I want to search for...
Permit #2025061147
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-0000-01020-0005 |
| CONDITIONED SPACE: 154 sqft |
| GARAGE: 655 sqft |
| COMMERCIAL SQUARE FOOTAGE: 362 sqft |
| Total Square Footage: 1171 sqft |
| Block: 01020 |
| Subdivision: - |
| Job Phone: 386-237-0328 |
| Location Address: 39 OLD KINGS RD N |
| Type: CA - COMM ADDITION |
| Issue Date: 09/09/2025 |
| NOC: RECORDED |
| Applicant name: JAMES JOSEPH ALBANO |
| Owner: CLYMER RED HORSE LLC |
|
Address 500 CANOPY WALK LN PALM COAST, FL 32137 |
|
Address APT 511 PALM COAST, FL 32137 |
| Lot: 0005 |
| Contracted Stated Job Value: ¤100,000.00 |
| Job Description: CLYMER FUNERAL HOME ADDITION TO EXISTING COMMERCIAL STRUCTURE |
| Type: CN |
Contractor
ALBANO DESIGNS STUDIOS, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
82 LEE DR PALM COAST, FL 32137 |
CBC050078 (Exp: 08/31/2026) | 386-237-0328 |
Sub Contractors
SCOTT DALE CRIDER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 353092 PALM COAST, FL 32137 |
CCC1333991 (Exp: 08/31/2026) | 386-276-0758 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
Inspection History
| Type | Request Date | Result | Inspector |
| FIRE FINAL | 03/27/2026 | APPROVED | RMARTIN |
| Note: 3/25/2026 - PREVIOUS INSPECTION NOTES Need certified fire extinguisher in location per approved plan. | |||
| ELECTRIC FINAL | 03/26/2026 | APPROVED - AS NOTED | RMARTIN |
| Note: 3/25/26 Did this on Fire Final on 3/25/26 3/24/2026 - PREVIOUS INSPECTION NOTES MOCP on mini split is 15A on the outside name plate, there is a 30A installed in panel NEC 440.22.., 4" square cover missing on box in attic storage area. Also will need to add exit/emergency over glass door in meeting room by Fire Final inspection. | |||
| U - UTILITY COMMERCIAL FINAL | 03/25/2026 | APPROVED | BHAINES |
| BUILDING FINAL | 03/25/2026 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 3470 All hard ceiling, got in attic with hugo | |||
| FIRE FINAL | 03/25/2026 | Disapproved - NO FEE | RMARTIN |
| Note: Need certified fire extinguisher in location per approved plan. | |||
| ABOVE CEILING | 03/24/2026 | APPROVED - AS NOTED | RMARTIN |
| Note: All hard ceiling, got in attic with hugo | |||
| HVAC FINAL | 03/24/2026 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 3140 Installing Mini split in the storage area. Ceiling has R30 batt insulation. | |||
| ELECTRIC FINAL | 03/24/2026 | Disapproved - NO FEE | RMARTIN |
| Note: MOCP on mini split is 15A on the outside name plate, there is a 30A installed in panel NEC 440.22.., 4" square cover missing on box in attic storage area. Also will need to add exit/emergency over glass door in meeting room by Fire Final inspection. | |||
| LDSC- LANDSCAPE FINAL | 03/20/2026 | APPROVED | RPICATAGI |
| ROW- PROJECT STATUS | 02/18/2026 | Status Check | PFLANAGAN |
| Note: Met grader and told them to build as proposed elevation from the new addtion to the front road ditch along Old Kings Rd | |||
| BUILDING OTHER | 02/18/2026 | CANCELLED BY INSPECTOR | HCAMACHO |
| Note: Grading is not part of the Building Department | |||
| BUILDING OTHER | 02/17/2026 | CANCELLED BY INSPECTOR | HCAMACHO |
| HVAC ROUGH | 12/16/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Installing Mini split in the storage area. Ceiling has R30 batt insulation. | |||
| LATH/BRICK/WATER BARRIER | 12/10/2025 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 3463 Inspector Notes from Inspection 3510 1. When doing the Insulation inspection I noticed that a new line set was added for a new MiniSlpit system in the storage room. This system is not in the plans. FBC [A]107.4 -New energy calcs need to be submitted along with revised plans showing this new system being added. -This new paper work needs to be in and approved by the City when HVAC Rough inspection is called in. - Do not cover the ceiling and outside wall where the new line set is being run. - The new line set needs nail plates where it is being run down the top plate on the block wall. Notes- Celing has R30 batts insualtion installed, and the frame walls have R13. | |||
| ROOF VALLEY & METAL | 12/08/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Inspector Notes from Inspection 3510 1. When doing the Insulation inspection I noticed that a new line set was added for a new MiniSlpit system in the storage room. This system is not in the plans. FBC [A]107.4 -New energy calcs need to be submitted along with revised plans showing this new system being added. -This new paper work needs to be in and approved by the City when HVAC Rough inspection is called in. - Do not cover the ceiling and outside wall where the new line set is being run. - The new line set needs nail plates where it is being run down the top plate on the block wall. Notes- Celing has R30 batts insualtion installed, and the frame walls have R13. | |||
| INSULATION | 12/04/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. When doing the Insulation inspection I noticed that a new line set was added for a new MiniSlpit system in the storage room. This system is not in the plans. FBC [A]107.4 -New energy calcs need to be submitted along with revised plans showing this new system being added. -This new paper work needs to be in and approved by the City when HVAC Rough inspection is called in. - Do not cover the ceiling and outside wall where the new line set is being run. - The new line set needs nail plates where it is being run down the top plate on the block wall. Notes- Celing has R30 batts insualtion installed, and the frame walls have R13. | |||
| FRAMING | 12/01/2025 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACE / TIE DOWN | 12/01/2025 | APPROVED | KSANDOE |
| Note: Checked window nailing also | |||
| ELECTRIC 2ND ROUGH | 12/01/2025 | APPROVED | RMARTIN |
| LINTEL | 11/06/2025 | APPROVED | HCAMACHO |
| FORMBOARD SURVEY | 10/27/2025 | APPROVED | DLEAP |
| MONOLITHIC SLAB | 10/20/2025 | APPROVED | KSANDOE |
| Note: 10/17/2025 - PREVIOUS INSPECTION NOTES | |||
| MONOLITHIC SLAB | 10/17/2025 | CANCELLED BY APPLICANT | KSANDOE |
| GEO TECH CERTIFICATION | 10/17/2025 | APPROVED | JMUNSON |
Review History
| Department | Status | Date In | Date Out |
| PLENG | COMPLETE | 03/19/2026 | 03/19/2026 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/12/2026 | 02/19/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/22/2025 | 12/22/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans need to be uploaded separately AHJ | |||
| MECH | HOLD | 12/15/2025 | 12/15/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans need to be uploaded separately and have a verifiable digital signature. F.S. 471.025, AHJ | |||
| MECH | HOLD | 12/12/2025 | 12/15/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Revise plans to show minisplit in storage. Are you still using exhaust fan in the storage room? Also revise electrical drawings. | |||
| BLD | COMPLETE | 11/17/2025 | 11/24/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 11/10/2025 | 11/10/2025 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/17/2025 | 10/17/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 09/25/2025 | 09/26/2025 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 08/29/2025 | 09/02/2025 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/29/2025 | 09/09/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 08/29/2025 | 09/04/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/29/2025 | 09/09/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLENG | HOLD | 08/07/2025 | 08/11/2025 |
| Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. REPEAT COMMENT: How will the area between the proposed addition and the existing metal building and the proposed building and the north property line drain? Minimum slope is 5% for 10' perpendicular to the building per the Florida Building Code. 2. REPEAT COMMENT: Based on the proposed grades and the existing grades, it appears that the parking area will drain toward the proposed building addition. Review and revise accordingly. | |||
| DSD | COMPLETE | 08/07/2025 | 08/08/2025 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/07/2025 | 08/15/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM ALL COMMENTS FROM THE FBC BUILDING, FBC MECHANICAL, FBC EXISTING BUILDING, AND FBC ENERGY CONSERVATION 2023. PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. ok 2. ok REPEAT COMMENT: 3. Provide Ventilation calculation per Table 403.3.1.1 FBC Mechanical 2023. Provide minimum ventilation for garage. (NO VENTILATION CALCULATION OR VENTILATION FOR GARAGE. NO RESPONSE LETTER SUBMITTED.) REPEAT COMMENT: 4. Provide duct layout showing return ,supply and exhaust for office area and garage with any proposed changes. 107.2.1 (NO DUCTWORK PLAN OR EXHAUST PLAN SUBMITTED. NO RESPONSE LETTER SUBMITTED) 5. ok | |||
| FI1 | HOLD | 08/07/2025 | 08/18/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. NFPA 13 is wrong code year. Needs to be 2019 2. NEC coe year is wrong. needs to be 2020 | |||
| ARCHR | COMPLETE | 08/07/2025 | 08/21/2025 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/07/2025 | 08/18/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM REPEAT COMMENT: 1. All Plan pages need to have a verifiable digital signature F.S.471.025( PLAN PAGES UPLOADED DO NOT HAVE A DIGITAL VERIFIABLE SIGNATURE) REPEAT COMMENT: 14. Soffit dimension is over 12 inches, Provide intermediate nailing strip 1410.3 FBC Building (NO INTERMEDIATE NAILING STRIP SHOWN) | |||
| ARCHR | HOLD | 06/25/2025 | 07/10/2025 |
| Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM 1. Provide exterior Elevations for all facades. 2. Provde schedule of exterior colors including Mfr color name, codednumber and LRV | |||
| BLD | HOLD | 06/25/2025 | 07/10/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA BUILDING CODE-EXISTING BUILDING (FBCEB), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. All Plan pages need to have a verifiable digital signature F.S.471.025 2. Revise structural data and remove reference to FBC R. 3. Need to reference FBC Building 2023, FBC Accessibility, FBC Mechanical 2023, FBC Energy Conservation 2023, FBC Existing Building 2023 and ASCE 7-22 in Code analysis 4. Provide code analysis showing correct occupancy classifications, allowable area, actual area, building construction type, Fire protection systems if any, etc.. 302.1, 503, 506, 602.1, table 601, 903, Chapters 3-6 and 9. FBC Building 5. In general framing notes remove all reference to IBC and IRC. Notes need to reference. FBC 6. Provide occupant load per 1004 FBC Building 7. Provide means of egress, egress sizing, accessible means of egress etc..1006, 1009, 1010 FBC Building 8. Provide means of exit from garage to exit discharge 1022 FBC Building 9. Provide interior finish for the storage room. Needs to meet the flame spread 803, 803.11, table 803.11 FBC Building 10. Provide accessible route from storage room to exit discharge. Include walking surfaces width, approach to door, maneuvering clearances etc. 402, 403, 404, 404.2.4, table 404.2.4 FBC Accessibility 11. Provide door hardware and height for accessible exit door 404.2.7 FBC Accessibility 12. If using any ramps, provide cross slope, running slope, width, ramp rise, and landing dimensions. 405 FBC Accessibility 13. Provide source of design load-bearing values of soil. If from a site specific geotechnical investigation then site Report Project Number, Date of Report and Engineering Firm that completed report. If no report, provide geotechnical investigation report. After the geotechnical report is approved by the City of Palm Coast, then the engineer must provide a signed and sealed letter certifying the entire process was completed in accordance with the engineer’s specifications. The engineer’s letter must include a certification statement in accordance with the Florida Administrative Code 61G15-18.011 (4). AHJ 14. Soffit dimension is over 12 inches, Provide intermediate nailing strip 1410.3 FBC Building 15. Provide roof dead loads 1607.13 FBC Building 16. Provide life safety plan 107.2.1 FBC Building | |||
| DSD | HOLD | 06/25/2025 | 06/27/2025 |
| Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Provide a color and material sheet for wall and roof. | |||
| ELEC | COMPLETE | 06/25/2025 | 07/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | HOLD | 06/25/2025 | 07/10/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Provide code analysis showing correct occupancy classifications, allowable area, actual area, building construction type, Fire protection systems if any, etc.. 302.1, 503, 506, 602.1, table 601, 903, Chapters 3-6 and 9. 2. Classify hazards being stored. FFPC 8th edition. | |||
| MECH | HOLD | 06/25/2025 | 07/09/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM ALL COMMENTS FROM THE FBC BUILDING, FBC MECHANICAL, FBC EXISTING BUILDING, AND FBC ENERGY CONSERVATION 2023. PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Provide Energy Calculations per C407 FBC Energy Conservation 2023 2. Provide Heatload Calculation per C403.2.1 FBC Energy Conservation 2023 3. Provide Ventilation calculation per Table 403.3.1.1 FBC Mechanical 2023. Provide minimum ventilation for garage. 4. Provide duct layout showing return ,supply and exhaust for office area and garage with any proposed changes. 107.2.1 5. List mechanical subcontractor | |||
| PLENG | HOLD | 06/25/2025 | 06/25/2025 |
| Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. How will the area between the proposed addition and the existing metal building and the proposed building and the north property line drain? Minimum slope is 5% for 10' perpendicular to the building per the Florida Building Code. 2. Based on the proposed grades and the existing grades, it appears that the parking area will drain toward the proposed building addition. Review and revise accordingly. | |||
| PLUM | CANCEL | 06/25/2025 | 07/03/2025 |
| UD1 | COMPLETE | 06/25/2025 | 06/26/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤89.00) | 09/09/2025 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 09/09/2025 |
| INSPECTION COMMERCIAL | ¤700.00 | 09/09/2025 |
| PLAN REVIEW - COMMERCIAL | ¤115.00 | 09/09/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 09/09/2025 |
| IMPACT FEE FIRE | ¤711.90 | 09/09/2025 |
| IMPACT FEE TRANSPORTATION | ¤511.55 | 09/09/2025 |
| SURCHARGE FS 533.721 | ¤8.01 | 09/09/2025 |
| SURCHARGE - FS 468.631 | ¤12.02 | 09/09/2025 |
| SW ENG REVIEW- 40 | ¤40.00 | 09/09/2025 |
| SITE PLAN 30 | ¤30.00 | 09/09/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| Fees | Total Due: ¤32.50 | Total Paid: ¤2,134.48 |