I want to search for...

Permit #2025060104

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-01020-0120
CONDITIONED SPACE: 1873 sqft
GARAGE: 759 sqft
OPENED PORCH (WITH ROOF) : 249 sqft
Total Square Footage: 2881 sqft
Block: 01020
Subdivision: -
Job Phone: 352-433-8382
Location Address: 27 SEA BREEZE TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/18/2025
NOC: RECORDED
Applicant name: ALFREDO E SCHEER
Owner: ESTELA SPECS 2 LLC

Address

2601 S BAYSHORE DR

COCONUT GROVE, FL 33133

Address

18TH FLOOR

COCONUT GROVE, FL 33133

Lot: 0120
Contracted Stated Job Value: ¤175,000.00
Job Description: Single Family Residence
Type: CN

Contractor

ESTELA LIVING LLC
Status Location Address State License Number Phone
ACTIVE

237 S. DIXIE HWY, 4TH FLOOR

CORAL GABLES, FL 33133

CGC1534535 (Exp: 08/31/2026) 352-433-8382

Sub Contractors

JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/31/2025 FINAL APPROVED BTAYLOR
Note: 12/30/2025 - PREVIOUS INSPECTION NOTES
U -UTILITY RESIDENTIAL FINAL 12/31/2025 FINAL APPROVED BHAINES
Note: Inspector Notes from Inspection 9035 No CC, No IRR
ROW - STORMWATER FINAL 12/30/2025 APPROVED - AS NOTED FSLADISH
Note: 12/30/25 AS STATED TO DOUG CM THE LEFT SIDE HAS A SMALL AREA THAT HAS BLOWN OUT AND NEEDS REPAIR AS WELL AS SHORING UP THE BACKSIDE OF THE SOD ON LEFT PROPERTY LINE. AS THIS IS MINOR REQUIRED CORRECTIONS AS A COURTESY SO HE MAY CLOSE I AM APPROVING AS NOTED THAT HE WILL MAKE CORRECTIONS IMMEDIATELY AND THAT ANY CHANGE IN THE ELEVATION OF THE SWALE ON LEFT SIDE DRAINAGE WILL BE THE RESPOSIBILITY OF BUILDER/HOMEOWNER TO MAINTAIN AT CURRENT ELEVATION INDICATED ON SURVEY FROM THIS INSPECTION FORWARD. IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/30/2025 APPROVED FSLADISH
Note: 12/30/25 ELEVATION SHOTS NOW SHOWING MEETING MINIMUM COPC STANDARS ON THIS SURVEY. _________________________________________________________________________________________________________________________________ 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25 THE SURVEY SHOWS ALL DRAINAGE COMING OFF LEFT SIDE GOING ONTO ADJOINING PROPERTY. SPOKE WITH DOUG AND LET HIM KNOW EVEN THOUGH IT APPEARS IN THE FIELD TO COME TO A COMMON SWALE ON BOTH SIDES THAT THE ELEVATION SHOTS WILL NEED TO REFLECT THAT. PHOTO ENCLOSED. Note to inspector: There is a stemwall on left side of the foundation and the right side of garage. Refer to SD1 and S3 in attachments. If there are any questions call Rodney.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/30/2025 APPROVED FSLADISH
Note: 11/30/25 REQUIRED CORRECTIONS ON LEFT SIDE PROPERTY LINE DRAINAGE CONVEYANCE PER GABE AND RODNEY COMPLETED AT THE TIME OF THIS INSPECTION.
BLD - BUILDING FINAL 12/30/2025 CANCELLED BY APPLICANT BTAYLOR
U-CROSS CONNECTION 12/30/2025 APPROVED - AS NOTED BHAINES
Note: No CC, No IRR
ROW - FINAL APRON (AFTER POUR) 12/30/2025 APPROVED FSLADISH
Note: 12/30/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/23/2025 Disapproved - NO FEE FSLADISH
Note: 12/23/25 THE SURVEY SHOWS ALL DRAINAGE COMING OFF LEFT SIDE GOING ONTO ADJOINING PROPERTY. SPOKE WITH DOUG AND LET HIM KNOW EVEN THOUGH IT APPEARS IN THE FIELD TO COME TO A COMMON SWALE ON BOTH SIDES THAT THE ELEVATION SHOTS WILL NEED TO REFLECT THAT. PHOTO ENCLOSED. Note to inspector: There is a stemwall on left side of the foundation and the right side of garage. Refer to SD1 and S3 in attachments. If there are any questions call Rodney.
GRAVITY SEWER TEST 12/11/2025 APPROVED BTAYLOR
SEWER TIE IN 12/11/2025 APPROVED MCONTRYMAN
ROW- PRE-APRON (PRE-POUR) 12/10/2025 APPROVED RRICKS
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9470 9/30/25 AT THE TIME OF THIS INSPECTION SITE MEETS COPC MINIMUM STANDARDS FOR RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE REQUIREMENTS. BUILDER IS RESPONSIBLE FOR MAINTAINING COSTRUCTION SITE EROSION CONTROL AND KEEPING SWALE OPEN AND POSITIVELY FLOWING DURING THE ENTIRE CONSTRUCTION PROCESS. I WILL MONITOR THIS SITE FOR CONTINUED COMPLIANCE. Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25 SPOKE WITH CM DOUG ON 9/24 AND HE INDICATED THAT THE SILT FENCE WOULD BE INSTALLED ACROSS THE FRONT AND A TEMPORARY CULVERT WOULD BE INSTALLED ON 9/25/25. NIETHER IS COMPLETED AT THE TIME OF THIS INSPECTION. I HAVE TEXTED HIM THIS INFORMATION AND THAT WITH A POSSIBLE STORM IN OUR AREA THIS WEEKEND IT IS IMPERATIVE TO HAVE THESE CORRECTIONS COMPLETED. I WILL BE BACK ON 9/30 FOR COMPLIACE REINSPECTION. AS A ONE TIME COURTESY SEEING HOW HE REACHED OUT AND THE SWALE IS OPEN TO FLOW AT THE TIME OF THIS INSPECTION I AM GOING TO DISAPPROVE WITH NO FEE. _________________________________________________________________________________________________________________________ 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 SPOKE DOUG WHO ASKED TO HAVE UNTIL TOMORROW TO HAVE REQUIRED CORRECTIONS MADE AND TO HAVE ALL RESIDENTIAL CONSTRUCTION ENTRANCE STANDARDS COMPLETED AND MAINTAINED THROUGHOUT CONSTRUCTION PROCESS. I AM RESETTING DRAINAGE INSPECTION FOR 9/26/25 FOR COMPLIANCE CHECK. ________________________________________________________________________________________________________________________ 9/22/2025 - PREVIOUS INSPECTION NOTES 9/22/25 THIS AREA IS STILL NOT IN COMPLIACE WITH COPC RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE STANDARDS. I CA NOT DETERMINE IF THE SLURRY IS CLEANED UP FULLY AT THE TIME OF THIS INSPECTION. YOU HAVE UNTIL TOMORROW TO MAKE REQUIRED CORRECTIONS AND MEET THE COPC MINIMUM STANDARDS. YOU ARE REQUIRED TO HAVE YOUR SILT FENCE REPAIRED/RESET CORRECTLY AND INSTALLED ACROSS FRONT OF PROPERTY WITH THE EXCETION OF DRIVEWAY. ALL TRASH AND CONSTRUCTION DEBRIS AND TRASH NEEDS TO BE PLACED IN THE DUMPSTER. PLEASE USE LINK PROVIDED TO PERUSE REQUIREMENTS IF NECCESSARY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION 9/24/25 AT WHICH TIME A STOP WORK ORDER MAY BE ISSUED IF YOU ARE STILL FOUND TO BE IN NONCOMPLIANCE.. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. 9/18/2025 - PREVIOUS INSPECTION NOTES 9/18/25 YOU HAVE THE ENTIRE COPC SWALE BLOCKED WITH CONTRUCTION MATERIAL. THERE IS NO TEMPORARY PIPE THAT I CAN SEE. YOU HAVE TRASH AND DEBRIS ON THE GROUND ON THE LEFT SIDE WHILE YOUR DUMPSTER IS 40 FEET AWAY. YOU NEED TO HAVE SILT FENCE ACROOS THE FRONT WITH COPC REQUIRED RESIDENTIAL CONSTRUCTION ENTRANCE IN PLACE ASAP. YOU HAVE CONCRETE SURRY RUNOFF ON THR RIGHT SIDE PROPERTY LINE IN THE SWALE. THIS IS CONSIDERED AN ILLICIT DISCHARGE AND NEEDS TO BE CLEANED UP IMMEDIATELY. I WILL BE BACK TOMORROW FOR A COMPLIANCE CHECK FOR SLURRY REMOVAL. YOU HAVE 5 CALANDER DAYS TO REMEDY THIS SITUATION WITH THE EXCEPTION OF THE SLURRY WHICH NEEDS TO BE CLEANED UP IMMEDIATELY OR A WORK STOPPAGE MAY BE INSTITUTED ON THIS PERMIT, SEE PHOTO FOR REFERENCE.
PEP TANK INSTALLATION REQUEST 11/07/2025 APPROVED CBOWERMASTER
ELECTRIC - EARLY POWER 11/07/2025 APPROVED - AS NOTED BTAYLOR
Note: 11-7-25 1. Emailed FPL at 1:13.
LATH/BRICK/ WATER BARRIER 10/14/2025 APPROVED MCONTRYMAN
Note: Inspector Notes from Inspection 2420 10-9-25 1. Still missing steel plugs in electrical panel. Check at insulation. 10/8/2025 - PREVIOUS INSPECTION NOTES 10-8-25 1. Holes in electrical panel need to have steel plugs put in. 2. No 5' head pressure. 3. 5' head pressure is in wrong location. Needs to be at highest fitting in house. 4. Master bathroom exhaust fan duct is falling away from roof decking.
INSULATION 10/14/2025 APPROVED MCONTRYMAN
Note: Inspector Notes from Inspection 2420 10-9-25 1. Still missing steel plugs in electrical panel. Check at insulation. 10/8/2025 - PREVIOUS INSPECTION NOTES 10-8-25 1. Holes in electrical panel need to have steel plugs put in. 2. No 5' head pressure. 3. 5' head pressure is in wrong location. Needs to be at highest fitting in house. 4. Master bathroom exhaust fan duct is falling away from roof decking.
ALL ROUGH 10/09/2025 APPROVED - AS NOTED BTAYLOR
Note: 10-9-25 1. Still missing steel plugs in electrical panel. Check at insulation. 10/8/2025 - PREVIOUS INSPECTION NOTES 10-8-25 1. Holes in electrical panel need to have steel plugs put in. 2. No 5' head pressure. 3. 5' head pressure is in wrong location. Needs to be at highest fitting in house. 4. Master bathroom exhaust fan duct is falling away from roof decking.
ALL ROUGH 10/08/2025 Disapproved - NO FEE BTAYLOR
Note: 10-8-25 1. Holes in electrical panel need to have steel plugs put in. 2. No 5' head pressure. 3. 5' head pressure is in wrong location. Needs to be at highest fitting in house. 4. Master bathroom exhaust fan duct is falling away from roof decking.
WALL SHEATHING 10/07/2025 APPROVED BTAYLOR
ROOF VALLEY & METAL 09/30/2025 APPROVED BTAYLOR
ROW - DRAINAGE 09/30/2025 APPROVED - AS NOTED FSLADISH
Note: 9/30/25 AT THE TIME OF THIS INSPECTION SITE MEETS COPC MINIMUM STANDARDS FOR RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE REQUIREMENTS. BUILDER IS RESPONSIBLE FOR MAINTAINING COSTRUCTION SITE EROSION CONTROL AND KEEPING SWALE OPEN AND POSITIVELY FLOWING DURING THE ENTIRE CONSTRUCTION PROCESS. I WILL MONITOR THIS SITE FOR CONTINUED COMPLIANCE. Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25 SPOKE WITH CM DOUG ON 9/24 AND HE INDICATED THAT THE SILT FENCE WOULD BE INSTALLED ACROSS THE FRONT AND A TEMPORARY CULVERT WOULD BE INSTALLED ON 9/25/25. NIETHER IS COMPLETED AT THE TIME OF THIS INSPECTION. I HAVE TEXTED HIM THIS INFORMATION AND THAT WITH A POSSIBLE STORM IN OUR AREA THIS WEEKEND IT IS IMPERATIVE TO HAVE THESE CORRECTIONS COMPLETED. I WILL BE BACK ON 9/30 FOR COMPLIACE REINSPECTION. AS A ONE TIME COURTESY SEEING HOW HE REACHED OUT AND THE SWALE IS OPEN TO FLOW AT THE TIME OF THIS INSPECTION I AM GOING TO DISAPPROVE WITH NO FEE. _________________________________________________________________________________________________________________________ 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 SPOKE DOUG WHO ASKED TO HAVE UNTIL TOMORROW TO HAVE REQUIRED CORRECTIONS MADE AND TO HAVE ALL RESIDENTIAL CONSTRUCTION ENTRANCE STANDARDS COMPLETED AND MAINTAINED THROUGHOUT CONSTRUCTION PROCESS. I AM RESETTING DRAINAGE INSPECTION FOR 9/26/25 FOR COMPLIANCE CHECK. ________________________________________________________________________________________________________________________ 9/22/2025 - PREVIOUS INSPECTION NOTES 9/22/25 THIS AREA IS STILL NOT IN COMPLIACE WITH COPC RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE STANDARDS. I CA NOT DETERMINE IF THE SLURRY IS CLEANED UP FULLY AT THE TIME OF THIS INSPECTION. YOU HAVE UNTIL TOMORROW TO MAKE REQUIRED CORRECTIONS AND MEET THE COPC MINIMUM STANDARDS. YOU ARE REQUIRED TO HAVE YOUR SILT FENCE REPAIRED/RESET CORRECTLY AND INSTALLED ACROSS FRONT OF PROPERTY WITH THE EXCETION OF DRIVEWAY. ALL TRASH AND CONSTRUCTION DEBRIS AND TRASH NEEDS TO BE PLACED IN THE DUMPSTER. PLEASE USE LINK PROVIDED TO PERUSE REQUIREMENTS IF NECCESSARY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION 9/24/25 AT WHICH TIME A STOP WORK ORDER MAY BE ISSUED IF YOU ARE STILL FOUND TO BE IN NONCOMPLIANCE.. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. 9/18/2025 - PREVIOUS INSPECTION NOTES 9/18/25 YOU HAVE THE ENTIRE COPC SWALE BLOCKED WITH CONTRUCTION MATERIAL. THERE IS NO TEMPORARY PIPE THAT I CAN SEE. YOU HAVE TRASH AND DEBRIS ON THE GROUND ON THE LEFT SIDE WHILE YOUR DUMPSTER IS 40 FEET AWAY. YOU NEED TO HAVE SILT FENCE ACROOS THE FRONT WITH COPC REQUIRED RESIDENTIAL CONSTRUCTION ENTRANCE IN PLACE ASAP. YOU HAVE CONCRETE SURRY RUNOFF ON THR RIGHT SIDE PROPERTY LINE IN THE SWALE. THIS IS CONSIDERED AN ILLICIT DISCHARGE AND NEEDS TO BE CLEANED UP IMMEDIATELY. I WILL BE BACK TOMORROW FOR A COMPLIANCE CHECK FOR SLURRY REMOVAL. YOU HAVE 5 CALANDER DAYS TO REMEDY THIS SITUATION WITH THE EXCEPTION OF THE SLURRY WHICH NEEDS TO BE CLEANED UP IMMEDIATELY OR A WORK STOPPAGE MAY BE INSTITUTED ON THIS PERMIT, SEE PHOTO FOR REFERENCE.
ROW - DRAINAGE 09/26/2025 Disapproved - NO FEE FSLADISH
Note: 9/26/25 SPOKE WITH CM DOUG ON 9/24 AND HE INDICATED THAT THE SILT FENCE WOULD BE INSTALLED ACROSS THE FRONT AND A TEMPORARY CULVERT WOULD BE INSTALLED ON 9/25/25. NIETHER IS COMPLETED AT THE TIME OF THIS INSPECTION. I HAVE TEXTED HIM THIS INFORMATION AND THAT WITH A POSSIBLE STORM IN OUR AREA THIS WEEKEND IT IS IMPERATIVE TO HAVE THESE CORRECTIONS COMPLETED. I WILL BE BACK ON 9/30 FOR COMPLIACE REINSPECTION. AS A ONE TIME COURTESY SEEING HOW HE REACHED OUT AND THE SWALE IS OPEN TO FLOW AT THE TIME OF THIS INSPECTION I AM GOING TO DISAPPROVE WITH NO FEE. _________________________________________________________________________________________________________________________ 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 SPOKE DOUG WHO ASKED TO HAVE UNTIL TOMORROW TO HAVE REQUIRED CORRECTIONS MADE AND TO HAVE ALL RESIDENTIAL CONSTRUCTION ENTRANCE STANDARDS COMPLETED AND MAINTAINED THROUGHOUT CONSTRUCTION PROCESS. I AM RESETTING DRAINAGE INSPECTION FOR 9/26/25 FOR COMPLIANCE CHECK. ________________________________________________________________________________________________________________________ 9/22/2025 - PREVIOUS INSPECTION NOTES 9/22/25 THIS AREA IS STILL NOT IN COMPLIACE WITH COPC RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE STANDARDS. I CA NOT DETERMINE IF THE SLURRY IS CLEANED UP FULLY AT THE TIME OF THIS INSPECTION. YOU HAVE UNTIL TOMORROW TO MAKE REQUIRED CORRECTIONS AND MEET THE COPC MINIMUM STANDARDS. YOU ARE REQUIRED TO HAVE YOUR SILT FENCE REPAIRED/RESET CORRECTLY AND INSTALLED ACROSS FRONT OF PROPERTY WITH THE EXCETION OF DRIVEWAY. ALL TRASH AND CONSTRUCTION DEBRIS AND TRASH NEEDS TO BE PLACED IN THE DUMPSTER. PLEASE USE LINK PROVIDED TO PERUSE REQUIREMENTS IF NECCESSARY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION 9/24/25 AT WHICH TIME A STOP WORK ORDER MAY BE ISSUED IF YOU ARE STILL FOUND TO BE IN NONCOMPLIANCE.. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. 9/18/2025 - PREVIOUS INSPECTION NOTES 9/18/25 YOU HAVE THE ENTIRE COPC SWALE BLOCKED WITH CONTRUCTION MATERIAL. THERE IS NO TEMPORARY PIPE THAT I CAN SEE. YOU HAVE TRASH AND DEBRIS ON THE GROUND ON THE LEFT SIDE WHILE YOUR DUMPSTER IS 40 FEET AWAY. YOU NEED TO HAVE SILT FENCE ACROOS THE FRONT WITH COPC REQUIRED RESIDENTIAL CONSTRUCTION ENTRANCE IN PLACE ASAP. YOU HAVE CONCRETE SURRY RUNOFF ON THR RIGHT SIDE PROPERTY LINE IN THE SWALE. THIS IS CONSIDERED AN ILLICIT DISCHARGE AND NEEDS TO BE CLEANED UP IMMEDIATELY. I WILL BE BACK TOMORROW FOR A COMPLIANCE CHECK FOR SLURRY REMOVAL. YOU HAVE 5 CALANDER DAYS TO REMEDY THIS SITUATION WITH THE EXCEPTION OF THE SLURRY WHICH NEEDS TO BE CLEANED UP IMMEDIATELY OR A WORK STOPPAGE MAY BE INSTITUTED ON THIS PERMIT, SEE PHOTO FOR REFERENCE.
ROW - DRAINAGE 09/24/2025 Disapproved - NO FEE FSLADISH
Note: 9/24/25 SPOKE DOUG WHO ASKED TO HAVE UNTIL TOMORROW TO HAVE REQUIRED CORRECTIONS MADE AND TO HAVE ALL RESIDENTIAL CONSTRUCTION ENTRANCE STANDARDS COMPLETED AND MAINTAINED THROUGHOUT CONSTRUCTION PROCESS. I AM RESETTING DRAINAGE INSPECTION FOR 9/26/25 FOR COMPLIANCE CHECK. ________________________________________________________________________________________________________________________ 9/22/2025 - PREVIOUS INSPECTION NOTES 9/22/25 THIS AREA IS STILL NOT IN COMPLIACE WITH COPC RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE STANDARDS. I CA NOT DETERMINE IF THE SLURRY IS CLEANED UP FULLY AT THE TIME OF THIS INSPECTION. YOU HAVE UNTIL TOMORROW TO MAKE REQUIRED CORRECTIONS AND MEET THE COPC MINIMUM STANDARDS. YOU ARE REQUIRED TO HAVE YOUR SILT FENCE REPAIRED/RESET CORRECTLY AND INSTALLED ACROSS FRONT OF PROPERTY WITH THE EXCETION OF DRIVEWAY. ALL TRASH AND CONSTRUCTION DEBRIS AND TRASH NEEDS TO BE PLACED IN THE DUMPSTER. PLEASE USE LINK PROVIDED TO PERUSE REQUIREMENTS IF NECCESSARY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION 9/24/25 AT WHICH TIME A STOP WORK ORDER MAY BE ISSUED IF YOU ARE STILL FOUND TO BE IN NONCOMPLIANCE.. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. 9/18/2025 - PREVIOUS INSPECTION NOTES 9/18/25 YOU HAVE THE ENTIRE COPC SWALE BLOCKED WITH CONTRUCTION MATERIAL. THERE IS NO TEMPORARY PIPE THAT I CAN SEE. YOU HAVE TRASH AND DEBRIS ON THE GROUND ON THE LEFT SIDE WHILE YOUR DUMPSTER IS 40 FEET AWAY. YOU NEED TO HAVE SILT FENCE ACROOS THE FRONT WITH COPC REQUIRED RESIDENTIAL CONSTRUCTION ENTRANCE IN PLACE ASAP. YOU HAVE CONCRETE SURRY RUNOFF ON THR RIGHT SIDE PROPERTY LINE IN THE SWALE. THIS IS CONSIDERED AN ILLICIT DISCHARGE AND NEEDS TO BE CLEANED UP IMMEDIATELY. I WILL BE BACK TOMORROW FOR A COMPLIANCE CHECK FOR SLURRY REMOVAL. YOU HAVE 5 CALANDER DAYS TO REMEDY THIS SITUATION WITH THE EXCEPTION OF THE SLURRY WHICH NEEDS TO BE CLEANED UP IMMEDIATELY OR A WORK STOPPAGE MAY BE INSTITUTED ON THIS PERMIT, SEE PHOTO FOR REFERENCE.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/24/2025 APPROVED MCONTRYMAN
Note: Inspector Notes from Inspection 2340 9-16-25 1. Need to clean up job box.
ROW - DRAINAGE 09/22/2025 Disapproved - NO FEE FSLADISH
Note: 9/22/25 THIS AREA IS STILL NOT IN COMPLIACE WITH COPC RESIDENTIAL DRIVEWAY CONSTRUCTION ENTRANCE STANDARDS. I CA NOT DETERMINE IF THE SLURRY IS CLEANED UP FULLY AT THE TIME OF THIS INSPECTION. YOU HAVE UNTIL TOMORROW TO MAKE REQUIRED CORRECTIONS AND MEET THE COPC MINIMUM STANDARDS. YOU ARE REQUIRED TO HAVE YOUR SILT FENCE REPAIRED/RESET CORRECTLY AND INSTALLED ACROSS FRONT OF PROPERTY WITH THE EXCETION OF DRIVEWAY. ALL TRASH AND CONSTRUCTION DEBRIS AND TRASH NEEDS TO BE PLACED IN THE DUMPSTER. PLEASE USE LINK PROVIDED TO PERUSE REQUIREMENTS IF NECCESSARY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION 9/24/25 AT WHICH TIME A STOP WORK ORDER MAY BE ISSUED IF YOU ARE STILL FOUND TO BE IN NONCOMPLIANCE.. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. 9/18/2025 - PREVIOUS INSPECTION NOTES 9/18/25 YOU HAVE THE ENTIRE COPC SWALE BLOCKED WITH CONTRUCTION MATERIAL. THERE IS NO TEMPORARY PIPE THAT I CAN SEE. YOU HAVE TRASH AND DEBRIS ON THE GROUND ON THE LEFT SIDE WHILE YOUR DUMPSTER IS 40 FEET AWAY. YOU NEED TO HAVE SILT FENCE ACROOS THE FRONT WITH COPC REQUIRED RESIDENTIAL CONSTRUCTION ENTRANCE IN PLACE ASAP. YOU HAVE CONCRETE SURRY RUNOFF ON THR RIGHT SIDE PROPERTY LINE IN THE SWALE. THIS IS CONSIDERED AN ILLICIT DISCHARGE AND NEEDS TO BE CLEANED UP IMMEDIATELY. I WILL BE BACK TOMORROW FOR A COMPLIANCE CHECK FOR SLURRY REMOVAL. YOU HAVE 5 CALANDER DAYS TO REMEDY THIS SITUATION WITH THE EXCEPTION OF THE SLURRY WHICH NEEDS TO BE CLEANED UP IMMEDIATELY OR A WORK STOPPAGE MAY BE INSTITUTED ON THIS PERMIT, SEE PHOTO FOR REFERENCE.
ROW - DRAINAGE 09/18/2025 Disapproved - NO FEE FSLADISH
Note: 9/18/25 YOU HAVE THE ENTIRE COPC SWALE BLOCKED WITH CONTRUCTION MATERIAL. THERE IS NO TEMPORARY PIPE THAT I CAN SEE. YOU HAVE TRASH AND DEBRIS ON THE GROUND ON THE LEFT SIDE WHILE YOUR DUMPSTER IS 40 FEET AWAY. YOU NEED TO HAVE SILT FENCE ACROOS THE FRONT WITH COPC REQUIRED RESIDENTIAL CONSTRUCTION ENTRANCE IN PLACE ASAP. YOU HAVE CONCRETE SURRY RUNOFF ON THR RIGHT SIDE PROPERTY LINE IN THE SWALE. THIS IS CONSIDERED AN ILLICIT DISCHARGE AND NEEDS TO BE CLEANED UP IMMEDIATELY. I WILL BE BACK TOMORROW FOR A COMPLIANCE CHECK FOR SLURRY REMOVAL. YOU HAVE 5 CALANDER DAYS TO REMEDY THIS SITUATION WITH THE EXCEPTION OF THE SLURRY WHICH NEEDS TO BE CLEANED UP IMMEDIATELY OR A WORK STOPPAGE MAY BE INSTITUTED ON THIS PERMIT, SEE PHOTO FOR REFERENCE.
TIE BEAM / LINTEL 09/16/2025 APPROVED - AS NOTED BTAYLOR
Note: 9-16-25 1. Need to clean up job box.
MONOLITHIC SLAB 09/05/2025 APPROVED BTAYLOR
Note: 9/4/2025 - PREVIOUS INSPECTION NOTES 9-4-25 1. Back side of garage near water lines there is a cave in. 2. Right side of house past shower there is a cave in.
MONOLITHIC SLAB 09/04/2025 Disapproved - NO FEE BTAYLOR
Note: 9-4-25 1. Back side of garage near water lines there is a cave in. 2. Right side of house past shower there is a cave in.
PLUMBING 1ST ROUGH UNDERGROUND 09/02/2025 APPROVED MGIBSON
Note: 8/28/2025 - PREVIOUS INSPECTION NOTES FBCR P-2503.5 NEEDS 5'HEAD TEST
PLUMBING 1ST ROUGH UNDERGROUND 08/28/2025 Disapproved -FEE REQUIRED MGIBSON
Note: FBCR P-2503.5 NEEDS 5'HEAD TEST
FORMBOARD SURVEY (OFFICE USE ONLY) 08/27/2025 APPROVED PFLANAGAN
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 08/05/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 07/16/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
SW1 COMPLETE 08/27/2025 08/27/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 08/27/2025 08/27/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/19/2025 08/20/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 COMPLETE 08/19/2025 08/27/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Note: There is a stemwall on left side of the foundation and the right side of garage. Refer to SD1 and S3 in attachments.
ZON COMPLETE 08/19/2025 08/19/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 08/04/2025 08/05/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 07/23/2025 07/24/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 06/10/2025 06/17/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ELEC COMPLETE 06/10/2025 06/18/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/10/2025 06/11/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 06/10/2025 06/11/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 06/04/2025 06/25/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 06/03/2025 06/10/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 06/03/2025 06/10/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 06/03/2025 06/10/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 06/03/2025 06/09/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical load calcs.
ENGIN1 COMPLETE 06/03/2025 06/04/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 06/03/2025 06/05/2025
LOCATE COMPLETE 06/03/2025 06/06/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/03/2025 06/05/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 06/03/2025 06/06/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM On the right side on the front property line the 25.10' should be higher then the flow line 26.30' so water is contained to the common swale.
ZON COMPLETE 06/03/2025 06/03/2025
Note: Released By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 12/29/2025
SW ENG - INSPECTION 20 ¤20.00 12/29/2025
REINSPECTION RESIDENTIAL ¤40.00 09/23/2025
SW ENG - INSPECTION 20 ¤20.00 09/23/2025
SW ENG - INSPECTION 20 ¤20.00 09/23/2025
SW ENG - INSPECTION 20 ¤20.00 09/23/2025
WATER- TURN ON ¤50.00 06/18/2025
ADJUSTMENT 10% (¤136.79) 06/18/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/18/2025
INSPECTION - RESIDENTIAL ¤1,042.25 06/18/2025
PLAN REVIEW - RESIDENTIAL ¤295.62 06/18/2025
FC IMPACT FEE EMS ¤62.00 06/18/2025
IMPACT FEE FIRE ¤434.51 06/18/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/18/2025
FC IMPACT FEE LIBRARY ¤268.00 06/18/2025
IMPACT FEE PARKS ¤1,828.01 06/18/2025
IMPACT FEE SCHOOL ¤5,450.00 06/18/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 06/18/2025
PEP TANK INSTALL ¤756.74 06/18/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 06/18/2025
SURCHARGE FS 533.721 ¤12.31 06/18/2025
SURCHARGE - FS 468.631 ¤18.47 06/18/2025
SW ENG - FOUNDATION SURVEY ¤20.00 06/18/2025
SW ENG INSPECTION 80 ¤80.00 06/18/2025
SW ENG PRE APRON ¤30.00 06/18/2025
SW ENG - REVIEW 20 ¤20.00 06/18/2025
SW ENG RES REVIEW 200 ¤200.00 06/18/2025
WATER METER W/ TAP ¤2,326.93 06/18/2025
WASTEWATER PERM INSPECTION ¤80.00 06/18/2025
WASTEWATER PERM REVIEW ¤25.00 06/18/2025
SEWER CAPITAL FACILITY ¤4,415.00 06/18/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 06/18/2025
WATER PERMIT REVIEW ¤25.00 06/18/2025
WATER MAIN EXTENSION IMPACT ¤917.27 06/18/2025
SITE PLAN 30 ¤30.00 06/18/2025
Fees Total Due: ¤0.00 Total Paid: ¤26,729.81