Permit #2025061185
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7030-00350-0230 |
| Block: 00350 |
| Subdivision: 7030 - |
| Job Phone: 386-216-9945 |
| Location Address: 19 RALE PL |
| Type: PO - POOL |
| Issue Date: 07/01/2025 |
| NOC: RECORDED |
| Applicant name: CASEY C WATSON |
| Owner: PEREZ EDGARDO JOSE FIGUEROA & SHIRLEY ANN ROSARIO |
|
Address 19 RALE PL PALM COAST, FL 32164 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤62,688.00 |
| Job Description: INGROUND FIBERGLASS SWIMMING POOL WITH SCREEN ENCLOSURE |
| Type: CN |
Contractor
EXQUISITE POOL & SPA INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3895 BRITTING DR DELAND, FL 32724 |
CPC1457932 (Exp: 08/31/2026) | 386-216-9945 |
Sub Contractors
JOHN LEROY HODGINS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2020 COUNTRY FARMS RD PORT ORANGE, FL 32128 |
CGC1507254 (Exp: 08/31/2026) | 386-547-2998 | 386-788-4028 |
JEFFREY ADAM MCGREGOR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1312 YORKTOWN STREET DELAND , FL 32724 |
EC13005662 (Exp: 08/31/2026) | 386-736-7475 | 386-785-1503 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 02/27/2026 | FINAL APPROVED | BTAYLOR |
| U -UTILITY RESIDENTIAL FINAL | 02/25/2026 | FINAL APPROVED | BWRIGHT |
| ROW - FINAL INSPECTION | 02/24/2026 | APPROVED | FSLADISH |
| Note: 2/24/26 REQUIRED CORRECTION COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ____________________________________________________________________________________________________________________________ New inspection due to canceled inspection Inspector Notes from Inspection 9465 1/29/26 MET ON SITE WITH DAVID CM AND INSPECTOR FLANAGAN AND DETERMINED THAT THE POOL BUILDER HAS MADE THE REQUIRED CORRECTIONS TO MEET COPC MINIMUM STANDARDS AT THIS TIME. BUILDER WILL NEED TO ADD SOD WHERE DISCUSSED PRIOR TO ROW FINAL PASSAGE. | |||
| ROW - FINAL INSPECTION | 02/04/2026 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 9465 1/29/26 MET ON SITE WITH DAVID CM AND INSPECTOR FLANAGAN AND DETERMINED THAT THE POOL BUILDER HAS MADE THE REQUIRED CORRECTIONS TO MEET COPC MINIMUM STANDARDS AT THIS TIME. BUILDER WILL NEED TO ADD SOD WHERE DISCUSSED PRIOR TO ROW FINAL PASSAGE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/29/2026 | APPROVED | FSLADISH |
| Note: 1/13/2026 - PREVIOUS INSPECTION NOTES 1/13/26 WENT TO SITE TO INVESTIGATE IF THIS SURVEY MATCHED FIELD CONDITIONS. IT DOES NOT. IN THE FIELD ON THE RIGHT SIDE YOU HAVE A TRENCH THAT GOES UPHILL PRIOR TO THE FRONT SIDE YARD FENCE. WATER WILL POOL HERE AND NOT HAVE POSITIVE FORWARD DRAINAGE. THE TRENCH YOU HAVE DUG DOES NOT MEET THE COPC DRAINAGE SWALE STANDARDS. IT IS A STRAIGHT DROP OFF INTO A GULLEY TRENCH. THIS AREA FROM WHERE YOU HAVE LAID SOD IN THE REAR PROPERTY ON THE RIGHT TO WHERE IT BASICALLY DOES A 90 DEGREE BEND WILL NEED TO BE CORRECTED TO COPC STANDARDS AND HAVE POSITIVE FLOW TO FRONT SWALE. THESE AREAS WILL NEED TO BE RESHOT AFTER CORRECTIONS ARE COMPLETED TO MINIMUM COPC STANDARDS. _______________________________________________________________________________________________________________________________ 12/18/2025 - PREVIOUS INSPECTION NOTES 12/18/25 YOUR SITE PLAN SHOWS YOUR DRAINAGE GOING TO REAR MIDDLE AND SPLITTING BOTH LEFT AND RIGHT TO THE FRONT SWALE. YOUR FINAL SURVEY SHOWS FLAT FROM OFF THE POOL DECK WITH NO ELEVATION SHOTS IN THE MIDDLE TO DETERMINE IF THE REQUIRED SWALE IS THERE TO DIVERT DRAINAGE AS SHOWN ON SITE PLAN. PLEASE SEE PHOTO FOR REFERENCE. The rear yard is required to drain to the front Sec 300.01 C-6 Sec 300.01 C-6=Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/29/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/29/26 MET ON SITE WITH DAVID CM AND INSPECTOR FLANAGAN AND DETERMINED THAT THE POOL BUILDER HAS MADE THE REQUIRED CORRECTIONS TO MEET COPC MINIMUM STANDARDS AT THIS TIME. BUILDER WILL NEED TO ADD SOD WHERE DISCUSSED PRIOR TO ROW FINAL PASSAGE. | |||
| ROW- PROJECT STATUS | 01/29/2026 | APPROVED | FSLADISH |
| Note: 1/29/26 MET ON SITE WITH DAVID CM AND INSPECTOR FLANAGAN AND DETERMINED THAT THE POOL BUILDER HAS MADE THE REQUIRED CORRECTIONS TO MEET COPC MINIMUM STANDARDS AT THIS TIME. _____________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 *** NOTES ADDED BY FSLADISH 1/28/2026 7:25:46 AM *** PROJECT STAUS WAS COMPLETED ON 1/27/28 AND RESULTED TODAY 1/28/26 TO ADD REQUIRED FEE. 1/28/26 MET ON SITE WITH INSPECTOR POLACEK TO REVIEW GRADE CORRECTION PER BUILDERS REQUEST. CORRECTIONS ARE STILL REQUIRED AS GRADE AND DRAINAGE DO NOT MEET COPC STANDARDS AT THIS TIME. CALLED BUILER AND ASKED HIM TO SET UP A NOTHER SITE MEET TO MOVE THIS FORWARD. _______________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 1/14/26 MET ON SITE WITH POOL BUILDER AND SHOWED HIM WAS WAS REQUIRED TO BRING DRAINAGE UP TO COPC MINIMUM STANDARDS. THEY WILL BE FIXING THE RIGHT SIDE REAR OFF OF POOL DECK TO HAVE A SWALE WITH POSITIVE FLOW TO THE FENCE. THEY ARE REQUIRED TO ADD A ROW OF SOD ON LEFT SIDE BARE AREA BEHIND FENCE. | |||
| ROW- PROJECT STATUS | 01/28/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: *** NOTES ADDED BY FSLADISH 1/28/2026 7:25:46 AM *** PROJECT STAUS WAS COMPLETED ON 1/27/28 AND RESULTED TODAY 1/28/26 TO ADD REQUIRED FEE. 1/28/26 MET ON SITE WITH INSPECTOR POLACEK TO REVIEW GRADE CORRECTION PER BUILDERS REQUEST. CORRECTIONS ARE STILL REQUIRED AS GRADE AND DRAINAGE DO NOT MEET COPC STANDARDS AT THIS TIME. CALLED BUILER AND ASKED HIM TO SET UP A NOTHER SITE MEET TO MOVE THIS FORWARD. _______________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 1/14/26 MET ON SITE WITH POOL BUILDER AND SHOWED HIM WAS WAS REQUIRED TO BRING DRAINAGE UP TO COPC MINIMUM STANDARDS. THEY WILL BE FIXING THE RIGHT SIDE REAR OFF OF POOL DECK TO HAVE A SWALE WITH POSITIVE FLOW TO THE FENCE. THEY ARE REQUIRED TO ADD A ROW OF SOD ON LEFT SIDE BARE AREA BEHIND FENCE. | |||
| ROW- PROJECT STATUS | 01/14/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/14/26 MET ON SITE WITH POOL BUILDER AND SHOWED HIM WAS WAS REQUIRED TO BRING DRAINAGE UP TO COPC MINIMUM STANDARDS. THEY WILL BE FIXING THE RIGHT SIDE REAR OFF OF POOL DECK TO HAVE A SWALE WITH POSITIVE FLOW TO THE FENCE. THEY ARE REQUIRED TO ADD A ROW OF SOD ON LEFT SIDE BARE AREA BEHIND FENCE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/13/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 1/13/26 WENT TO SITE TO INVESTIGATE IF THIS SURVEY MATCHED FIELD CONDITIONS. IT DOES NOT. IN THE FIELD ON THE RIGHT SIDE YOU HAVE A TRENCH THAT GOES UPHILL PRIOR TO THE FRONT SIDE YARD FENCE. WATER WILL POOL HERE AND NOT HAVE POSITIVE FORWARD DRAINAGE. THE TRENCH YOU HAVE DUG DOES NOT MEET THE COPC DRAINAGE SWALE STANDARDS. IT IS A STRAIGHT DROP OFF INTO A GULLEY TRENCH. THIS AREA FROM WHERE YOU HAVE LAID SOD IN THE REAR PROPERTY ON THE RIGHT TO WHERE IT BASICALLY DOES A 90 DEGREE BEND WILL NEED TO BE CORRECTED TO COPC STANDARDS AND HAVE POSITIVE FLOW TO FRONT SWALE. THESE AREAS WILL NEED TO BE RESHOT AFTER CORRECTIONS ARE COMPLETED TO MINIMUM COPC STANDARDS. _______________________________________________________________________________________________________________________________ 12/18/2025 - PREVIOUS INSPECTION NOTES 12/18/25 YOUR SITE PLAN SHOWS YOUR DRAINAGE GOING TO REAR MIDDLE AND SPLITTING BOTH LEFT AND RIGHT TO THE FRONT SWALE. YOUR FINAL SURVEY SHOWS FLAT FROM OFF THE POOL DECK WITH NO ELEVATION SHOTS IN THE MIDDLE TO DETERMINE IF THE REQUIRED SWALE IS THERE TO DIVERT DRAINAGE AS SHOWN ON SITE PLAN. PLEASE SEE PHOTO FOR REFERENCE. The rear yard is required to drain to the front Sec 300.01 C-6 Sec 300.01 C-6=Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/18/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 12/18/25 YOUR SITE PLAN SHOWS YOUR DRAINAGE GOING TO REAR MIDDLE AND SPLITTING BOTH LEFT AND RIGHT TO THE FRONT SWALE. YOUR FINAL SURVEY SHOWS FLAT FROM OFF THE POOL DECK WITH NO ELEVATION SHOTS IN THE MIDDLE TO DETERMINE IF THE REQUIRED SWALE IS THERE TO DIVERT DRAINAGE AS SHOWN ON SITE PLAN. PLEASE SEE PHOTO FOR REFERENCE. The rear yard is required to drain to the front Sec 300.01 C-6 Sec 300.01 C-6=Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. | |||
| ELECTRIC AND ALARM | 09/09/2025 | APPROVED | CVANSTRAHLEN |
| POOL DECK | 08/11/2025 | APPROVED | CVANSTRAHLEN |
| STEEL AND GROUND | 07/18/2025 | APPROVED | CVANSTRAHLEN |
| SUBGRADE - FIBERGLASS POOL | 07/18/2025 | APPROVED | CVANSTRAHLEN |
Review History
| Department | Status | Date In | Date Out |
| BFLOOD | CANCEL | 06/25/2025 | 06/27/2025 |
| BLD | COMPLETE | 06/25/2025 | 06/30/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/25/2025 | 06/30/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/25/2025 | 06/27/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/25/2025 | 07/01/2025 |
| Note: Released By: TOM POLACEK - (386)346-8986 - ALL DRAINAGE MUST MEET ALL COPC MINIMUM STANDARDS BEFORE FINAL SURVEY WILL BE APPROVED. | |||
| ZON | COMPLETE | 06/25/2025 | 06/26/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI GENERAL INSPECTION 32.50 | ¤32.50 | 02/26/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 01/26/2026 |
| SURCHARGE FS 533.721 | ¤2.30 | 07/01/2025 |
| SURCHARGE - FS 468.631 | ¤3.44 | 07/01/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 07/01/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/01/2025 |
| SITE PLAN 30 | ¤30.00 | 07/01/2025 |
| ADJUSTMENT 10% | (¤25.50) | 07/01/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/01/2025 |
| INSPECTION- POOL | ¤160.00 | 07/01/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 07/01/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤392.74 |