I want to search for...

Permit #2025061251

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7034-00350-0310
PATIO/DECK (NO ROOF) : 1158 sqft
Total Square Footage: 1158 sqft
Block: 00350
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-225-1722
Location Address: 27 EASTGATE LN
Type: PO - POOL
Issue Date: 07/01/2025
NOC: RECORDED
Applicant name: MICHAEL MARINO HANSEN
Owner: SILBERNAGEL BONIJO

Address

27 EASTGATE LN

PALM COAST, FL 32164

Lot: 0310
Contracted Stated Job Value: ¤92,450.00
Job Description: REFERENCE 2023120236 SWIMMING POOL W/SCREEN ENC
Type: CN
Original Permit #: 2023120236

Contractor

PALM COAST POOLS, LLC
Status Location Address State License Number Phone
ACTIVE

29 COLUMBUS CT

PALM COAST, FL 32137

RP252555609 (Exp: 08/31/2027) 386-225-1722

Sub Contractors

BENJAMIN D DEWITT
Status Location Address State License Number Phone
ACTIVE

356 UNDERWOOD TRAIL

PALM COAST, FL 32164

ER13016065 (Exp: 08/31/2026) 321-262-4104
CHAD W HENDERSON
Status Location Address Phone
ACTIVE

27 FERNON LN

PALM COAST, FL 32137

386-275-8889

Inspection History

Type Request Date Result Inspector
POOL FINAL 08/25/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 8/25/2025 3:05:24 PM *** 8/21/2025 - PREVIOUS INSPECTION NOTES 8/21/25: 1). Breaker for Pool Heater has to be GFCI protected. NEC 210.8(A)(3).
POOL FINAL 08/21/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 8/21/2025 4:28:57 PM *** 8/21/25: 1). Breaker for Pool Heater has to be GFCI protected. NEC 210.8(A)(3).
U -UTILITY RESIDENTIAL FINAL 08/20/2025 FINAL APPROVED LFITZGERALD
ROW - FINAL INSPECTION 08/19/2025 APPROVED FSLADISH
Note: 8/19/25 AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/19/2025 APPROVED FSLADISH
Note: 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 YOUR FINAL SURVEY ELEVETIONS SHOW YOUR DRAINAGE AT THE EDGE OF YOUR PAVER POOL PATIO HIGHER THAN THE FFE OF YOUR PATIO, INDICATING WATER WILL FLOW BACK ONTO YOUR DECK. YOUR ELEVATIONS THEN SHOW THE EDGE ELEVATIONS FALLING REAR ONTO THE REAR ADJOINING PROPERTY. THIS IS NOT ALLOWED. SEE PHOTO FOR REFERENCE. Rear yard will be drained Sec 300.01-C.7 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/19/2025 APPROVED FSLADISH
Note: 8/19/25 AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/22/2025 Disapproved - NO FEE FSLADISH
Note: 7/22/25 YOUR FINAL SURVEY ELEVETIONS SHOW YOUR DRAINAGE AT THE EDGE OF YOUR PAVER POOL PATIO HIGHER THAN THE FFE OF YOUR PATIO, INDICATING WATER WILL FLOW BACK ONTO YOUR DECK. YOUR ELEVATIONS THEN SHOW THE EDGE ELEVATIONS FALLING REAR ONTO THE REAR ADJOINING PROPERTY. THIS IS NOT ALLOWED. SEE PHOTO FOR REFERENCE. Rear yard will be drained Sec 300.01-C.7 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.
ROW - DRAINAGE 07/22/2025 APPROVED FSLADISH
Note: 12/11/2024 - PREVIOUS INSPECTION NOTES 12/11/24 YOU ARE NOT ALLOWED TO DRAIN DIRECTLY INTO THE SWALE. YOU MUST REMOVE YOUR DRAIN LINE TO 10' BEHIND THE ROW AND FILTER IT WITH A HAY BALE OR SOCK ON THE END OF YOUR HOSE. PLEASE MAKE CORRECTIONS ASAP. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 12/12/24. YOU WILL BE RESPONSIBLE FOR REMOVAL OF ANY MATERIAL IN THE SWALE AND ANY DAMAGE THAT MAY HAVE BEEN CAUSED BY DRAINING DIRECTLY INTO SWALE. PHOTO ENCLOSED.
ELECTRIC AND ALARM 12/18/2024 APPROVED PKNAPIK
ROW - DRAINAGE 12/11/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 12/11/24 YOU ARE NOT ALLOWED TO DRAIN DIRECTLY INTO THE SWALE. YOU MUST REMOVE YOUR DRAIN LINE TO 10' BEHIND THE ROW AND FILTER IT WITH A HAY BALE OR SOCK ON THE END OF YOUR HOSE. PLEASE MAKE CORRECTIONS ASAP. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 12/12/24. YOU WILL BE RESPONSIBLE FOR REMOVAL OF ANY MATERIAL IN THE SWALE AND ANY DAMAGE THAT MAY HAVE BEEN CAUSED BY DRAINING DIRECTLY INTO SWALE. PHOTO ENCLOSED.
POOL DECK 11/14/2024 APPROVED MCONTRYMAN
Note: 10/3/2024 - PREVIOUS INSPECTION NOTES 10-3-24 1. Plans call for 2-#5 in footers.
POOL DECK 10/03/2024 Disapproved - NO FEE BTAYLOR
Note: 10-3-24 1. Plans call for 2-#5 in footers.
STEEL AND GROUND 07/15/2024 APPROVED BTAYLOR

Review History

Department Status Date In Date Out
BADMIN INFORMATION 07/18/2025 07/18/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM NOC EXPIRED
BADMIN INFORMATION 07/09/2025 07/09/2025
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM could not process as NOC is Expired
ZON COMPLETE 06/25/2024 06/25/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 06/25/2024 07/02/2024
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BLD COMPLETE 05/07/2024 05/09/2024
Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM
SW1 COMPLETE 05/07/2024 05/13/2024
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL DRAINAGE NEED TO MEET ALL CITY STANDARDS
ZON HOLD 05/07/2024 05/08/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. Please use the foundation survey that was just done for this revision as it has the exact setbacks as measured in the field last week. According to my calculations on the foundation survey, you may need to adjust the size of your pool deck and screen enclosure or you will not meet the minimum required 10' rear setback. 2. Your new revised plans do not match - the layout and dimension are not the same on all of the new plans you just submitted.
ZON COMPLETE 12/20/2023 12/20/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 12/20/2023 12/20/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
SW1 COMPLETE 12/20/2023 01/03/2024
Note: Released By: TOM POLACEK - (386)346-8986 - all new drainage needs to be up to city standards before final survey will be passed.
ZON HOLD 12/15/2023 12/15/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan provided for the wrong address
SW1 HOLD 12/15/2023 12/19/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEW SITE PLAN DOES NOT MATCH THE ADDRESS
BLD COMPLETE 12/07/2023 12/11/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 12/07/2023 12/11/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 12/07/2023 12/07/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 12/07/2023 12/14/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM NEED TO SUBMIT A NEW SITE PLAN
ZON HOLD 12/07/2023 12/07/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Provide the setback from the right side of deck to property line. Arrow is pointing up but no setback given.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 08/24/2025
SURCHARGE FS 533.721 ¤2.00 07/01/2025
SURCHARGE - FS 468.631 ¤2.57 07/01/2025
SW ENG - INSPECTION 20 ¤20.00 07/01/2025
SW ENG - INSPECTION 20 ¤20.00 07/01/2025
SW ENG INSPECTION 40 ¤40.00 07/01/2025
ADJUSTMENT 10% (¤19.00) 07/01/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/01/2025
INSPECTION- POOL ¤160.00 07/01/2025
Fees Total Due: ¤0.00 Total Paid: ¤295.57