I want to search for...
Permit #2025060128
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00160-0100 |
| CONDITIONED SPACE: 2302 sqft |
| GARAGE: 724 sqft |
| OPENED PORCH (WITH ROOF) : 405 sqft |
| Total Square Footage: 3431 sqft |
| Block: 00160 |
| Subdivision: - |
| Job Phone: 386-237-8427 |
| Location Address: 54 LYNBROOK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/17/2025 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: BRANTLEY SCOTT ROBERT & PAMELA JO H&W |
|
Address 6988 6TH AVE DULUTH, MN 55803 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤450,627.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/26/2026 | Approval - Private Provider | PPROVIDER |
| ROW - FINAL APRON (AFTER POUR) | 02/25/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 02/25/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 02/25/2026 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 No IRR, No CC | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/24/2026 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/24/2026 | APPROVED | TPOLACEK |
| Note: *** NOTES ADDED BY TPOLACEK 2/24/2026 11:08:54 AM *** 02-24-26 TPOLACEK*** PERMIT FOR BROW 2025091149 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 02-24-26 TPOLACEK*** BANK ACROSS REAR OF PROPERTY IS STABILIZED WITH SOD, UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED INSPECTOR NOTE: PLEASE LOOK FOR THE BANK BE STABLE IN THE BACK YARD BY THE CANAL. AFTER TREE STUMP REMOVAL. GBERTOLA PER CARMELO, PER CAROL MINI, TWO MAGNOLIAS NEED TO BE SAVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/02/2026 | APPROVED - AS NOTED | EMADISON |
| Note: ** 02/02/26 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ______________________________________________________________________________________________________________________ 1/29/2026 - PREVIOUS INSPECTION NOTES 01-29-26 TPOLACEK*** DRIVEWAY CULVERT IS SET CORRECLTY HOWEVER, THE FORM BOARDSIN THE ROW DO NOT MATCH RESIDENTIAL CULVERT DETAIL. ROAD SIDE FORM BOARD MUST BE EQUAL TO EXISTING EDGE OF ROAD. MITER FLARE AT THE EDGE OF DRIVE MUST BE 18" TO THE SIDE OF THE CULVERT AND AT THE MIER END OF PIPE 9" TO THE SIDE OF THE PIPE. THERE MUST BE A MINIMUM OF 2" OVER THE OPEN MITER CUT END OF THE PIPE. SEE DETAIL ATTACHED TO PHOTOS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/28/2026 - PREVIOUS INSPECTION NOTES RECIEVED TEXT ASKING TO CANCEL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 01/29/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: 01-29-26 TPOLACEK*** DRIVEWAY CULVERT IS SET CORRECLTY HOWEVER, THE FORM BOARDSIN THE ROW DO NOT MATCH RESIDENTIAL CULVERT DETAIL. ROAD SIDE FORM BOARD MUST BE EQUAL TO EXISTING EDGE OF ROAD. MITER FLARE AT THE EDGE OF DRIVE MUST BE 18" TO THE SIDE OF THE CULVERT AND AT THE MIER END OF PIPE 9" TO THE SIDE OF THE PIPE. THERE MUST BE A MINIMUM OF 2" OVER THE OPEN MITER CUT END OF THE PIPE. SEE DETAIL ATTACHED TO PHOTOS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/28/2026 - PREVIOUS INSPECTION NOTES RECIEVED TEXT ASKING TO CANCEL INSPECTION | |||
| U-CROSS CONNECTION | 01/28/2026 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR, No CC | |||
| ROW- PRE-APRON (PRE-POUR) | 01/28/2026 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: RECIEVED TEXT ASKING TO CANCEL INSPECTION | |||
| ELECTRIC - EARLY POWER | 01/16/2026 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 12/03/2025 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 11/03/2025 | APPROVED | CBOWERMASTER |
| INSULATION | 10/22/2025 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 10/22/2025 | Approval - Private Provider | PPROVIDER |
| Note: 10/16/2025 3:40:09 PM- PREVIOUS INSPECTION NOTES 10/14/2025 8:55:27 AM- PREVIOUS INSPECTION NOTES | |||
| LATH/BRICK/ WATER BARRIER | 10/21/2025 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 10/16/2025 | Disapproved- Private Provider | PPROVIDER |
| Note: 10/14/2025 8:55:27 AM- PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 10/14/2025 | Disapproved- Private Provider | PPROVIDER |
| WALL SHEATHING | 09/12/2025 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/12/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 09/12/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 08/25/2025 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 08/06/2025 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/28/2025 | Approval - Private Provider | PPROVIDER |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 07/25/2025 | APPROVED | RRICKS |
| GRAVITY SEWER TEST | 07/24/2025 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/22/2025 | APPROVED | CPISCITELLI |
| WATER METER INSTALLATION REQUEST | 07/09/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 08/21/2025 | 08/22/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/21/2025 | 08/21/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/25/2025 | 07/25/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/25/2025 | 07/25/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/24/2025 | 07/25/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM -There is a typo of 20.47' on the formboard survey. Please revise and resubmit. - Also please add the dimension of 20' along the front of the home that is missing. | |||
| ZON | COMPLETE | 07/24/2025 | 07/24/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/21/2025 | 07/22/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/10/2025 | 06/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/10/2025 | 06/11/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/10/2025 | 06/11/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/10/2025 | 06/17/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/03/2025 | 06/10/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/03/2025 | 06/10/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/03/2025 | 06/04/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/03/2025 | 06/06/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/03/2025 | 06/06/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/03/2025 | 06/04/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM lot square footage missing on site plan/survey |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤3.00) | 06/17/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/17/2025 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 06/17/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 06/17/2025 |
| IMPACT FEE FIRE | ¤434.51 | 06/17/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/17/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/17/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 06/17/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/17/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 06/17/2025 |
| SURCHARGE FS 533.721 | ¤2.52 | 06/17/2025 |
| SURCHARGE - FS 468.631 | ¤3.78 | 06/17/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/17/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/17/2025 |
| SW ENG PRE APRON | ¤30.00 | 06/17/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/17/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/17/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 06/17/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 06/17/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 06/17/2025 |
| SITE PLAN 30 | ¤30.00 | 06/17/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 06/11/2025 |
| WATER-METER | ¤965.03 | 06/11/2025 |
| WATER- TURN ON | ¤50.00 | 06/11/2025 |
| WATER- TURN ON | ¤50.00 | 06/11/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 06/11/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 06/11/2025 |
| WATER PERMIT INSPECTION | ¤40.00 | 06/11/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 06/11/2025 |
| PEP TANK INSTALL | ¤756.74 | 06/11/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 06/11/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤26,641.28 |