I want to search for...

Permit #2025061147

Permit Details

Status: FINAL

Parcel Id: 07-11-31-0000-01020-0005
CONDITIONED SPACE: 154 sqft
GARAGE: 655 sqft
COMMERCIAL SQUARE FOOTAGE: 362 sqft
Total Square Footage: 1171 sqft
Block: 01020
Subdivision: -
Job Phone: 386-237-0328
Location Address: 39 OLD KINGS RD N
Type: CA - COMM ADDITION
Issue Date: 09/09/2025
NOC: RECORDED
Applicant name: JAMES JOSEPH ALBANO
Owner: CLYMER RED HORSE LLC

Address

500 CANOPY WALK LN

PALM COAST, FL 32137

Address

APT 511

PALM COAST, FL 32137

Lot: 0005
Contracted Stated Job Value: ¤100,000.00
Job Description: CLYMER FUNERAL HOME ADDITION TO EXISTING COMMERCIAL STRUCTURE
Type: CN

Contractor

ALBANO DESIGNS STUDIOS, INC
Status Location Address State License Number Phone
ACTIVE

82 LEE DR

PALM COAST, FL 32137

CBC050078 (Exp: 08/31/2026) 386-237-0328

Sub Contractors

SCOTT DALE CRIDER
Status Location Address State License Number Phone
ACTIVE

PO BOX 353092

PALM COAST, FL 32137

CCC1333991 (Exp: 08/31/2026) 386-276-0758
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688

Inspection History

Type Request Date Result Inspector
FIRE FINAL 03/27/2026 APPROVED RMARTIN
Note: 3/25/2026 - PREVIOUS INSPECTION NOTES Need certified fire extinguisher in location per approved plan.
ELECTRIC FINAL 03/26/2026 APPROVED - AS NOTED RMARTIN
Note: 3/25/26 Did this on Fire Final on 3/25/26 3/24/2026 - PREVIOUS INSPECTION NOTES MOCP on mini split is 15A on the outside name plate, there is a 30A installed in panel NEC 440.22.., 4" square cover missing on box in attic storage area. Also will need to add exit/emergency over glass door in meeting room by Fire Final inspection.
U - UTILITY COMMERCIAL FINAL 03/25/2026 APPROVED BHAINES
BUILDING FINAL 03/25/2026 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 3470 All hard ceiling, got in attic with hugo
FIRE FINAL 03/25/2026 Disapproved - NO FEE RMARTIN
Note: Need certified fire extinguisher in location per approved plan.
ABOVE CEILING 03/24/2026 APPROVED - AS NOTED RMARTIN
Note: All hard ceiling, got in attic with hugo
HVAC FINAL 03/24/2026 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 3140 Installing Mini split in the storage area. Ceiling has R30 batt insulation.
ELECTRIC FINAL 03/24/2026 Disapproved - NO FEE RMARTIN
Note: MOCP on mini split is 15A on the outside name plate, there is a 30A installed in panel NEC 440.22.., 4" square cover missing on box in attic storage area. Also will need to add exit/emergency over glass door in meeting room by Fire Final inspection.
LDSC- LANDSCAPE FINAL 03/20/2026 APPROVED RPICATAGI
ROW- PROJECT STATUS 02/18/2026 Status Check PFLANAGAN
Note: Met grader and told them to build as proposed elevation from the new addtion to the front road ditch along Old Kings Rd
BUILDING OTHER 02/18/2026 CANCELLED BY INSPECTOR HCAMACHO
Note: Grading is not part of the Building Department
BUILDING OTHER 02/17/2026 CANCELLED BY INSPECTOR HCAMACHO
HVAC ROUGH 12/16/2025 APPROVED - AS NOTED HCAMACHO
Note: Installing Mini split in the storage area. Ceiling has R30 batt insulation.
LATH/BRICK/WATER BARRIER 12/10/2025 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 3463 Inspector Notes from Inspection 3510 1. When doing the Insulation inspection I noticed that a new line set was added for a new MiniSlpit system in the storage room. This system is not in the plans. FBC [A]107.4 -New energy calcs need to be submitted along with revised plans showing this new system being added. -This new paper work needs to be in and approved by the City when HVAC Rough inspection is called in. - Do not cover the ceiling and outside wall where the new line set is being run. - The new line set needs nail plates where it is being run down the top plate on the block wall. Notes- Celing has R30 batts insualtion installed, and the frame walls have R13.
ROOF VALLEY & METAL 12/08/2025 APPROVED - AS NOTED HCAMACHO
Note: Inspector Notes from Inspection 3510 1. When doing the Insulation inspection I noticed that a new line set was added for a new MiniSlpit system in the storage room. This system is not in the plans. FBC [A]107.4 -New energy calcs need to be submitted along with revised plans showing this new system being added. -This new paper work needs to be in and approved by the City when HVAC Rough inspection is called in. - Do not cover the ceiling and outside wall where the new line set is being run. - The new line set needs nail plates where it is being run down the top plate on the block wall. Notes- Celing has R30 batts insualtion installed, and the frame walls have R13.
INSULATION 12/04/2025 APPROVED - AS NOTED HCAMACHO
Note: 1. When doing the Insulation inspection I noticed that a new line set was added for a new MiniSlpit system in the storage room. This system is not in the plans. FBC [A]107.4 -New energy calcs need to be submitted along with revised plans showing this new system being added. -This new paper work needs to be in and approved by the City when HVAC Rough inspection is called in. - Do not cover the ceiling and outside wall where the new line set is being run. - The new line set needs nail plates where it is being run down the top plate on the block wall. Notes- Celing has R30 batts insualtion installed, and the frame walls have R13.
FRAMING 12/01/2025 APPROVED KSANDOE
ROOF SHEATHING / BRACE / TIE DOWN 12/01/2025 APPROVED KSANDOE
Note: Checked window nailing also
ELECTRIC 2ND ROUGH 12/01/2025 APPROVED RMARTIN
LINTEL 11/06/2025 APPROVED HCAMACHO
FORMBOARD SURVEY 10/27/2025 APPROVED DLEAP
MONOLITHIC SLAB 10/20/2025 APPROVED KSANDOE
Note: 10/17/2025 - PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 10/17/2025 CANCELLED BY APPLICANT KSANDOE
GEO TECH CERTIFICATION 10/17/2025 APPROVED JMUNSON

Review History

Department Status Date In Date Out
PLENG COMPLETE 03/19/2026 03/19/2026
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
MECH COMPLETE 02/12/2026 02/19/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 12/22/2025 12/22/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans need to be uploaded separately AHJ
MECH HOLD 12/15/2025 12/15/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans need to be uploaded separately and have a verifiable digital signature. F.S. 471.025, AHJ
MECH HOLD 12/12/2025 12/15/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Revise plans to show minisplit in storage. Are you still using exhaust fan in the storage room? Also revise electrical drawings.
BLD COMPLETE 11/17/2025 11/24/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLENG COMPLETE 11/10/2025 11/10/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
BLD COMPLETE 10/17/2025 10/17/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 09/25/2025 09/26/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLENG COMPLETE 08/29/2025 09/02/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
MECH COMPLETE 08/29/2025 09/09/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
FI1 COMPLETE 08/29/2025 09/04/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 08/29/2025 09/09/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLENG HOLD 08/07/2025 08/11/2025
Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. REPEAT COMMENT: How will the area between the proposed addition and the existing metal building and the proposed building and the north property line drain? Minimum slope is 5% for 10' perpendicular to the building per the Florida Building Code. 2. REPEAT COMMENT: Based on the proposed grades and the existing grades, it appears that the parking area will drain toward the proposed building addition. Review and revise accordingly.
DSD COMPLETE 08/07/2025 08/08/2025
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
MECH HOLD 08/07/2025 08/15/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM ALL COMMENTS FROM THE FBC BUILDING, FBC MECHANICAL, FBC EXISTING BUILDING, AND FBC ENERGY CONSERVATION 2023. PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. ok 2. ok REPEAT COMMENT: 3. Provide Ventilation calculation per Table 403.3.1.1 FBC Mechanical 2023. Provide minimum ventilation for garage. (NO VENTILATION CALCULATION OR VENTILATION FOR GARAGE. NO RESPONSE LETTER SUBMITTED.) REPEAT COMMENT: 4. Provide duct layout showing return ,supply and exhaust for office area and garage with any proposed changes. 107.2.1 (NO DUCTWORK PLAN OR EXHAUST PLAN SUBMITTED. NO RESPONSE LETTER SUBMITTED) 5. ok
FI1 HOLD 08/07/2025 08/18/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. NFPA 13 is wrong code year. Needs to be 2019 2. NEC coe year is wrong. needs to be 2020
ARCHR COMPLETE 08/07/2025 08/21/2025
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD HOLD 08/07/2025 08/18/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM REPEAT COMMENT: 1. All Plan pages need to have a verifiable digital signature F.S.471.025( PLAN PAGES UPLOADED DO NOT HAVE A DIGITAL VERIFIABLE SIGNATURE) REPEAT COMMENT: 14. Soffit dimension is over 12 inches, Provide intermediate nailing strip 1410.3 FBC Building (NO INTERMEDIATE NAILING STRIP SHOWN)
ARCHR HOLD 06/25/2025 07/10/2025
Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM 1. Provide exterior Elevations for all facades. 2. Provde schedule of exterior colors including Mfr color name, codednumber and LRV
BLD HOLD 06/25/2025 07/10/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA BUILDING CODE-EXISTING BUILDING (FBCEB), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. All Plan pages need to have a verifiable digital signature F.S.471.025 2. Revise structural data and remove reference to FBC R. 3. Need to reference FBC Building 2023, FBC Accessibility, FBC Mechanical 2023, FBC Energy Conservation 2023, FBC Existing Building 2023 and ASCE 7-22 in Code analysis 4. Provide code analysis showing correct occupancy classifications, allowable area, actual area, building construction type, Fire protection systems if any, etc.. 302.1, 503, 506, 602.1, table 601, 903, Chapters 3-6 and 9. FBC Building 5. In general framing notes remove all reference to IBC and IRC. Notes need to reference. FBC 6. Provide occupant load per 1004 FBC Building 7. Provide means of egress, egress sizing, accessible means of egress etc..1006, 1009, 1010 FBC Building 8. Provide means of exit from garage to exit discharge 1022 FBC Building 9. Provide interior finish for the storage room. Needs to meet the flame spread 803, 803.11, table 803.11 FBC Building 10. Provide accessible route from storage room to exit discharge. Include walking surfaces width, approach to door, maneuvering clearances etc. 402, 403, 404, 404.2.4, table 404.2.4 FBC Accessibility 11. Provide door hardware and height for accessible exit door 404.2.7 FBC Accessibility 12. If using any ramps, provide cross slope, running slope, width, ramp rise, and landing dimensions. 405 FBC Accessibility 13. Provide source of design load-bearing values of soil. If from a site specific geotechnical investigation then site Report Project Number, Date of Report and Engineering Firm that completed report. If no report, provide geotechnical investigation report. After the geotechnical report is approved by the City of Palm Coast, then the engineer must provide a signed and sealed letter certifying the entire process was completed in accordance with the engineer’s specifications. The engineer’s letter must include a certification statement in accordance with the Florida Administrative Code 61G15-18.011 (4). AHJ 14. Soffit dimension is over 12 inches, Provide intermediate nailing strip 1410.3 FBC Building 15. Provide roof dead loads 1607.13 FBC Building 16. Provide life safety plan 107.2.1 FBC Building
DSD HOLD 06/25/2025 06/27/2025
Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Provide a color and material sheet for wall and roof.
ELEC COMPLETE 06/25/2025 07/10/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 HOLD 06/25/2025 07/10/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Provide code analysis showing correct occupancy classifications, allowable area, actual area, building construction type, Fire protection systems if any, etc.. 302.1, 503, 506, 602.1, table 601, 903, Chapters 3-6 and 9. 2. Classify hazards being stored. FFPC 8th edition.
MECH HOLD 06/25/2025 07/09/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM ALL COMMENTS FROM THE FBC BUILDING, FBC MECHANICAL, FBC EXISTING BUILDING, AND FBC ENERGY CONSERVATION 2023. PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Provide Energy Calculations per C407 FBC Energy Conservation 2023 2. Provide Heatload Calculation per C403.2.1 FBC Energy Conservation 2023 3. Provide Ventilation calculation per Table 403.3.1.1 FBC Mechanical 2023. Provide minimum ventilation for garage. 4. Provide duct layout showing return ,supply and exhaust for office area and garage with any proposed changes. 107.2.1 5. List mechanical subcontractor
PLENG HOLD 06/25/2025 06/25/2025
Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. How will the area between the proposed addition and the existing metal building and the proposed building and the north property line drain? Minimum slope is 5% for 10' perpendicular to the building per the Florida Building Code. 2. Based on the proposed grades and the existing grades, it appears that the parking area will drain toward the proposed building addition. Review and revise accordingly.
PLUM CANCEL 06/25/2025 07/03/2025
UD1 COMPLETE 06/25/2025 06/26/2025
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤89.00) 09/09/2025
ADMINISTRATIVE - COMMERCIAL ¤75.00 09/09/2025
INSPECTION COMMERCIAL ¤700.00 09/09/2025
PLAN REVIEW - COMMERCIAL ¤115.00 09/09/2025
CONTRACTOR CHANGE ¤20.00 09/09/2025
IMPACT FEE FIRE ¤711.90 09/09/2025
IMPACT FEE TRANSPORTATION ¤511.55 09/09/2025
SURCHARGE FS 533.721 ¤8.01 09/09/2025
SURCHARGE - FS 468.631 ¤12.02 09/09/2025
SW ENG REVIEW- 40 ¤40.00 09/09/2025
SITE PLAN 30 ¤30.00 09/09/2025
PLAN REVIEW - REVISION ¤32.50
Fees Total Due: ¤32.50 Total Paid: ¤2,134.48