I want to search for...

Permit #2025060812

Permit Details

Status: COED

Parcel Id: 03-12-31-1126-00000-2280
CONDITIONED SPACE: 3306 sqft
GARAGE: 614 sqft
OPENED PORCH (WITH ROOF) : 76 sqft
OPENED PORCH (WITH ROOF) : 208 sqft
Total Square Footage: 4204 sqft
Subdivision: 2334 - EVOLVE PALM COAST - SANDLAKE SUBDIVISION LOT 4
Job Phone: 813-917-1689
Location Address: 67 ARMOYAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/03/2025
NOC: RECORDED
Applicant name: SCOTT EVAN KEUNING
Owner: TAYLOR MORRISON OF FLORIDA INC

Address

1275 W GRANADA BLVD

ORMOND BEACH, FL 32174

Address

SUITE 3B

ORMOND BEACH, FL 32174

Lot: 228
Contracted Stated Job Value: ¤228,971.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

TAYLOR MORRISON OF FLORIDA INC
Status Location Address State License Number Phone
ACTIVE

7785 BAY MEADOWS WAY, SUITE 105

JACKSONVILLE, FL 32256

CBC1265083 (Exp: 08/31/2026) 813-917-1689

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426
CHASE RANDOLPH MASSEY
Status Location Address State License Number Phone
ACTIVE

10048 103RD ST

JACKSONVILLE, FL 32210

CCC1332486 (Exp: 08/31/2026) 904-248-1133

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 12/03/2025 APPROVED FSLADISH
Note: 12/3/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 12/03/2025 APPROVED FSLADISH
Note: 12/4/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 11/24/2025 FINAL APPROVED BHAINES
U-CROSS CONNECTION 11/24/2025 APPROVED - AS NOTED BHAINES
Note: No CC, IRR with potable water, IRR meter installed.
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/20/2025 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 11/20/2025 APPROVED FSLADISH
Note: 11/20/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
BLD - BUILDING FINAL 11/18/2025 FINAL APPROVED BTAYLOR
ELECTRIC - EARLY POWER 10/28/2025 APPROVED - AS NOTED BTAYLOR
Note: 10-28-25 1. Emailed FPL at 11:00. 10/27/2025 - PREVIOUS INSPECTION NOTES 10-27-25 1. Lights in stairway are not safed off. Inspector Notes from Inspection 2200 9-5-25 1. Emailed FPL at 9:22. 9/2/2025 - PREVIOUS INSPECTION NOTES 9-2-25 1. No work has been done.
ELECTRIC - EARLY POWER 10/27/2025 Disapproved - NO FEE BTAYLOR
Note: 10-27-25 1. Lights in stairway are not safed off. Inspector Notes from Inspection 2200 9-5-25 1. Emailed FPL at 9:22. 9/2/2025 - PREVIOUS INSPECTION NOTES 9-2-25 1. No work has been done.
ROW- PRE-APRON (PRE-POUR) 10/15/2025 APPROVED FSLADISH
Note: 10/15/25 BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. NO EXPANSION JOINTS ALLOWED, THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
INSULATION 09/24/2025 APPROVED BTAYLOR
Note: 9/23/2025 - PREVIOUS INSPECTION NOTES 1. Multiple TP penetration on first floor need to be firestoped (thru bolts, miss drills, plumbing and electric).FBC R302.11(1.2) 2. 2nd floor MEP floor Penetrations need to be firestopped. FBC R302.11(1.2) 3. Air baffles at Batt insulation need repaired, terminate at the exterior wall line to not impede air flow. FBC R402.2.3/ FBC R806.3 9/22/2025 - PREVIOUS INSPECTION NOTES
INSULATION 09/23/2025 Disapproved -FEE REQUIRED JSTEWART
Note: 1. Multiple TP penetration on first floor need to be firestoped (thru bolts, miss drills, plumbing and electric).FBC R302.11(1.2) 2. 2nd floor MEP floor Penetrations need to be firestopped. FBC R302.11(1.2) 3. Air baffles at Batt insulation need repaired, terminate at the exterior wall line to not impede air flow. FBC R402.2.3/ FBC R806.3 9/22/2025 - PREVIOUS INSPECTION NOTES
GRAVITY SEWER TEST 09/23/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 09/23/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 09/22/2025 CANCELLED BY APPLICANT BTAYLOR
ALL ROUGH 09/17/2025 APPROVED BTAYLOR
Note: 9/15/2025 - PREVIOUS INSPECTION NOTES 9-15-25 1. Wires in panel are not phased out. 2. Bedroom bath fans missing plastic gromet. 3. Missing circulation air duct from entry hall to utility. 4. No water pressure. 5. Rear slider not installed. 6. Window upstairs not installed. 7. All window openings are to large.****** 8. Termite treatment not posted.
ALL ROUGH 09/15/2025 Disapproved - NO FEE BTAYLOR
Note: 9-15-25 1. Wires in panel are not phased out. 2. Bedroom bath fans missing plastic gromet. 3. Missing circulation air duct from entry hall to utility. 4. No water pressure. 5. Rear slider not installed. 6. Window upstairs not installed. 7. All window openings are to large.****** 8. Termite treatment not posted.
ROOF VALLEY & METAL 09/10/2025 APPROVED MCONTRYMAN
LATH/BRICK/ WATER BARRIER 09/09/2025 APPROVED BTAYLOR
ELECTRIC-TUG 09/05/2025 APPROVED - AS NOTED BTAYLOR
Note: 9-5-25 1. Emailed FPL at 9:22. 9/2/2025 - PREVIOUS INSPECTION NOTES 9-2-25 1. No work has been done.
ELECTRIC-TUG 09/02/2025 Disapproved - NO FEE BTAYLOR
Note: 9-2-25 1. No work has been done.
WALL SHEATHING 09/02/2025 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/02/2025 APPROVED BTAYLOR
MONOLITHIC SLAB 07/30/2025 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 07/24/2025 APPROVED MCONTRYMAN
FORMBOARD SURVEY (OFFICE USE ONLY) 07/23/2025 APPROVED RRICKS
WATER METER INSTALLATION REQUEST 07/09/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 09/19/2025 09/23/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/22/2025 07/23/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 07/22/2025 07/22/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BADMIN COMPLETE 06/18/2025 06/26/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 06/18/2025 06/26/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 06/18/2025 06/27/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 06/18/2025 06/23/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/18/2025 06/23/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 06/18/2025 06/24/2025
LOCATE COMPLETE 06/18/2025 06/24/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/18/2025 06/24/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/18/2025 06/18/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 06/18/2025 06/24/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 11/19/2025
FC IMPACT FEE EMS ¤62.00 07/03/2025
IMPACT FEE FIRE ¤434.51 07/03/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/03/2025
FC IMPACT FEE LIBRARY ¤268.00 07/03/2025
IMPACT FEE PARKS ¤1,828.01 07/03/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 07/03/2025
WATER METER W/OUT TAP ¤965.03 07/03/2025
SURCHARGE FS 533.721 ¤19.71 07/03/2025
SURCHARGE - FS 468.631 ¤29.57 07/03/2025
SW ENG - FOUNDATION SURVEY ¤20.00 07/03/2025
SW ENG INSPECTION 80 ¤80.00 07/03/2025
SW ENG PRE APRON ¤30.00 07/03/2025
SW ENG - REVIEW 20 ¤20.00 07/03/2025
SW ENG RES REVIEW 200 ¤200.00 07/03/2025
WASTEWATER PERM INSPECTION ¤80.00 07/03/2025
WASTEWATER PERM REVIEW ¤25.00 07/03/2025
SEWER CAPITAL FACILITY ¤3,613.92 07/03/2025
WATER CAPITAL FACILITY FEE ¤3,039.48 07/03/2025
WATER PERMIT INSPECTION ¤40.00 07/03/2025
WATER PERMIT REVIEW ¤25.00 07/03/2025
SITE PLAN 30 ¤30.00 07/03/2025
WATER-METER ¤965.03 07/03/2025
WATER- TURN ON ¤50.00 07/03/2025
WATER- TURN ON ¤50.00 07/03/2025
ADJUSTMENT 10% (¤219.04) 07/03/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/03/2025
INSPECTION - RESIDENTIAL ¤1,683.00 07/03/2025
PLAN REVIEW - RESIDENTIAL ¤477.36 07/03/2025
Fees Total Due: ¤0.00 Total Paid: ¤17,606.58