Permit #2025060239

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00740-0150
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00740
Subdivision: -
Job Phone: 239-571-5325
Location Address: 29 POINDEXTER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/24/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES LLC

Address

581 NW MERCANTILE PLACE

PORT SAINT LUCIE, FL 34986

Address

SUITE 106

PORT SAINT LUCIE, FL 34986

Lot: 0150
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 12/12/2025 APPROVED FSLADISH
Note: 12/12/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 12/11/25 UPON WALKING PROPERTY DETERMINED THAT BUILDER WILL NEED TO ADD A SMALL SWALE/BERM IN REAR RIGHT CORNER TO MOVE DRAINAGE AROUND AND FORWARD AS THE WAY THE REAR YARD SLOPES IS FROM LEFT TO RIGHT. GRAYSON INDICATED HE WILL GET IT DONE.
ROW - STORMWATER FINAL 12/12/2025 APPROVED FSLADISH
Note: 12/12/25 REQUIRED SWALE/BERM CORRECTION COMPLETED AT THE TIME OF THIS INSPECTION. DUE TO IT BEING A SMALL AREA,i AM NOT REQUIRING A NEW SURVEY TO BE SUBMITTED. DRAINGE NOW CONFORMS TO MINIMUM COPC STANDARDS. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 12/11/25 UPON WALKING PROPERTY DETERMINED THAT BUILDER WILL NEED TO ADD A SMALL SWALE/BERM IN REAR RIGHT CORNER TO MOVE DRAINAGE AROUND AND FORWARD AS THE WAY THE REAR YARD SLOPES IS FROM LEFT TO RIGHT. GRAYSON INDICATED HE WILL GET IT DONE.
U -UTILITY RESIDENTIAL FINAL 12/12/2025 Disapproved -FEE REQUIRED BWRIGHT
Note: Inspector Notes from Inspection 9035 no irr-no cc No power to PEP TANK
U -UTILITY RESIDENTIAL FINAL 12/12/2025 FINAL APPROVED LFITZGERALD
Note: 12/12/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9035 no irr-no cc No power to PEP TANK
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/11/2025 APPROVED FSLADISH
Note: 12/9/2025 - PREVIOUS INSPECTION NOTES 12-9-25 TPOLACEK*** THE FFE ON THE FORMBOARD SURVEY INDICATES 26.70, FINAL SURVEY INDICATES 26.17 THIS MUST BE CORRECTED. THERE IS A SHOT OF 25.40 IN THE BACK LEFT THAT IS .20 LOW AND WILL TRAP WATER. THERE ARE NO 10' OFF SHOTS IN THE REAR ALONG EASEMENT,
ROW FIELD SURVEY /GRADING CERTIFICATION 12/11/2025 APPROVED - AS NOTED FSLADISH
Note: 12/11/25 UPON WALKING PROPERTY DETERMINED THAT BUILDER WILL NEED TO ADD A SMALL SWALE/BERM IN REAR RIGHT CORNER TO MOVE DRAINAGE AROUND AND FORWARD AS THE WAY THE REAR YARD SLOPES IS FROM LEFT TO RIGHT. GRAYSON INDICATED HE WILL GET IT DONE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/09/2025 Disapproved - NO FEE TPOLACEK
Note: 12-9-25 TPOLACEK*** THE FFE ON THE FORMBOARD SURVEY INDICATES 26.70, FINAL SURVEY INDICATES 26.17 THIS MUST BE CORRECTED. THERE IS A SHOT OF 25.40 IN THE BACK LEFT THAT IS .20 LOW AND WILL TRAP WATER. THERE ARE NO 10' OFF SHOTS IN THE REAR ALONG EASEMENT,
BLD - BUILDING FINAL 12/02/2025 FINAL APPROVED MCONTRYMAN
Note: 11/25/2025 - PREVIOUS INSPECTION NOTES 11/25/25: Cancelled by Applicant via phone at @ 1215. Stated not ready scheduled too early.
BLD - BUILDING FINAL 11/25/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 11/25/2025 12:18:03 PM *** 11/25/25: Cancelled by Applicant via phone at @ 1215. Stated not ready scheduled too early.
ROW- PRE-APRON (PRE-POUR) 11/10/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. Inspector Notes from Inspection 9470 09-29-25 TPOLACEK*** BUILDER WAS OPENING SWALE AT PROPERTY LINE WHILE I WAS CONDUCTING INSPECTION. APPROVING AS NOTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/24/2025 - PREVIOUS INSPECTION NOTES 09-24-25 TPOLACEK*** BUILDER NEEDS TO REESTABLISH TEMPORARY PIPE AND SILT FENCE ACROSS RIGHT SIDE SWALE. 3 DAYS Inspector Notes from Inspection 9470 8/5/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THE DRAINAGE REINSPECTION. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN CONSTRUCTUION SITE TO COPC STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. ______________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES 07/31/25 TPOLACEK*** BUILDER HAS TILL MONDAY 08/04/25 TO COMPLY BEFORE A PRIORITY 1 STATUS IS APPLIED TO PERMIT. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/21/2025 - PREVIOUS INSPECTION NOTES 07/21/25 TPOLACEK*** BUILDER WILL NEED TO INSTALL SILT FENCE ACROSS FRONT LEAVING CONSTRUCTION ENTRANCE OPENING ONLY AND MAKE SURE SWALE IS KEPT OPEN OR INSTALL TEMPORARY CULVERT. 10 DAYS BEFORE REINSPECTION. SEE DETAIL IN PHOTO SECTION.
GRAVITY SEWER TEST 11/10/2025 APPROVED MGIBSON
SEWER TIE IN 11/10/2025 APPROVED MGIBSON
ELECTRIC - EARLY POWER 10/29/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/29/2025 11:50:35 AM *** 5/29/25: FPL emailed to release power.
PEP TANK INSTALLATION REQUEST 10/16/2025 APPROVED CBOWERMASTER
INSULATION 10/02/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/2/2025 2:53:14 PM ***
ROW - DRAINAGE 09/29/2025 APPROVED - AS NOTED TPOLACEK
Note: 09-29-25 TPOLACEK*** BUILDER WAS OPENING SWALE AT PROPERTY LINE WHILE I WAS CONDUCTING INSPECTION. APPROVING AS NOTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/24/2025 - PREVIOUS INSPECTION NOTES 09-24-25 TPOLACEK*** BUILDER NEEDS TO REESTABLISH TEMPORARY PIPE AND SILT FENCE ACROSS RIGHT SIDE SWALE. 3 DAYS Inspector Notes from Inspection 9470 8/5/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THE DRAINAGE REINSPECTION. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN CONSTRUCTUION SITE TO COPC STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. ______________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES 07/31/25 TPOLACEK*** BUILDER HAS TILL MONDAY 08/04/25 TO COMPLY BEFORE A PRIORITY 1 STATUS IS APPLIED TO PERMIT. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/21/2025 - PREVIOUS INSPECTION NOTES 07/21/25 TPOLACEK*** BUILDER WILL NEED TO INSTALL SILT FENCE ACROSS FRONT LEAVING CONSTRUCTION ENTRANCE OPENING ONLY AND MAKE SURE SWALE IS KEPT OPEN OR INSTALL TEMPORARY CULVERT. 10 DAYS BEFORE REINSPECTION. SEE DETAIL IN PHOTO SECTION.
ALL ROUGH 09/29/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/29/2025 10:43:53 AM *** Inspector Notes from Inspection 2320 *** NOTES ADDED BY RSIMS 9/24/2025 2:38:54 PM *** 9/24/25: Approved as noted. Check at All Rough. 1). Trusses B2 and B4 need to be plumbed/straightened. 2). Trusses C2 and C3 need dirt cleaned off so that original integrity can be visually verified. 9/23/2025 - PREVIOUS INSPECTION NOTES 9/23/25: 1). Left side of house. Lath required over large hole in CMU at low voltage cables. FBC [A]107.4 / FBC EC TABLE R402.4.1.1 Checked previous notes and they still need to be resolved. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 9/18/2025 11:45:58 AM *** 9/18/25: CHECK AT NEXT INSPECTION. 1). Trusses B2 and B4 need to be plumbed/straightened. 2). Trusses C2 and C3 need dirt cleaned off so that original integrity can be visually verified. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 9/8/2025 9:37:44 AM *** 9/8/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 - Marked with red paint.
LATH/BRICK/ WATER BARRIER 09/24/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/24/2025 2:38:54 PM *** 9/24/25: Approved as noted. Check at All Rough. 1). Trusses B2 and B4 need to be plumbed/straightened. 2). Trusses C2 and C3 need dirt cleaned off so that original integrity can be visually verified. 9/23/2025 - PREVIOUS INSPECTION NOTES 9/23/25: 1). Left side of house. Lath required over large hole in CMU at low voltage cables. FBC [A]107.4 / FBC EC TABLE R402.4.1.1 Checked previous notes and they still need to be resolved. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 9/18/2025 11:45:58 AM *** 9/18/25: CHECK AT NEXT INSPECTION. 1). Trusses B2 and B4 need to be plumbed/straightened. 2). Trusses C2 and C3 need dirt cleaned off so that original integrity can be visually verified. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 9/8/2025 9:37:44 AM *** 9/8/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 - Marked with red paint.
ROW - DRAINAGE 09/24/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 09-24-25 TPOLACEK*** BUILDER NEEDS TO REESTABLISH TEMPORARY PIPE AND SILT FENCE ACROSS RIGHT SIDE SWALE. 3 DAYS Inspector Notes from Inspection 9470 8/5/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THE DRAINAGE REINSPECTION. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN CONSTRUCTUION SITE TO COPC STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. ______________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES 07/31/25 TPOLACEK*** BUILDER HAS TILL MONDAY 08/04/25 TO COMPLY BEFORE A PRIORITY 1 STATUS IS APPLIED TO PERMIT. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/21/2025 - PREVIOUS INSPECTION NOTES 07/21/25 TPOLACEK*** BUILDER WILL NEED TO INSTALL SILT FENCE ACROSS FRONT LEAVING CONSTRUCTION ENTRANCE OPENING ONLY AND MAKE SURE SWALE IS KEPT OPEN OR INSTALL TEMPORARY CULVERT. 10 DAYS BEFORE REINSPECTION. SEE DETAIL IN PHOTO SECTION.
LATH/BRICK/ WATER BARRIER 09/23/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 9/23/2025 9:12:47 AM *** 9/23/25: 1). Left side of house. Lath required over large hole in CMU at low voltage cables. FBC [A]107.4 / FBC EC TABLE R402.4.1.1 Checked previous notes and they still need to be resolved. Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 9/18/2025 11:45:58 AM *** 9/18/25: CHECK AT NEXT INSPECTION. 1). Trusses B2 and B4 need to be plumbed/straightened. 2). Trusses C2 and C3 need dirt cleaned off so that original integrity can be visually verified. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 9/8/2025 9:37:44 AM *** 9/8/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 - Marked with red paint.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/18/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/18/2025 11:45:58 AM *** 9/18/25: CHECK AT NEXT INSPECTION. 1). Trusses B2 and B4 need to be plumbed/straightened. 2). Trusses C2 and C3 need dirt cleaned off so that original integrity can be visually verified. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 9/8/2025 9:37:44 AM *** 9/8/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 - Marked with red paint.
ROOF VALLEY & METAL 09/17/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/17/2025 9:14:17 AM *** Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 9/8/2025 9:37:44 AM *** 9/8/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 - Marked with red paint.
WALL SHEATHING 09/17/2025 APPROVED RSIMS
Note: Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 9/8/2025 9:37:44 AM *** 9/8/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 - Marked with red paint.
TIE BEAM / LINTEL 09/08/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/8/2025 9:37:44 AM *** 9/8/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 - Marked with red paint.
MONOLITHIC SLAB 08/28/2025 APPROVED JSTEWART
Note: 8/27/2025 - PREVIOUS INSPECTION NOTES 8/27/25: NOTE: RAIN HAS CAUSED MINOR CAVE-IN AT MISCELLANEOUS AREAS AND FLOODED MOST OF THE FOOTERS SO THAT REBAR CLEARANCE ALONG WITH ANY ADDITIONAL CAVE-IN, ETC CAN NOT BE CHECKED/VERIFIED. FBC-[A] 110.1 8/26/2025 - PREVIOUS INSPECTION NOTES 1. Deep footing not per detail marked on 2.0 FD, calls for 4 #5 each way 2. Clean footings out so they are free from debris and proper clearence to rebar from earth FBC R404.1.3.3.7.4 3. Seal all penotrations in vapor barrier FBC R506.2.3 4. A/C line set chase requires a relieving arch FBCR P2603.4
MONOLITHIC SLAB 08/27/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 8/27/2025 1:46:47 PM *** 8/27/25: NOTE: RAIN HAS CAUSED MINOR CAVE-IN AT MISCELLANEOUS AREAS AND FLOODED MOST OF THE FOOTERS SO THAT REBAR CLEARANCE ALONG WITH ANY ADDITIONAL CAVE-IN, ETC CAN NOT BE CHECKED/VERIFIED. FBC-[A] 110.1 8/26/2025 - PREVIOUS INSPECTION NOTES 1. Deep footing not per detail marked on 2.0 FD, calls for 4 #5 each way 2. Clean footings out so they are free from debris and proper clearence to rebar from earth FBC R404.1.3.3.7.4 3. Seal all penotrations in vapor barrier FBC R506.2.3 4. A/C line set chase requires a relieving arch FBCR P2603.4
MONOLITHIC SLAB 08/26/2025 Disapproved - NO FEE MKRASKI
Note: 1. Deep footing not per detail marked on 2.0 FD, calls for 4 #5 each way 2. Clean footings out so they are free from debris and proper clearence to rebar from earth FBC R404.1.3.3.7.4 3. Seal all penotrations in vapor barrier FBC R506.2.3 4. A/C line set chase requires a relieving arch FBCR P2603.4
U-CROSS CONNECTION 08/26/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cc
PLUMBING 1ST ROUGH UNDERGROUND 08/22/2025 APPROVED MGIBSON
Note: 8/20/2025 - PREVIOUS INSPECTION NOTES 8/20/25: NOT READY! CONTRACTOR STILL WORKING ON INSTALLATION.
PLUMBING 1ST ROUGH UNDERGROUND 08/20/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 8/20/2025 11:50:06 AM *** 8/20/25: NOT READY! CONTRACTOR STILL WORKING ON INSTALLATION.
FORMBOARD SURVEY (OFFICE USE ONLY) 08/14/2025 APPROVED RRICKS
WATER METER INSTALLATION REQUEST 08/12/2025 APPROVED CBOWERMASTER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 08/05/2025 APPROVED PKNAPIK
ROW - DRAINAGE 08/04/2025 APPROVED - AS NOTED FSLADISH
Note: 8/5/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THE DRAINAGE REINSPECTION. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN CONSTRUCTUION SITE TO COPC STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. ______________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES 07/31/25 TPOLACEK*** BUILDER HAS TILL MONDAY 08/04/25 TO COMPLY BEFORE A PRIORITY 1 STATUS IS APPLIED TO PERMIT. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/21/2025 - PREVIOUS INSPECTION NOTES 07/21/25 TPOLACEK*** BUILDER WILL NEED TO INSTALL SILT FENCE ACROSS FRONT LEAVING CONSTRUCTION ENTRANCE OPENING ONLY AND MAKE SURE SWALE IS KEPT OPEN OR INSTALL TEMPORARY CULVERT. 10 DAYS BEFORE REINSPECTION. SEE DETAIL IN PHOTO SECTION.
ROW - DRAINAGE 07/31/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 07/31/25 TPOLACEK*** BUILDER HAS TILL MONDAY 08/04/25 TO COMPLY BEFORE A PRIORITY 1 STATUS IS APPLIED TO PERMIT. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/21/2025 - PREVIOUS INSPECTION NOTES 07/21/25 TPOLACEK*** BUILDER WILL NEED TO INSTALL SILT FENCE ACROSS FRONT LEAVING CONSTRUCTION ENTRANCE OPENING ONLY AND MAKE SURE SWALE IS KEPT OPEN OR INSTALL TEMPORARY CULVERT. 10 DAYS BEFORE REINSPECTION. SEE DETAIL IN PHOTO SECTION.
ROW - DRAINAGE 07/21/2025 Disapproved - NO FEE TPOLACEK
Note: 07/21/25 TPOLACEK*** BUILDER WILL NEED TO INSTALL SILT FENCE ACROSS FRONT LEAVING CONSTRUCTION ENTRANCE OPENING ONLY AND MAKE SURE SWALE IS KEPT OPEN OR INSTALL TEMPORARY CULVERT. 10 DAYS BEFORE REINSPECTION. SEE DETAIL IN PHOTO SECTION.

Review History

Department Status Date In Date Out
SW1 COMPLETE 08/13/2025 08/14/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 08/13/2025 08/13/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 08/04/2025 08/05/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 06/17/2025 06/18/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Based on information provided this lot is 0.7' (8.4"). Please keep this in mind that the maximum above adjacent lots is 0.83' (10") when construction formboards and pouring slab.
ENGIN1 COMPLETE 06/17/2025 06/18/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 06/17/2025 06/17/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 06/06/2025 06/25/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 06/05/2025 06/12/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 06/05/2025 06/12/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
CUSVC COMPLETE 06/05/2025 06/12/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 06/05/2025 06/11/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/05/2025 06/06/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 06/05/2025 06/09/2025
LOCATE COMPLETE 06/05/2025 06/09/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/05/2025 06/10/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 06/05/2025 06/11/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please depict berm at the 5' easement. This will minimize the amount of water flow back to the vacant lots.
ZON COMPLETE 06/05/2025 06/06/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/12/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG - INSPECTION 20 ¤20.00 12/11/2025
SW ENG INSPECTION 80 ¤80.00 06/24/2025
SW ENG PRE APRON ¤30.00 06/24/2025
SW ENG - REVIEW 20 ¤20.00 06/24/2025
SW ENG RES REVIEW 200 ¤200.00 06/24/2025
WATER METER W/ TAP ¤2,326.93 06/24/2025
SEWER CREDIT (¤2,025.14) 06/24/2025
WASTEWATER PERM INSPECTION ¤80.00 06/24/2025
WASTEWATER PERM REVIEW ¤25.00 06/24/2025
SEWER CAPITAL FACILITY ¤4,415.00 06/24/2025
WATER CREDIT (¤1,065.22) 06/24/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 06/24/2025
WATER PERMIT REVIEW ¤25.00 06/24/2025
WATER MAIN EXTENSION IMPACT ¤917.27 06/24/2025
SITE PLAN 30 ¤30.00 06/24/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 06/24/2025
SURCHARGE FS 533.721 ¤10.82 06/24/2025
SURCHARGE - FS 468.631 ¤16.23 06/24/2025
SW ENG - FOUNDATION SURVEY ¤20.00 06/24/2025
WATER- TURN ON ¤50.00 06/24/2025
ADJUSTMENT 10% (¤120.20) 06/24/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/24/2025
INSPECTION - RESIDENTIAL ¤913.00 06/24/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 06/24/2025
FC IMPACT FEE EMS ¤62.00 06/24/2025
IMPACT FEE FIRE ¤434.51 06/24/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/24/2025
FC IMPACT FEE LIBRARY ¤268.00 06/24/2025
IMPACT FEE PARKS ¤1,828.01 06/24/2025
IMPACT FEE SCHOOL ¤5,450.00 06/24/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 06/24/2025
PEP TANK INSTALL ¤756.74 06/24/2025
Fees Total Due: ¤0.00 Total Paid: ¤23,486.40