I want to search for...
Permit #2025060286
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-0170 |
| CONDITIONED SPACE: 2822 sqft |
| GARAGE: 741 sqft |
| OPENED PORCH (WITH ROOF) : 528 sqft |
| Total Square Footage: 4091 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 386-236-4133 |
| Location Address: 806 LOBLOLLY CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/24/2025 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: VOLUSIA RESIDENTIAL CONSTRUCTION LLC |
|
Address 2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤338,584.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1262114 (Exp: 08/31/2026) | 386-236-4133 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
HUGH MACDONALD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10825 TOM FOLSOM ROAD, SUITE A THONOTOSASSA, FL 33592 |
CCC1329562 (Exp: 08/31/2026) | 813-986-4968 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 04/02/2026 | APPROVED | BVEIGA |
| Note: 4/1/2026 - PREVIOUS INSPECTION NOTES Tree is to close to the water pit and needs to be moved 3ft. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/01/2026 | Disapproved - NO FEE | BWRIGHT |
| Note: Tree is to close to the water pit and needs to be moved 3ft. | |||
| BLD - BUILDING FINAL | 04/01/2026 | FINAL APPROVED | MCONTRYMAN |
| ROW - FINAL APRON (AFTER POUR) | 03/31/2026 | APPROVED | TPOLACEK |
| Note: PAVERS ARE SET AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/31/2026 | APPROVED | TPOLACEK |
| Note: Effective 03-25-26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certificates for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/31/2026 | CANCELLED BY INSPECTOR | TPOLACEK |
| Note: Effective 03-25-26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certificates for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 03/31/2026 | APPROVED - AS NOTED | TPOLACEK |
| Note: THERE IS A SMALL AMOUNT OF TRASH IN THE BACK THAT BUILDER IS CLEANING UP APPROVING AS NOTED | |||
| ELECTRIC - EARLY POWER | 03/16/2026 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 11am | |||
| U-CROSS CONNECTION | 02/24/2026 | APPROVED | BWRIGHT |
| ROW- PRE-APRON (PRE-POUR) | 02/24/2026 | APPROVED | TPOLACEK |
| Note: READY FOR PAVERS AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 2/17/2026 - PREVIOUS INSPECTION NOTES 02-17-26 TPOLACEK*** SPOKE WITH BUILDER ABOUTT PAVER DETAIL OPTION AND THEY CONFIRMED WITH THEIR OFFICE THAT THEY CHOSE WRONG OPTION. THEY MEANT TO CHOOSE 3B INSTEAD KEEPING UP WITH THE REST OF THE DEVOLPMENT. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PAVER RESTRAINTS | 02/17/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 02/17/2026 | PARTIALLY APPROVED | TPOLACEK |
| Note: 02-17-26 TPOLACEK*** SPOKE WITH BUILDER ABOUTT PAVER DETAIL OPTION AND THEY CONFIRMED WITH THEIR OFFICE THAT THEY CHOSE WRONG OPTION. THEY MEANT TO CHOOSE 3B INSTEAD KEEPING UP WITH THE REST OF THE DEVOLPMENT. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| INSULATION | 01/28/2026 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2420 1/26/26 Will check at insulation 1. Shed roof not per detail, can check after stucco and paint 2. A35s on upstairs SGD missing or covered by lath 1/23/2026 - PREVIOUS INSPECTION NOTES Cancelled via phone call @ 8:57am 1/22/2026 - PREVIOUS INSPECTION NOTES 1/22/26 1. Shed roof not per detail, can check after stucco and paint 2. A35s on upstairs SGD missing or covered by lath 3. Nail plates missing for plumbing lines in stairway wall and garage wood frame wall 4. Damaged 2x6 and top plate in garage load bearing wood frame wall repair letter will be required 5. Blocking required above electrical panels 6. Exhaust fan duct damaged in down stairs bathroom (bathroom closest to garage) 7. Vent stack n/p required for front bathroom @ bottom plate 8. Tub downstairs is not filled 9. Slab must be sealed at tub drain 10. Patch CMU where vanity plumbing is in downstairs front bathroom 1/12/26 1. All ledgers not per detail 2. Shed roofs over windows not built per detail 3. Missing A35's on upstairs SGD framing | |||
| LATH/BRICK/ WATER BARRIER | 01/27/2026 | APPROVED | HCAMACHO |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2460 1/12/26 1. All ledgers not per detail 2. Shed roofs over windows not built per detail 3. Missing A35's on upstairs SGD framing | |||
| ALL ROUGH | 01/26/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 1/26/26 Will check at insulation 1. Shed roof not per detail, can check after stucco and paint 2. A35s on upstairs SGD missing or covered by lath 1/23/2026 - PREVIOUS INSPECTION NOTES Cancelled via phone call @ 8:57am 1/22/2026 - PREVIOUS INSPECTION NOTES 1/22/26 1. Shed roof not per detail, can check after stucco and paint 2. A35s on upstairs SGD missing or covered by lath 3. Nail plates missing for plumbing lines in stairway wall and garage wood frame wall 4. Damaged 2x6 and top plate in garage load bearing wood frame wall repair letter will be required 5. Blocking required above electrical panels 6. Exhaust fan duct damaged in down stairs bathroom (bathroom closest to garage) 7. Vent stack n/p required for front bathroom @ bottom plate 8. Tub downstairs is not filled 9. Slab must be sealed at tub drain 10. Patch CMU where vanity plumbing is in downstairs front bathroom 1/12/26 1. All ledgers not per detail 2. Shed roofs over windows not built per detail 3. Missing A35's on upstairs SGD framing | |||
| ALL ROUGH | 01/23/2026 | CANCELLED BY APPLICANT | MCONTRYMAN |
| Note: Cancelled via phone call @ 8:57am 1/22/2026 - PREVIOUS INSPECTION NOTES 1/22/26 1. Shed roof not per detail, can check after stucco and paint 2. A35s on upstairs SGD missing or covered by lath 3. Nail plates missing for plumbing lines in stairway wall and garage wood frame wall 4. Damaged 2x6 and top plate in garage load bearing wood frame wall repair letter will be required 5. Blocking required above electrical panels 6. Exhaust fan duct damaged in down stairs bathroom (bathroom closest to garage) 7. Vent stack n/p required for front bathroom @ bottom plate 8. Tub downstairs is not filled 9. Slab must be sealed at tub drain 10. Patch CMU where vanity plumbing is in downstairs front bathroom 1/12/26 1. All ledgers not per detail 2. Shed roofs over windows not built per detail 3. Missing A35's on upstairs SGD framing | |||
| ALL ROUGH | 01/22/2026 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1/22/26 1. Shed roof not per detail, can check after stucco and paint 2. A35s on upstairs SGD missing or covered by lath 3. Nail plates missing for plumbing lines in stairway wall and garage wood frame wall 4. Damaged 2x6 and top plate in garage load bearing wood frame wall repair letter will be required 5. Blocking required above electrical panels 6. Exhaust fan duct damaged in down stairs bathroom (bathroom closest to garage) 7. Vent stack n/p required for front bathroom @ bottom plate 8. Tub downstairs is not filled 9. Slab must be sealed at tub drain 10. Patch CMU where vanity plumbing is in downstairs front bathroom 1/12/26 1. All ledgers not per detail 2. Shed roofs over windows not built per detail 3. Missing A35's on upstairs SGD framing | |||
| LATH/BRICK/ WATER BARRIER | 01/22/2026 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2460 1/12/26 1. All ledgers not per detail 2. Shed roofs over windows not built per detail 3. Missing A35's on upstairs SGD framing | |||
| ELECTRIC-TUG | 01/22/2026 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 11am | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/12/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 1/12/26 1. All ledgers not per detail 2. Shed roofs over windows not built per detail 3. Missing A35's on upstairs SGD framing | |||
| ROOF VALLEY & METAL | 12/26/2025 | APPROVED | JSTEWART |
| WALL SHEATHING | 12/23/2025 | APPROVED | HCAMACHO |
| ROOF SHEATHING | 12/22/2025 | APPROVED | HCAMACHO |
| Note: 12/19/2025 - PREVIOUS INSPECTION NOTES Not ready for inspection, the guys are still framing and decking on the upper roof. | |||
| ROOF SHEATHING | 12/19/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: Not ready for inspection, the guys are still framing and decking on the upper roof. | |||
| TIE BEAM / LINTEL | 12/05/2025 | APPROVED | MCONTRYMAN |
| MONOLITHIC SLAB | 11/21/2025 | APPROVED | HCAMACHO |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/18/2025 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/18/2025 | APPROVED | MGIBSON |
| SEWER TIE IN | 11/18/2025 | APPROVED | MGIBSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 11/17/2025 | APPROVED | PFLANAGAN |
| WATER METER INSTALLATION REQUEST | 11/13/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/23/2026 | 01/26/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/17/2025 | 11/17/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/17/2025 | 11/17/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/15/2025 | 10/20/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/06/2025 | 10/07/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/06/2025 | 10/09/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Changes to plans need to be clouded so that we can identify changes. Also, please complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp (shop drawing review) indicating acceptance and approval of truss design (Not wet seal) | |||
| ELEC | COMPLETE | 10/06/2025 | 10/09/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/06/2025 | 10/07/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/06/2025 | 10/07/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/29/2025 | 09/30/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Comments: - As discussed please increase the 24.7' elevation at the back of the garage on the right so there is a minimum of 0.3' to the common swale. - Please update structural plans calling out where the thickened footers will be to allow for the grade drop adjacent to the foundation. | |||
| ENGIN1 | COMPLETE | 09/29/2025 | 09/30/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/29/2025 | 09/29/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/23/2025 | 09/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/22/2025 | 09/22/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/22/2025 | 09/26/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading comments: Based on the proposed elevations there are slopes greater than 4:1 on the right side of this home. There is 1.5' between the grade adjacent to the foundation and the lot line. In 1.5' the maximum drop is 0.375. Please revise so that there are no slopes greater than 4:1. | |||
| ENGIN1 | COMPLETE | 09/22/2025 | 09/23/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/18/2025 | 09/19/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM SITE PLAN STILL SHOWS THAT WATER IS STILL IMPACTING THE LOT TO THE RIGHT. | |||
| BADMIN | INFORMATION | 09/18/2025 | 09/18/2025 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM rename your file correctly "Site Plan" | |||
| ENGIN1 | COMPLETE | 09/18/2025 | 09/18/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/18/2025 | 09/18/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Changed driveway layout. Landscape plan will need to be changed to match site plan. Please always state on correction/revision sheet what was changed | |||
| SW1 | HOLD | 08/25/2025 | 08/28/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE SITE PLAN IN THE SYSTEM HAS BEEN REJECTED NRRD TO UPLOAD A NEW SITE PLAN | |||
| MECH | HOLD | 08/25/2025 | 08/26/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. update mechanical subcontractor in portal (Second Request) 2. Provide updated state card | |||
| BLD | COMPLETE | 08/25/2025 | 08/28/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/06/2025 | 06/13/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/06/2025 | 06/13/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. All Structural plans need to be digitally verifiable. FDD, FD1, CS, S1 Struct, S2 Struct, FR1-F, FR1-C, FR2, FR3 | |||
| CUSVC | COMPLETE | 06/06/2025 | 06/12/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/06/2025 | 06/11/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/06/2025 | 06/09/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/06/2025 | 06/11/2025 |
| LOCATE | COMPLETE | 06/06/2025 | 06/10/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/06/2025 | 06/11/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/06/2025 | 06/11/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Based on the information provided water is negatively impacting home and FFE appears low. - Please provide proposed elevations and exisiting elevations every 20'. This should also include the drainage pattern. - Please provide the FFE of lot 19 to ensure that this home will not cause drainage issues for vacant lot 18 or this lot in the future. | |||
| ZON | COMPLETE | 06/06/2025 | 06/06/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 06/06/2025 | 06/12/2025 |
| Note: Released By: MATTHEW SIERRA - (386)286-2002 - MSIERRA@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/06/2025 | 06/11/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM THIS IS THE CORRECT REVIEW. PREVIOUS WAS DONE IN ERROR. Provide energy calcs from listed subcontractor or update subcontractor in portal |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/02/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 10/24/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 10/24/2025 |
| IMPACT FEE FIRE | ¤434.51 | 10/24/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/24/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/24/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 10/24/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/24/2025 |
| IMPACT FEE TRANSPORTATION | ¤3,502.00 | 10/24/2025 |
| WATER METER W/OUT TAP | ¤965.03 | 10/24/2025 |
| SURCHARGE FS 533.721 | ¤17.90 | 10/24/2025 |
| SURCHARGE - FS 468.631 | ¤26.85 | 10/24/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/24/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/24/2025 |
| SW ENG PRE APRON | ¤30.00 | 10/24/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/24/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 10/24/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 10/24/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 10/24/2025 |
| SITE PLAN 30 | ¤30.00 | 10/24/2025 |
| WATER- TURN ON | ¤50.00 | 10/24/2025 |
| ADJUSTMENT 10% | (¤198.92) | 10/24/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/24/2025 |
| INSPECTION - RESIDENTIAL | ¤1,526.25 | 10/24/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤432.90 | 10/24/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,982.53 |