Permit #2025060443

Permit Details

Status: COED

Parcel Id: 07-11-31-7032-00510-0350
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00510
Subdivision: -
Job Phone: 239-571-5325
Location Address: 33 ROXTON LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/04/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES LLC

Address

581 NW MERCANTILE PLACE

PORT SAINT LUCIE, FL 34986

Address

106

PORT SAINT LUCIE, FL 34986

Lot: 0350
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/10/2025 APPROVED CVANSTRAHLEN
U -UTILITY RESIDENTIAL FINAL 12/10/2025 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 No IRR/No CC
ROW - STORMWATER FINAL 12/09/2025 APPROVED - AS NOTED TPOLACEK
Note: 12-9-25 TPOLACEK*** PLEASE REMOVE SILT FENCE FROM VACANT SWALE AND MAKE ANY REPAIRS. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL APRON (AFTER POUR) 12/09/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/09/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 12/09/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U-CROSS CONNECTION 12/08/2025 APPROVED - AS NOTED BWRIGHT
Note: No IRR/No CC
ELECTRIC - EARLY POWER 12/05/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 12/5/25 Emailed FPL
ROW- PRE-APRON (PRE-POUR) 12/01/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. Inspector Notes from Inspection 9470 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. = 9/2/2025 - PREVIOUS INSPECTION NOTES 09/02/25 TPOLACEK*** SITE HAS NOW WASHED OUT INTO VACANT LOT SWALE DOWNSTREAM. BUILDER WILL BE REQUIRED TO REESTABLISH THE SWALES ON SUBJECT LOT AND VACANT ASAP. PERMIT IS PLACED ON HOLD UNTIL CONDITIONS ARE CORRECTED. BUILDER IS NOW REQUIRED TO ADD SILT FENCE ACROSS DOWNSTREAM SIDE OF SWALE TO PREVENT SEDIMENT FROM LEAVING BUILDERS SITE. INSPECTIONS/ ROW SEC 300,03 F3 V-21 "3. SEC 300,03 F3. When necessary, an Erosion Control Inspection will be required if the subject property is adjacent to significantly lower property, such as a ditch, canal, water body or any other Stormwater conveyance, including drainage pipes, catch basins and spillways. A silt fence will be required at the discretion of the Stormwater Inspector. The Permittee will be notified if additional Erosion Control Measures are required at the time the permit is issued. Site work cannot begin prior to the permit being issued." INSPECTIONS/ ROW SEC 300,03 F4 V-21 4.SEC 300,03 F4 V-21-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage. 1 Silt Fence needed Sec 300.01 E3 Sec 300.01 E3 A silt fence is required on the downstream end of the swale, at the property line, adjacent to a ditch, or at the discretion of the Stormwater Inspector anytime during the construction. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/28/2025 - PREVIOUS INSPECTION NOTES 08/28/25 TPOLACEK*** WAS TOLD BY CM THEY WOULD HAVE THIS COMPLETED BY MONDAY. SWALE IS BLOCKING DRAINAGE AND THE FRONT SILT FENCE IS NOT UP. PERMIT WILL BE PLACED ON HOLD UNTIL CORRECTIONS ARE MADE. IF NOT CORRECTED BY MONDAY A STOP WORK ORDER WILL BE PLACED ON SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/25/2025 - PREVIOUS INSPECTION NOTES 08/25/25 TPOLACEK***** BUILDER STILL NEEDS TO INSTALL SILT FENCE ACROSS THE ROW AND INSTAL CONSTRUCTION ENTRANCE AS REQUIRED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/21/2025 - PREVIOUS INSPECTION NOTES 08/21/25 TPOLACEK*** SPOKE WITH CM AND THEY ARE HAVING FILL BROUGHT IN TODAY AND TOMORROW SO I WILL EXTEND SILT FENCE AND PIPE INSPECTION UNTIL MONDAY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/14/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL SILT FENCE AROUND ENTIRE PROPERTY AND LEAVE A CONSTRUCTION ENTERANCE. IF YOUR CONSTRUCTION ENTERANCE YOU CHOOSE TO USE A TEMP. CULVERT IT NEEDS TO MINIMUM 12" AND NEED TO BE ABLE TO ALLOW WATER TO FLOW PROPERLY. 2) NEED TO REMOVE ALL TRASH ON THE RIGHT SIDE OF LOT IN THE RIGHT OF WAY. 3) NEED TO REMOVE ALL DIRT FROM THE RIGHT OF WAY AND LEAVE NOTHING BUT GRASS. YOU WILL HAVE 7DAY TO CORRECT ALL AREAS ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. WHEN DUMPSTER AND PORTER JON ALL NEED TO BE ON YOUR LOT IF NOT THE INSPECTION WILL FAIL.
INSULATION 11/26/2025 APPROVED CVANSTRAHLEN
ALL ROUGH 11/24/2025 APPROVED CVANSTRAHLEN
LATH/BRICK/ WATER BARRIER 11/24/2025 APPROVED CVANSTRAHLEN
WALL SHEATHING 11/13/2025 CANCELLED BY INSPECTOR CVANSTRAHLEN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/13/2025 APPROVED CVANSTRAHLEN
ROOF VALLEY & METAL 11/13/2025 APPROVED CVANSTRAHLEN
TIE BEAM / LINTEL 10/23/2025 APPROVED JSTEWART
MONOLITHIC SLAB 10/16/2025 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 10/16/2025 APPROVED CVANSTRAHLEN
GRAVITY SEWER TEST 10/07/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION WATER SERVICE NOT RAN YET , ALSO SEWER TIE IN WAS DONE BY UTILITY DEPART MENT FOR BOTH 33& 37 A VACANT LOT
SEWER TIE IN 10/07/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION WATER SERVICE NOT RAN YET , ALSO SEWER TIE IN WAS DONE BY UTILITY DEPART MENT FOR BOTH 33& 37 A VACANT LOT
PLUMBING 1ST ROUGH UNDERGROUND 09/29/2025 APPROVED - AS NOTED MGIBSON
Note: WATER SERVICE NOT RAN YET , ALSO SEWER TIE IN WAS DONE BY UTILITY DEPART MENT FOR BOTH 33& 37 A VACANT LOT
FORMBOARD SURVEY (OFFICE USE ONLY) 09/22/2025 APPROVED PFLANAGAN
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 09/08/2025 APPROVED PKNAPIK
ROW - DRAINAGE 09/04/2025 APPROVED - AS NOTED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. = 9/2/2025 - PREVIOUS INSPECTION NOTES 09/02/25 TPOLACEK*** SITE HAS NOW WASHED OUT INTO VACANT LOT SWALE DOWNSTREAM. BUILDER WILL BE REQUIRED TO REESTABLISH THE SWALES ON SUBJECT LOT AND VACANT ASAP. PERMIT IS PLACED ON HOLD UNTIL CONDITIONS ARE CORRECTED. BUILDER IS NOW REQUIRED TO ADD SILT FENCE ACROSS DOWNSTREAM SIDE OF SWALE TO PREVENT SEDIMENT FROM LEAVING BUILDERS SITE. INSPECTIONS/ ROW SEC 300,03 F3 V-21 "3. SEC 300,03 F3. When necessary, an Erosion Control Inspection will be required if the subject property is adjacent to significantly lower property, such as a ditch, canal, water body or any other Stormwater conveyance, including drainage pipes, catch basins and spillways. A silt fence will be required at the discretion of the Stormwater Inspector. The Permittee will be notified if additional Erosion Control Measures are required at the time the permit is issued. Site work cannot begin prior to the permit being issued." INSPECTIONS/ ROW SEC 300,03 F4 V-21 4.SEC 300,03 F4 V-21-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage. 1 Silt Fence needed Sec 300.01 E3 Sec 300.01 E3 A silt fence is required on the downstream end of the swale, at the property line, adjacent to a ditch, or at the discretion of the Stormwater Inspector anytime during the construction. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/28/2025 - PREVIOUS INSPECTION NOTES 08/28/25 TPOLACEK*** WAS TOLD BY CM THEY WOULD HAVE THIS COMPLETED BY MONDAY. SWALE IS BLOCKING DRAINAGE AND THE FRONT SILT FENCE IS NOT UP. PERMIT WILL BE PLACED ON HOLD UNTIL CORRECTIONS ARE MADE. IF NOT CORRECTED BY MONDAY A STOP WORK ORDER WILL BE PLACED ON SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/25/2025 - PREVIOUS INSPECTION NOTES 08/25/25 TPOLACEK***** BUILDER STILL NEEDS TO INSTALL SILT FENCE ACROSS THE ROW AND INSTAL CONSTRUCTION ENTRANCE AS REQUIRED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/21/2025 - PREVIOUS INSPECTION NOTES 08/21/25 TPOLACEK*** SPOKE WITH CM AND THEY ARE HAVING FILL BROUGHT IN TODAY AND TOMORROW SO I WILL EXTEND SILT FENCE AND PIPE INSPECTION UNTIL MONDAY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/14/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL SILT FENCE AROUND ENTIRE PROPERTY AND LEAVE A CONSTRUCTION ENTERANCE. IF YOUR CONSTRUCTION ENTERANCE YOU CHOOSE TO USE A TEMP. CULVERT IT NEEDS TO MINIMUM 12" AND NEED TO BE ABLE TO ALLOW WATER TO FLOW PROPERLY. 2) NEED TO REMOVE ALL TRASH ON THE RIGHT SIDE OF LOT IN THE RIGHT OF WAY. 3) NEED TO REMOVE ALL DIRT FROM THE RIGHT OF WAY AND LEAVE NOTHING BUT GRASS. YOU WILL HAVE 7DAY TO CORRECT ALL AREAS ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. WHEN DUMPSTER AND PORTER JON ALL NEED TO BE ON YOUR LOT IF NOT THE INSPECTION WILL FAIL.
ROW - DRAINAGE 09/02/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 09/02/25 TPOLACEK*** SITE HAS NOW WASHED OUT INTO VACANT LOT SWALE DOWNSTREAM. BUILDER WILL BE REQUIRED TO REESTABLISH THE SWALES ON SUBJECT LOT AND VACANT ASAP. PERMIT IS PLACED ON HOLD UNTIL CONDITIONS ARE CORRECTED. BUILDER IS NOW REQUIRED TO ADD SILT FENCE ACROSS DOWNSTREAM SIDE OF SWALE TO PREVENT SEDIMENT FROM LEAVING BUILDERS SITE. INSPECTIONS/ ROW SEC 300,03 F3 V-21 "3. SEC 300,03 F3. When necessary, an Erosion Control Inspection will be required if the subject property is adjacent to significantly lower property, such as a ditch, canal, water body or any other Stormwater conveyance, including drainage pipes, catch basins and spillways. A silt fence will be required at the discretion of the Stormwater Inspector. The Permittee will be notified if additional Erosion Control Measures are required at the time the permit is issued. Site work cannot begin prior to the permit being issued." INSPECTIONS/ ROW SEC 300,03 F4 V-21 4.SEC 300,03 F4 V-21-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage. 1 Silt Fence needed Sec 300.01 E3 Sec 300.01 E3 A silt fence is required on the downstream end of the swale, at the property line, adjacent to a ditch, or at the discretion of the Stormwater Inspector anytime during the construction. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/28/2025 - PREVIOUS INSPECTION NOTES 08/28/25 TPOLACEK*** WAS TOLD BY CM THEY WOULD HAVE THIS COMPLETED BY MONDAY. SWALE IS BLOCKING DRAINAGE AND THE FRONT SILT FENCE IS NOT UP. PERMIT WILL BE PLACED ON HOLD UNTIL CORRECTIONS ARE MADE. IF NOT CORRECTED BY MONDAY A STOP WORK ORDER WILL BE PLACED ON SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/25/2025 - PREVIOUS INSPECTION NOTES 08/25/25 TPOLACEK***** BUILDER STILL NEEDS TO INSTALL SILT FENCE ACROSS THE ROW AND INSTAL CONSTRUCTION ENTRANCE AS REQUIRED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/21/2025 - PREVIOUS INSPECTION NOTES 08/21/25 TPOLACEK*** SPOKE WITH CM AND THEY ARE HAVING FILL BROUGHT IN TODAY AND TOMORROW SO I WILL EXTEND SILT FENCE AND PIPE INSPECTION UNTIL MONDAY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/14/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL SILT FENCE AROUND ENTIRE PROPERTY AND LEAVE A CONSTRUCTION ENTERANCE. IF YOUR CONSTRUCTION ENTERANCE YOU CHOOSE TO USE A TEMP. CULVERT IT NEEDS TO MINIMUM 12" AND NEED TO BE ABLE TO ALLOW WATER TO FLOW PROPERLY. 2) NEED TO REMOVE ALL TRASH ON THE RIGHT SIDE OF LOT IN THE RIGHT OF WAY. 3) NEED TO REMOVE ALL DIRT FROM THE RIGHT OF WAY AND LEAVE NOTHING BUT GRASS. YOU WILL HAVE 7DAY TO CORRECT ALL AREAS ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. WHEN DUMPSTER AND PORTER JON ALL NEED TO BE ON YOUR LOT IF NOT THE INSPECTION WILL FAIL.
ROW - DRAINAGE 08/28/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 08/28/25 TPOLACEK*** WAS TOLD BY CM THEY WOULD HAVE THIS COMPLETED BY MONDAY. SWALE IS BLOCKING DRAINAGE AND THE FRONT SILT FENCE IS NOT UP. PERMIT WILL BE PLACED ON HOLD UNTIL CORRECTIONS ARE MADE. IF NOT CORRECTED BY MONDAY A STOP WORK ORDER WILL BE PLACED ON SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/25/2025 - PREVIOUS INSPECTION NOTES 08/25/25 TPOLACEK***** BUILDER STILL NEEDS TO INSTALL SILT FENCE ACROSS THE ROW AND INSTAL CONSTRUCTION ENTRANCE AS REQUIRED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/21/2025 - PREVIOUS INSPECTION NOTES 08/21/25 TPOLACEK*** SPOKE WITH CM AND THEY ARE HAVING FILL BROUGHT IN TODAY AND TOMORROW SO I WILL EXTEND SILT FENCE AND PIPE INSPECTION UNTIL MONDAY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/14/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL SILT FENCE AROUND ENTIRE PROPERTY AND LEAVE A CONSTRUCTION ENTERANCE. IF YOUR CONSTRUCTION ENTERANCE YOU CHOOSE TO USE A TEMP. CULVERT IT NEEDS TO MINIMUM 12" AND NEED TO BE ABLE TO ALLOW WATER TO FLOW PROPERLY. 2) NEED TO REMOVE ALL TRASH ON THE RIGHT SIDE OF LOT IN THE RIGHT OF WAY. 3) NEED TO REMOVE ALL DIRT FROM THE RIGHT OF WAY AND LEAVE NOTHING BUT GRASS. YOU WILL HAVE 7DAY TO CORRECT ALL AREAS ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. WHEN DUMPSTER AND PORTER JON ALL NEED TO BE ON YOUR LOT IF NOT THE INSPECTION WILL FAIL.
ROW - DRAINAGE 08/25/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 08/25/25 TPOLACEK***** BUILDER STILL NEEDS TO INSTALL SILT FENCE ACROSS THE ROW AND INSTAL CONSTRUCTION ENTRANCE AS REQUIRED. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/21/2025 - PREVIOUS INSPECTION NOTES 08/21/25 TPOLACEK*** SPOKE WITH CM AND THEY ARE HAVING FILL BROUGHT IN TODAY AND TOMORROW SO I WILL EXTEND SILT FENCE AND PIPE INSPECTION UNTIL MONDAY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/14/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL SILT FENCE AROUND ENTIRE PROPERTY AND LEAVE A CONSTRUCTION ENTERANCE. IF YOUR CONSTRUCTION ENTERANCE YOU CHOOSE TO USE A TEMP. CULVERT IT NEEDS TO MINIMUM 12" AND NEED TO BE ABLE TO ALLOW WATER TO FLOW PROPERLY. 2) NEED TO REMOVE ALL TRASH ON THE RIGHT SIDE OF LOT IN THE RIGHT OF WAY. 3) NEED TO REMOVE ALL DIRT FROM THE RIGHT OF WAY AND LEAVE NOTHING BUT GRASS. YOU WILL HAVE 7DAY TO CORRECT ALL AREAS ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. WHEN DUMPSTER AND PORTER JON ALL NEED TO BE ON YOUR LOT IF NOT THE INSPECTION WILL FAIL.
WATER METER INSTALLATION REQUEST 08/25/2025 APPROVED CBOWERMASTER
ROW - DRAINAGE 08/21/2025 CANCELLED BY APPLICANT TPOLACEK
Note: 08/21/25 TPOLACEK*** SPOKE WITH CM AND THEY ARE HAVING FILL BROUGHT IN TODAY AND TOMORROW SO I WILL EXTEND SILT FENCE AND PIPE INSPECTION UNTIL MONDAY. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/14/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL SILT FENCE AROUND ENTIRE PROPERTY AND LEAVE A CONSTRUCTION ENTERANCE. IF YOUR CONSTRUCTION ENTERANCE YOU CHOOSE TO USE A TEMP. CULVERT IT NEEDS TO MINIMUM 12" AND NEED TO BE ABLE TO ALLOW WATER TO FLOW PROPERLY. 2) NEED TO REMOVE ALL TRASH ON THE RIGHT SIDE OF LOT IN THE RIGHT OF WAY. 3) NEED TO REMOVE ALL DIRT FROM THE RIGHT OF WAY AND LEAVE NOTHING BUT GRASS. YOU WILL HAVE 7DAY TO CORRECT ALL AREAS ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. WHEN DUMPSTER AND PORTER JON ALL NEED TO BE ON YOUR LOT IF NOT THE INSPECTION WILL FAIL.
ROW - DRAINAGE 08/14/2025 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO INSTALL SILT FENCE AROUND ENTIRE PROPERTY AND LEAVE A CONSTRUCTION ENTERANCE. IF YOUR CONSTRUCTION ENTERANCE YOU CHOOSE TO USE A TEMP. CULVERT IT NEEDS TO MINIMUM 12" AND NEED TO BE ABLE TO ALLOW WATER TO FLOW PROPERLY. 2) NEED TO REMOVE ALL TRASH ON THE RIGHT SIDE OF LOT IN THE RIGHT OF WAY. 3) NEED TO REMOVE ALL DIRT FROM THE RIGHT OF WAY AND LEAVE NOTHING BUT GRASS. YOU WILL HAVE 7DAY TO CORRECT ALL AREAS ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. WHEN DUMPSTER AND PORTER JON ALL NEED TO BE ON YOUR LOT IF NOT THE INSPECTION WILL FAIL.

Review History

Department Status Date In Date Out
SW1 COMPLETE 09/22/2025 09/22/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 09/22/2025 09/22/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 09/08/2025 09/08/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 07/28/2025 07/30/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/28/2025 07/28/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 07/28/2025 07/28/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 07/11/2025 07/15/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Per technical manual section 300.01A.1.c.(6) Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. 1- Please revise so lot 34 is not impacting this lot beyond the 5' easement.
ENGIN1 COMPLETE 07/11/2025 07/14/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 07/11/2025 07/11/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/25/2025 06/26/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 06/25/2025 07/02/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - New homes shall not be considerably lower than improved homes. - Proposed slopes shall not be greater than 4:1.
ZON COMPLETE 06/25/2025 06/25/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 06/18/2025 06/18/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Previous comment not addressed: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM There shall be 6" of fall in the first 10' of the home in the back. 33.80' appears to be a typo. Please revise.
BLD COMPLETE 06/18/2025 06/24/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/18/2025 06/18/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 06/18/2025 06/18/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 06/11/2025 06/26/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 06/10/2025 06/17/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 06/10/2025 06/17/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Truss layout has wrong address.
CUSVC COMPLETE 06/10/2025 06/17/2025
Note: Released By: MICHELLE MCPARTLAND - -
ELEC COMPLETE 06/10/2025 06/17/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/10/2025 06/11/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 06/10/2025 06/13/2025
LOCATE COMPLETE 06/10/2025 06/16/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/10/2025 06/13/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 06/10/2025 06/17/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM There shall be 6" of fall in the first 10' of the home in the back. 33.80' appears to be a typo. Please revise.
ZON COMPLETE 06/10/2025 06/11/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 12/09/2025
SW ENG - INSPECTION 20 ¤20.00 12/09/2025
SW ENG - INSPECTION 20 ¤20.00 12/09/2025
SW ENG - INSPECTION 20 ¤20.00 12/09/2025
SW ENG - INSPECTION 20 ¤20.00 12/09/2025
SW ENG - INSPECTION 20 ¤20.00 12/09/2025
SW ENG INSPECTION 80 ¤80.00 08/04/2025
SW ENG PRE APRON ¤30.00 08/04/2025
SW ENG - REVIEW 20 ¤20.00 08/04/2025
SW ENG RES REVIEW 200 ¤200.00 08/04/2025
WATER METER W/ TAP ¤2,326.93 08/04/2025
SEWER CREDIT (¤1,466.00) 08/04/2025
WASTEWATER PERM INSPECTION ¤80.00 08/04/2025
WASTEWATER PERM REVIEW ¤25.00 08/04/2025
SEWER CAPITAL FACILITY ¤4,415.00 08/04/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 08/04/2025
WATER PERMIT REVIEW ¤25.00 08/04/2025
WATER MAIN EXTENSION IMPACT ¤917.27 08/04/2025
SITE PLAN 30 ¤30.00 08/04/2025
WATER- TURN ON ¤50.00 08/04/2025
ADJUSTMENT 10% (¤120.20) 08/04/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/04/2025
INSPECTION - RESIDENTIAL ¤913.00 08/04/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 08/04/2025
FC IMPACT FEE EMS ¤62.00 08/04/2025
IMPACT FEE FIRE ¤434.51 08/04/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/04/2025
FC IMPACT FEE LIBRARY ¤268.00 08/04/2025
IMPACT FEE PARKS ¤1,828.01 08/04/2025
IMPACT FEE SCHOOL ¤5,450.00 08/04/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 08/04/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 08/04/2025
SURCHARGE FS 533.721 ¤10.82 08/04/2025
SURCHARGE - FS 468.631 ¤16.23 08/04/2025
SW ENG - FOUNDATION SURVEY ¤20.00 08/04/2025
Fees Total Due: ¤0.00 Total Paid: ¤24,334.02