Permit #2025060334
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-1840 |
| CONDITIONED SPACE: 2423 sqft |
| GARAGE: 716 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| Total Square Footage: 3336 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 386-236-4133 |
| Location Address: 425 BOURGANVILLE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/27/2025 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: MHK OF VOLUSIA COUNTY INC |
|
Address 2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
| Lot: 184 |
| Contracted Stated Job Value: ¤323,610.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1262114 (Exp: 08/31/2026) | 386-236-4133 |
Sub Contractors
HARLEY M BRYAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
5223 EDGEWOOD CT ORMOND BEACH, FL 32174 |
LI26657 (Exp: 08/31/2028) | 386-463-2700 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
HUGH MACDONALD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10825 TOM FOLSOM ROAD, SUITE A THONOTOSASSA, FL 33592 |
CCC1329562 (Exp: 08/31/2026) | 813-986-4968 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/09/2025 | FINAL APPROVED | HCAMACHO |
| Note: 12/8/2025 - PREVIOUS INSPECTION NOTES 1. Airhandler has a 60 amp breaker installed and it needs a 35 amp. 2. Airhandler needs a locking breaker. 3. Wall oven needs a locking breaker. 4. Garbage disposal needs a wip to plug in. 5. Garage ceiling above breaker panel needs to be sealed. Inspector Notes from Inspection 2425 11/24/25 Frame only installed, panels not installed but onsite and verified Fl product approval. Check all anchors and ensure they are all fully embedded per manufacturer specs. Check at final | |||
| BLD - BUILDING FINAL | 12/08/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Airhandler has a 60 amp breaker installed and it needs a 35 amp. 2. Airhandler needs a locking breaker. 3. Wall oven needs a locking breaker. 4. Garbage disposal needs a wip to plug in. 5. Garage ceiling above breaker panel needs to be sealed. Inspector Notes from Inspection 2425 11/24/25 Frame only installed, panels not installed but onsite and verified Fl product approval. Check all anchors and ensure they are all fully embedded per manufacturer specs. Check at final | |||
| GAS FINAL | 12/01/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: PER ''HOA'' ANOTHER GAS PERMIT IS REQUIRED WHEN U/G TANK WILL BE INSTALLED | |||
| ROW - FINAL APRON (AFTER POUR) | 11/26/2025 | APPROVED | TPOLACEK |
| Note: PAVERS ARE SET AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 11/26/2025 | APPROVED | TPOLACEK |
| Note: 11-26-25 TPOLACEK*** AREA IN BACK LEFT CORNER OF STRUCTURE HAS SOME WASHOUT UNDER SOD. PLEASE REESTABLISH DIRT UNDER SOD APPROVING AS NOTED AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 11/26/2025 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/25/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/25/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| WINDOW NAILING | 11/24/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 11/24/25 Frame only installed, panels not installed but onsite and verified Fl product approval. Check all anchors and ensure they are all fully embedded per manufacturer specs. Check at final | |||
| ELECTRIC - EARLY POWER | 11/21/2025 | APPROVED | RMARTIN |
| Note: Inspector Notes from Inspection 2200 Authorize release of email. | |||
| FRAMING | 11/20/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Replacing the french door and windows in the rear porch to sliders. All paper work submitted. | |||
| U-CROSS CONNECTION | 11/20/2025 | APPROVED | BWRIGHT |
| ROW- PRE-APRON (PRE-POUR) | 10/16/2025 | APPROVED | EMADISON |
| Note: ** 10/16/25 READY TO SET PAVERS AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PAVER RESTRAINTS | 10/14/2025 | APPROVED | EMADISON |
| Note: ** 10/14/25 READY TO POUR PAVER RESTRAINTS WITH APRON ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 10/14/2025 | PARTIALLY APPROVED | EMADISON |
| Note: ** 10/14/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________ | |||
| ELECTRIC-TUG | 10/09/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email. | |||
| LATH/BRICK/ WATER BARRIER | 09/26/2025 | APPROVED | HCAMACHO |
| INSULATION | 09/25/2025 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2420 1. FBCR M1601.4.1 FASTENING RANGE DUCT W/ 3 SCREWS AT THE JOINTS 9/22/2025 - PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 09/23/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. FBCR M1601.4.1 FASTENING RANGE DUCT W/ 3 SCREWS AT THE JOINTS 9/22/2025 - PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 09/22/2025 | CANCELLED BY APPLICANT | JSTEWART |
| GAS ROUGH | 09/22/2025 | APPROVED | MGIBSON |
| ROOF VALLEY & METAL | 09/08/2025 | APPROVED | MCONTRYMAN |
| WALL SHEATHING | 09/03/2025 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/03/2025 | APPROVED | JSTEWART |
| TIE BEAM / LINTEL | 08/25/2025 | APPROVED | JSTEWART |
| MONOLITHIC SLAB | 08/14/2025 | APPROVED | HCAMACHO |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/12/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS APPROVED ON 8/6/25 ALONG WITH SEWER TIE IN AND GRAVITY SEWER | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 08/11/2025 | APPROVED | RRICKS |
| GRAVITY SEWER TEST | 08/08/2025 | APPROVED | MGIBSON |
| SEWER TIE IN | 08/08/2025 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/08/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/31/2025 | 11/05/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/28/2025 | 10/31/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Provide product approval for SGD | |||
| SW1 | COMPLETE | 08/21/2025 | 08/22/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/21/2025 | 08/21/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/08/2025 | 08/08/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Dimension on the formboard on right side of home towards the back does not match approved site plan. Please submit a revised formboard survey that matches the approved site plan or submit a revised site plan if the dimensions need to change. | |||
| ZON | COMPLETE | 08/08/2025 | 08/08/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/08/2025 | 08/11/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/08/2025 | 08/11/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/08/2025 | 08/08/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/30/2025 | 07/03/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/30/2025 | 07/03/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved contingent on final survey | |||
| ZON | COMPLETE | 06/30/2025 | 06/30/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/24/2025 | 06/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/18/2025 | 06/18/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/18/2025 | 06/24/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Roofing worksheet FL# 7894.2 not valid. The number should be 7849.2 2. ok 3rd Request | |||
| ENGIN1 | COMPLETE | 06/18/2025 | 06/18/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/18/2025 | 06/18/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/13/2025 | 06/13/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: if the setback is 4.9' from right side of the home it needs to meet 7' setback this does not meet as proposed. Site plan: Setback on the right side of home near the ac pad is not clear . Please provide the setback and please know that this side needs to have a minimum setback of 7'. clarify the walk way width measurement shows 6.5 but there is a written 3 ft brick paver walkway. Walkways have a maximum width ot 6'.Please adjust accordingly | |||
| SW1 | COMPLETE | 06/13/2025 | 06/17/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/13/2025 | 06/18/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Roofing worksheet FL# 7894.25 not valid. 2. Plan Sheet S1 Structural is not digitally verifiable. 2nd Request | |||
| BADMIN | COMPLETE | 06/06/2025 | 06/12/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/06/2025 | 06/12/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Roofing worksheet FL# 7894.25 not valid. 2. Plan Sheet S1 Structural is not digitally verifiable. | |||
| CUSVC | COMPLETE | 06/06/2025 | 06/12/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/06/2025 | 06/11/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/06/2025 | 06/09/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 06/06/2025 | 06/11/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/06/2025 | 06/10/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/06/2025 | 06/11/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/06/2025 | 06/11/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Note: 419 Bourganville which is the nearest improved lot is 29.71'. No issues with FFE. Please provide proposed elevations every 20' clearly depicting the high points on the side property lines with elevations and flow lines. | |||
| ZON | HOLD | 06/06/2025 | 06/10/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Setback on the right side of home near the ac pad is not clear . Please provide the setback and please know that this side needs to have a minimum setback of 7'. clarify the walk way width measurement shows 6.5 but there is a written 3 ft brick paver walkway. Walkways have a maximum width ot 6'.Please adjust accordingly | |||
| URB | COMPLETE | 06/06/2025 | 06/12/2025 |
| Note: Released By: MATTHEW SIERRA - (386)286-2002 - MSIERRA@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | 06/27/2025 |
| ADJUSTMENT 10% | (¤167.15) | 06/27/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/27/2025 |
| INSPECTION - RESIDENTIAL | ¤1,278.75 | 06/27/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤362.70 | 06/27/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 06/27/2025 |
| IMPACT FEE FIRE | ¤434.51 | 06/27/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/27/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/27/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 06/27/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/27/2025 |
| IMPACT FEE TRANSPORTATION | ¤3,502.00 | 06/27/2025 |
| WATER METER W/OUT TAP | ¤965.03 | 06/27/2025 |
| SURCHARGE FS 533.721 | ¤15.04 | 06/27/2025 |
| SURCHARGE - FS 468.631 | ¤22.56 | 06/27/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/27/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/27/2025 |
| SW ENG PRE APRON | ¤30.00 | 06/27/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/27/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/27/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 06/27/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 06/27/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 06/27/2025 |
| SITE PLAN 30 | ¤30.00 | 06/27/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,829.45 |