACANT ** NEED THE FINISHED FLOOR ELEVATIONS OF ADJACENT PROPERTIES ON ALL IMPROVED PROPERTIES ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16
ELECTRIC AND ALARM 08/20/2025 APPROVED CVANSTRAHLEN
POOL DECK 07/23/2025 APPROVED FWILLIS
STEEL AND GROUND 06/25/2025 APPROVED MCONTRYMAN
Note: 6/23/2025 - PREVIOUS INSPECTION NOTES 6/23/25 Previous note needs to be rectified 2. No termite protection card/sheet on site FBC [A] 105.11 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25 1. Left side ground wire not attached to rebar 2. No termite protection card/sheet on site 3. Deep end filled with water. Could not verify rebar ties or sub base
STEEL AND GROUND 06/23/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 6/23/25 Previous note needs to be rectified 2. No termite protection card/sheet on site FBC [A] 105.11 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25 1. Left side ground wire not attached to rebar 2. No termite protection card/sheet on site 3. Deep end filled with water. Could not verify rebar ties or sub base
STEEL AND GROUND 06/20/2025 Disapproved - NO FEE MCONTRYMAN
Note: 6/20/25 1. Left side ground wire not attached to rebar 2. No termite protection card/sheet on site 3. Deep end filled with water. Could not verify rebar ties or sub base

Review History

Department Status Date In Date Out
BADMIN INFORMATION 09/10/2025 09/10/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME FILE NAME TO FINAL SURVEY.PDF
ZON COMPLETE 06/09/2025 06/09/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 06/09/2025 06/10/2025
Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM
BFLOOD CANCEL 06/03/2025 06/05/2025
BLD COMPLETE 06/03/2025 06/05/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 06/03/2025 06/05/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 06/03/2025 06/05/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/03/2025 06/04/2025
Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM
ZON HOLD 06/03/2025 06/03/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Pool must be fully enclosed with a fence or screen enclosure Existing fences are shown but the fence has to enclose the pool. Have owners do a fence acknowledgment for the fencing they are installing on their property then show it on your proposed site plan for review.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤25.50) 06/10/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/10/2025
INSPECTION- POOL ¤160.00 06/10/2025
PLAN REVIEW - RESIDENTIAL ¤65.00 06/10/2025
SURCHARGE FS 533.721 ¤2.30 06/10/2025
SURCHARGE - FS 468.631 ¤3.44 06/10/2025
SW ENG INSPECTION 40 ¤40.00 06/10/2025
SW ENG - REVIEW 20 ¤20.00 06/10/2025
SITE PLAN 30 ¤30.00 06/10/2025
Fees Total Due: ¤0.00 Total Paid: ¤325.24