Permit #2025060819
Permit Details
Status: COED
| Parcel Id: 03-12-31-1126-00000-2550 |
| CONDITIONED SPACE: 2746 sqft |
| GARAGE: 600 sqft |
| OPENED PORCH (WITH ROOF) : 155 sqft |
| OPENED PORCH (WITH ROOF) : 384 sqft |
| Total Square Footage: 3885 sqft |
| Subdivision: 2344 - COLBERT LANDINGS PH 2 |
| Job Phone: 813-917-1689 |
| Location Address: 114 ARMOYAN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/10/2025 |
| NOC: RECORDED |
| Applicant name: SCOTT EVAN KEUNING |
| Owner: TAYLOR MORRISON OF FLORIDA INC |
|
Address 1275 W GRANADA BLVD ORMOND BEACH, FL 32174 |
|
Address SUITE 3B ORMOND BEACH, FL 32174 |
| Lot: 255 |
| Contracted Stated Job Value: ¤242,301.00 |
| Job Description: new single family |
| Type: CN |
Contractor
TAYLOR MORRISON OF FLORIDA INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7785 BAY MEADOWS WAY, SUITE 105 JACKSONVILLE, FL 32256 |
CBC1265083 (Exp: 08/31/2026) | 813-917-1689 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
BENJAMIN MICHAEL RAY
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
6310 MABLETON PKWY JACKSONVILLE, FL 32216 |
SUITE 1000 MABLETON, GA 30126 |
CFC1428415 (Exp: 08/31/2026) | 904-861-5421 | 904-861-5426 |
CHASE RANDOLPH MASSEY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10048 103RD ST JACKSONVILLE, FL 32210 |
CCC1332486 (Exp: 08/31/2026) | 904-248-1133 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 12/08/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR with potable water, IRR meter installed. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/08/2025 | FINAL APPROVED | BHAINES |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/05/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 12/4/2025 - PREVIOUS INSPECTION NOTES 12/4/2025= This permit was issued in July. Please remember that the Lot Grading Certification must be submitted along with the Final Survey. Both documents are required for the final approval process | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/05/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 12/05/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 12/05/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/04/2025 | Disapproved - NO FEE | GBERTOLA |
| Note: 12/4/2025= This permit was issued in July. Please remember that the Lot Grading Certification must be submitted along with the Final Survey. Both documents are required for the final approval process | |||
| BLD - BUILDING FINAL | 11/26/2025 | FINAL APPROVED | BTAYLOR |
| ROW- PRE-APRON (PRE-POUR) | 11/07/2025 | APPROVED | FSLADISH |
| Note: 11/7/25 BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ELECTRIC - EARLY POWER | 10/31/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10-31-25 1. Emailed FPL at 9:55. 10/27/2025 - PREVIOUS INSPECTION NOTES 10-27-25 1. No light in master water closet. Inspector Notes from Inspection 2200 9-3-25 1. Emailed FPL at 10:40. | |||
| ELECTRIC - EARLY POWER | 10/27/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 10-27-25 1. No light in master water closet. Inspector Notes from Inspection 2200 9-3-25 1. Emailed FPL at 10:40. | |||
| GRAVITY SEWER TEST | 09/23/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THI WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 09/23/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 09/19/2025 | APPROVED | BTAYLOR |
| Note: 9/18/2025 - PREVIOUS INSPECTION NOTES Please insulate the margins of the Sliding glass door. R402.4.1 Building thermal envelope. / TABLE R402.4.1.1AIR BARRIER AND INSULATION INSTALLATIONa 9/11/2025 - PREVIOUS INSPECTION NOTES 9-11-25 1. Rear slider not installed. Inspector Notes from Inspection 2420 9-3-25 1. Hole in electrical panel needs to have steel plug. 2. Rear slider not installed. | |||
| INSULATION | 09/18/2025 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: Please insulate the margins of the Sliding glass door. R402.4.1 Building thermal envelope. / TABLE R402.4.1.1AIR BARRIER AND INSULATION INSTALLATIONa 9/11/2025 - PREVIOUS INSPECTION NOTES 9-11-25 1. Rear slider not installed. Inspector Notes from Inspection 2420 9-3-25 1. Hole in electrical panel needs to have steel plug. 2. Rear slider not installed. | |||
| INSULATION | 09/11/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 9-11-25 1. Rear slider not installed. Inspector Notes from Inspection 2420 9-3-25 1. Hole in electrical panel needs to have steel plug. 2. Rear slider not installed. | |||
| ALL ROUGH | 09/03/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9-3-25 1. Hole in electrical panel needs to have steel plug. 2. Rear slider not installed. | |||
| ELECTRIC-TUG | 09/03/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9-3-25 1. Emailed FPL at 10:40. | |||
| LATH/BRICK/ WATER BARRIER | 08/25/2025 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 08/22/2025 | APPROVED | MCONTRYMAN |
| WALL SHEATHING | 08/20/2025 | APPROVED | MCONTRYMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/20/2025 | APPROVED | MCONTRYMAN |
| MONOLITHIC SLAB | 07/29/2025 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/24/2025 | APPROVED | MCONTRYMAN |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 07/23/2025 | APPROVED | RRICKS |
| WATER METER INSTALLATION REQUEST | 07/14/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/17/2025 | 07/23/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/17/2025 | 07/17/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/02/2025 | 07/02/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/02/2025 | 07/07/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/02/2025 | 07/07/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 06/24/2025 | 07/02/2025 |
| Note: Released By: MATTHEW SIERRA - (386)286-2002 - MSIERRA@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/18/2025 | 06/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/18/2025 | 06/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/18/2025 | 06/27/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/18/2025 | 06/23/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/18/2025 | 06/23/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/18/2025 | 06/24/2025 |
| LOCATE | COMPLETE | 06/18/2025 | 06/24/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/18/2025 | 06/24/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/18/2025 | 06/25/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/18/2025 | 06/24/2025 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM MISSING BOOK/PAGE ON SITE PLAN |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/09/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 07/10/2025 |
| IMPACT FEE FIRE | ¤434.51 | 07/10/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/10/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/10/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 07/10/2025 |
| IMPACT FEE TRANSPORTATION | ¤3,502.00 | 07/10/2025 |
| WATER METER W/OUT TAP | ¤965.03 | 07/10/2025 |
| SURCHARGE FS 533.721 | ¤17.24 | 07/10/2025 |
| SURCHARGE - FS 468.631 | ¤25.85 | 07/10/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/10/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/10/2025 |
| SW ENG PRE APRON | ¤30.00 | 07/10/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/10/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/10/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 07/10/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 07/10/2025 |
| SEWER CAPITAL FACILITY | ¤3,613.92 | 07/10/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,039.48 | 07/10/2025 |
| WATER PERMIT INSPECTION | ¤40.00 | 07/10/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 07/10/2025 |
| SITE PLAN 30 | ¤30.00 | 07/10/2025 |
| WATER-METER | ¤965.03 | 07/10/2025 |
| WATER- TURN ON | ¤50.00 | 07/10/2025 |
| WATER- TURN ON | ¤50.00 | 07/10/2025 |
| ADJUSTMENT 10% | (¤191.50) | 07/10/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/10/2025 |
| INSPECTION - RESIDENTIAL | ¤1,468.50 | 07/10/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤416.52 | 07/10/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,352.59 |