I want to search for...
Permit #2025060084
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00530-0260 |
| Block: 00530 |
| Subdivision: 7024 - |
| Job Phone: 407-619-9214 |
| Location Address: 24 PROSPECT LN |
| Type: SLRE - SOLAR ELECTRIC - PHOTOVOLTAIC |
| Issue Date: 06/05/2025 |
| NOC: RECORDED |
| Applicant name: PAUL JOYCE |
| Owner: PEREZ MARGARITA M LIFE ESTATE |
|
Address 24 PROSPECT LANE PALM COAST, FL 32164 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤38,724.00 |
| Job Description: solar system roof mounted |
| Type: CN |
Contractor
SUNRUN INSTALLATION SERVICES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1000 GILLS DR STE 200 ORLANDO, FL 32824 |
EC13007964 (Exp: 08/31/2026) | 855-478-6786 |
Inspection History
| Type | Request Date | Result | Inspector |
| SOLAR ELECTRIC FINAL | 09/11/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/11/2025 10:18:37 AM *** 8/26/2025 - PREVIOUS INSPECTION NOTES please fix item from previous inspection ,not lock requiered , need barrier on the inside of the box top on feed wires coming in 1). Exterior disconnect requires service entry barriers over feed side conductors. NEC 230.62 (B) / 110.27(A)(1) 8/20/2025 - PREVIOUS INSPECTION NOTES 8/20/25: NO CHANGE FROM PREVIOUS INSPECTION. PLEASE DO NOT SCHEDULE THE RE-INSPECTION UNTIL A COMPANY REPRESENTATIVE VISUALLY VERIFIES THAT THE DEFICIENCY IS RESOLVED TO AVOID WASTING CITY RESOURCES AND TIME. 8/11/2025 - PREVIOUS INSPECTION NOTES 8/11/25: Previously listed deficiency from 1st inspection on 6/20/25 remains unresolved. 1). Exterior disconnect requires service entry barriers over feed side conductors. NEC 230.62 (B) / 110.27(A)(1) and (2) ----------- (NOTE: Main disconnect inside garage is not within line of sight.) (Accidental contact prevention >NEC 230.62 (B) / 110.27(A)(1) and (2)) 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: This inspection will need to be re-scheduled. Could not perform inspection today due to unforseen circumstances. Contact inspector Robert Sims directly with any questions. 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25: 1). Exterior disconnect requires service entry barriers over feed side conductors. Main disconnect inside garage is not within line of sight. NEC 240.40/ 690.13(A) | |||
| SOLAR ELECTRIC FINAL | 08/26/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: please fix item from previous inspection ,not lock requiered , need barrier on the inside of the box top on feed wires coming in 1). Exterior disconnect requires service entry barriers over feed side conductors. NEC 230.62 (B) / 110.27(A)(1) 8/20/2025 - PREVIOUS INSPECTION NOTES 8/20/25: NO CHANGE FROM PREVIOUS INSPECTION. PLEASE DO NOT SCHEDULE THE RE-INSPECTION UNTIL A COMPANY REPRESENTATIVE VISUALLY VERIFIES THAT THE DEFICIENCY IS RESOLVED TO AVOID WASTING CITY RESOURCES AND TIME. 8/11/2025 - PREVIOUS INSPECTION NOTES 8/11/25: Previously listed deficiency from 1st inspection on 6/20/25 remains unresolved. 1). Exterior disconnect requires service entry barriers over feed side conductors. NEC 230.62 (B) / 110.27(A)(1) and (2) ----------- (NOTE: Main disconnect inside garage is not within line of sight.) (Accidental contact prevention >NEC 230.62 (B) / 110.27(A)(1) and (2)) 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: This inspection will need to be re-scheduled. Could not perform inspection today due to unforseen circumstances. Contact inspector Robert Sims directly with any questions. 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25: 1). Exterior disconnect requires service entry barriers over feed side conductors. Main disconnect inside garage is not within line of sight. NEC 240.40/ 690.13(A) | |||
| SOLAR ELECTRIC FINAL | 08/20/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/20/2025 1:58:24 PM *** 8/20/25: NO CHANGE FROM PREVIOUS INSPECTION. PLEASE DO NOT SCHEDULE THE RE-INSPECTION UNTIL A COMPANY REPRESENTATIVE VISUALLY VERIFIES THAT THE DEFICIENCY IS RESOLVED TO AVOID WASTING CITY RESOURCES AND TIME. 8/11/2025 - PREVIOUS INSPECTION NOTES 8/11/25: Previously listed deficiency from 1st inspection on 6/20/25 remains unresolved. 1). Exterior disconnect requires service entry barriers over feed side conductors. NEC 230.62 (B) / 110.27(A)(1) and (2) ----------- (NOTE: Main disconnect inside garage is not within line of sight.) (Accidental contact prevention >NEC 230.62 (B) / 110.27(A)(1) and (2)) 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: This inspection will need to be re-scheduled. Could not perform inspection today due to unforseen circumstances. Contact inspector Robert Sims directly with any questions. 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25: 1). Exterior disconnect requires service entry barriers over feed side conductors. Main disconnect inside garage is not within line of sight. NEC 240.40/ 690.13(A) | |||
| SOLAR ELECTRIC FINAL | 08/11/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/11/2025 11:43:03 AM *** 8/11/25: Previously listed deficiency from 1st inspection on 6/20/25 remains unresolved. 1). Exterior disconnect requires service entry barriers over feed side conductors. NEC 230.62 (B) / 110.27(A)(1) and (2) ----------- (NOTE: Main disconnect inside garage is not within line of sight.) (Accidental contact prevention >NEC 230.62 (B) / 110.27(A)(1) and (2)) 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: This inspection will need to be re-scheduled. Could not perform inspection today due to unforseen circumstances. Contact inspector Robert Sims directly with any questions. 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25: 1). Exterior disconnect requires service entry barriers over feed side conductors. Main disconnect inside garage is not within line of sight. NEC 240.40/ 690.13(A) | |||
| SOLAR ELECTRIC FINAL | 08/08/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/8/2025 11:30:39 AM *** 8/8/25: This inspection will need to be re-scheduled. Could not perform inspection today due to unforseen circumstances. Contact inspector Robert Sims directly with any questions. 6/20/2025 - PREVIOUS INSPECTION NOTES 6/20/25: 1). Exterior disconnect requires service entry barriers over feed side conductors. Main disconnect inside garage is not within line of sight. NEC 240.40/ 690.13(A) | |||
| SOLAR ELECTRIC FINAL | 06/20/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/20/2025 12:00:05 PM *** 6/20/25: 1). Exterior disconnect requires service entry barriers over feed side conductors. Main disconnect inside garage is not within line of sight. NEC 240.40/ 690.13(A) |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/03/2025 | 06/03/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/03/2025 | 06/03/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/10/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/25/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/19/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/06/2025 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/05/2025 |
| SURCHARGE - FS 468.631 | ¤2.73 | 06/05/2025 |
| ADJUSTMENT 10% | (¤20.23) | 06/05/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/05/2025 |
| INSPECTION - RESIDENTIAL | ¤107.25 | 06/05/2025 |
| SOLAR PLAN REVIEW | ¤65.00 | 06/05/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤346.75 |