I want to search for...
Permit #2025060083
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7035-01060-0150 |
| PATIO/DECK (NO ROOF) : 860 sqft |
| Total Square Footage: 860 sqft |
| Block: 01060 |
| Subdivision: 7035 - |
| Job Phone: 838-684-6512 X9 |
| Location Address: 62 BICKFORD DR |
| Type: PO - POOL |
| Issue Date: 06/10/2025 |
| NOC: RECORDED |
| Applicant name: SAMANTHA JESSICA ALEXANDER |
| Owner: MARTIN JONOTHAN EVERETT & LACY LEIGH H&W |
|
Address 62 BICKFORD DR PALM COAST, FL 32137 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤55,000.00 |
| Job Description: swimming pool |
| Type: CN |
Contractor
AFFORDABLE POOLS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3438 LONGLEAF ROAD , |
CPC1460092 (Exp: 08/31/2026) | 838-684-6512 X9 |
Sub Contractors
MICHAEL ANTHONY NOMAR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
537 JOSIE ST NEW SYMRNA BEACAH, FL 32168 |
ER13016145 (Exp: 08/31/2026) | 386-402-8046 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 09/30/2025 | FINAL APPROVED | KSANDOE |
| U -UTILITY RESIDENTIAL FINAL | 09/29/2025 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/25/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 THIS FINAL SURVEY STILL SHOWS YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY IN REAR ** NEED TO IDENTIFY IF YOU HAVE A DRAINAGE FEATURE THAT MOVES YOUR WATER FROM THE REAR TO FRONT ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan.(1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/8/2025 - PREVIOUS INSPECTION NOTES ** 09/08/25 NEED TO IDENTIFY IF ADJACENT PROPERTIES ARE IMPROVED OR VACANT ** NEED THE FINISHED FLOOR ELEVATIONS OF ADJACENT PROPERTIES ON ALL IMPROVED PROPERTIES ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/25/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: Inspector Notes from Inspection 9463 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 THIS FINAL SURVEY STILL SHOWS YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY IN REAR ** NEED TO IDENTIFY IF YOU HAVE A DRAINAGE FEATURE THAT MOVES YOUR WATER FROM THE REAR TO FRONT ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan.(1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/8/2025 - PREVIOUS INSPECTION NOTES ** 09/08/25 NEED TO IDENTIFY IF ADJACENT PROPERTIES ARE IMPROVED OR VACANT ** NEED THE FINISHED FLOOR ELEVATIONS OF ADJACENT PROPERTIES ON ALL IMPROVED PROPERTIES ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/25/25= 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/15/25=I spoke to the homeowner and explained that they need to create a berm at the end of the property line, which should be at least 1 foot wide and 7 inches high, compacted and sodded.Per GBertola | |||
| ROW - FINAL INSPECTION | 09/25/2025 | APPROVED | GBERTOLA |
| Note: Inspector Notes from Inspection 9465 Inspector Notes from Inspection 9463 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 THIS FINAL SURVEY STILL SHOWS YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY IN REAR ** NEED TO IDENTIFY IF YOU HAVE A DRAINAGE FEATURE THAT MOVES YOUR WATER FROM THE REAR TO FRONT ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan.(1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/8/2025 - PREVIOUS INSPECTION NOTES ** 09/08/25 NEED TO IDENTIFY IF ADJACENT PROPERTIES ARE IMPROVED OR VACANT ** NEED THE FINISHED FLOOR ELEVATIONS OF ADJACENT PROPERTIES ON ALL IMPROVED PROPERTIES ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/25/25= 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/15/25=I spoke to the homeowner and explained that they need to create a berm at the end of the property line, which should be at least 1 foot wide and 7 inches high, compacted and sodded.Per GBertola 9/25/25=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET IT IS THE BUILDER'S AND HOMEOWNERS RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/12/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/12/25 THIS FINAL SURVEY STILL SHOWS YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY IN REAR ** NEED TO IDENTIFY IF YOU HAVE A DRAINAGE FEATURE THAT MOVES YOUR WATER FROM THE REAR TO FRONT ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan.(1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 9/8/2025 - PREVIOUS INSPECTION NOTES ** 09/08/25 NEED TO IDENTIFY IF ADJACENT PROPERTIES ARE IMPROVED OR VACANT ** NEED THE FINISHED FLOOR ELEVATIONS OF ADJACENT PROPERTIES ON ALL IMPROVED PROPERTIES ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/08/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/08/25 NEED TO IDENTIFY IF ADJACENT PROPERTIES ARE IMPROVED OR VACANT ** NEED THE FINISHED FLOOR ELEVATIONS OF ADJACENT PROPERTIES ON ALL IMPROVED PROPERTIES ** ACROSS REAR PROPERTY LINE YOU ARE PUSHING YOUR WATER ONTO ADJACENT PROPERTY YOU CAN NOT NEGATIVELY IMPACT ANY IMPROVED ADJACENT PROPERTY ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| ELECTRIC AND ALARM | 08/20/2025 | APPROVED | CVANSTRAHLEN |
| POOL DECK | 07/23/2025 | APPROVED | FWILLIS |
| STEEL AND GROUND | 06/25/2025 | APPROVED | MCONTRYMAN |
| Note: 6/23/2025 - PREVIOUS INSPECTION NOTES 6/23/25 Previous note needs to be rectified 2. No termite protection card/sheet on site FBC [A] 105.11 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25 1. Left side ground wire not attached to rebar 2. No termite protection card/sheet on site 3. Deep end filled with water. Could not verify rebar ties or sub base | |||
| STEEL AND GROUND | 06/23/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 6/23/25 Previous note needs to be rectified 2. No termite protection card/sheet on site FBC [A] 105.11 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25 1. Left side ground wire not attached to rebar 2. No termite protection card/sheet on site 3. Deep end filled with water. Could not verify rebar ties or sub base | |||
| STEEL AND GROUND | 06/20/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 6/20/25 1. Left side ground wire not attached to rebar 2. No termite protection card/sheet on site 3. Deep end filled with water. Could not verify rebar ties or sub base |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 09/10/2025 | 09/10/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME FILE NAME TO FINAL SURVEY.PDF | |||
| ZON | COMPLETE | 06/09/2025 | 06/09/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/09/2025 | 06/10/2025 |
| Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM | |||
| BFLOOD | CANCEL | 06/03/2025 | 06/05/2025 |
| BLD | COMPLETE | 06/03/2025 | 06/05/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/03/2025 | 06/05/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/03/2025 | 06/05/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/03/2025 | 06/04/2025 |
| Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/03/2025 | 06/03/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Pool must be fully enclosed with a fence or screen enclosure Existing fences are shown but the fence has to enclose the pool. Have owners do a fence acknowledgment for the fencing they are installing on their property then show it on your proposed site plan for review. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤25.50) | 06/10/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/10/2025 |
| INSPECTION- POOL | ¤160.00 | 06/10/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 06/10/2025 |
| SURCHARGE FS 533.721 | ¤2.30 | 06/10/2025 |
| SURCHARGE - FS 468.631 | ¤3.44 | 06/10/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 06/10/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/10/2025 |
| SITE PLAN 30 | ¤30.00 | 06/10/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤325.24 |