Permit #2025070133
Permit Details
Status: INSPECT
| Parcel Id: 10-12-31-0000-00010-0040 |
| Subdivision: 2328 - OCEAN VILLAGE MF |
| Job Phone: 904-208-2000 |
| Location Address: 777 OCEAN VILLAGE CIR |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 12/15/2025 |
| NOC: RECORDED |
| Applicant name: WILLIAM KEITH FAVER |
| Owner: GJE OV FL100, LLC |
|
Address PO BOX 3205 VALDOSTA, GA 31064 |
| Contracted Stated Job Value: ¤1,765,856.22 |
| Job Description: Clubhouse, 1-Story, A3&B |
| Type: CN |
Contractor
THE FAVERGRAY COMPANY
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
415 PABLO AVENUE JACKSONVILLE, FL 32250 |
STE200 JACKSONVILLE, FL 32250 |
CGC1512983 (Exp: 08/31/2026) | 904-208-2000 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
MICHAEL TROY PORTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
710 HAINES STREET JACKONVILLE , FL 32202 |
CFC1426859 (Exp: 08/31/2026) | 904-262-1066 |
KEVIN DALE CLINARD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1300 RIVER PLACE BLVD SUITE 210 JACKSONVILLE, FL 32207 |
EC13005227 (Exp: 08/31/2026) | 904-207-7707 |
JOHN ANTHONY BUCCA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6545 TRADE CENTER DRIVE JACKSONVILLE, FL 32254 |
CAC1814610 (Exp: 08/31/2026) | 904-551-7132 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRIC 2ND ROUGH | 05/12/2026 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 05/11/2026 | Approval - Private Provider | PPROVIDER |
| EXTERIOR ARCHITECTURAL FEATURES | 04/07/2026 | Disapproved -FEE REQUIRED | RPICATAGI |
| Note: BUILDING IS CURRENTELY UNDER CONSTRCTION AND INCOMPLETE. | |||
| STOREFRONT | 03/16/2026 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/WATER BARRIER | 03/12/2026 | Approval - Private Provider | PPROVIDER |
| FRAMING | 02/26/2026 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 02/26/2026 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 02/26/2026 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 02/26/2026 | Approval - Private Provider | PPROVIDER |
| FORMBOARD SURVEY | 02/20/2026 | APPROVED | DLEAP |
| FIREWALL FRAMING | 02/19/2026 | Approval - Private Provider | PPROVIDER |
| FIREWALL PENETRATIONS | 02/19/2026 | Approval - Private Provider | PPROVIDER |
| INSULATION | 02/19/2026 | Approval - Private Provider | PPROVIDER |
| FIREWALL PENETRATIONS | 02/13/2026 | CANCELLED BY APPLICANT | WEB |
| EXTERIOR WALL SHEATHING / SHEARWALL | 02/13/2026 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACE / TIE DOWN | 02/13/2026 | Approval - Private Provider | PPROVIDER |
| FIREWALL FRAMING | 02/13/2026 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC 1ST ROUGH | 02/04/2026 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | |||
| GRAVITY SEWER | |||
| BLD - SEWER TIE IN | |||
| PLUMBING FINAL | |||
| FIREWALL FINAL | |||
| LINTEL | |||
| ELECTRIC FINAL | |||
| ROOF VALLEY & METAL | |||
| ABOVE CEILING | |||
| BUILDING FINAL | |||
| FIRE FINAL | |||
| EXTERIOR ARCHITECTURAL FEATURES | |||
| Note: 4/7/2026 1:26:21 PM- PREVIOUS INSPECTION NOTES BUILDING IS CURRENTELY UNDER CONSTRCTION AND INCOMPLETE. | |||
| U - UTILITY COMMERCIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | HOLD | 06/03/2026 | 06/05/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Upload E002A | |||
| ELEC | HOLD | 03/30/2026 | 04/01/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Upload E002A | |||
| PLLA | HOLD | 03/30/2026 | 04/14/2026 |
| Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM Provide landscape and irrigation plans for building and vicinity inlcuding amenity center. | |||
| GAS | HOLD | 03/30/2026 | 04/02/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM A separate gas permit is required by gas contractor. There will need to be a permit for each address. The permit needs to include size and standard for tank, distance from structures, gas piping material, etc... If using black iron piping underground as plan show, the piping needs to show factory wrap. | |||
| PLENG | COMPLETE | 03/16/2026 | 03/16/2026 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 02/20/2026 | 02/20/2026 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/30/2026 | 02/09/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 12/12/2025 | 12/12/2025 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| DSD | HOLD | 09/25/2025 | 09/29/2025 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM 1. Prior to issuance of building permits, all life- safety facilities necessary to support access and safety of the site by first responders must be in place completed and functioning for their intended purpose. These life-safety facilities are in addition to water, wastewater (including DEP certification), fire-protection and, at a minimum, stabilized fire access roads. 2. Commercial Project Site Improvement Permit must be issued and inspections must pass before release of permits to go vertical. | |||
| BLD | COMPLETE | 09/25/2025 | 10/08/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| DSD | HOLD | 08/19/2025 | 08/19/2025 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Prior to issuance of building permits, all life- safety facilities necessary to support access and safety of the site by first responders must be in place completed and functioning for their intended purpose. These life-safety facilities are in addition to water, wastewater and stormwater facilities (including DEP certification), fire-protection and, at a minimum, stabilized fire access roads Site Improvement Requirements: 1. Provide a complete written project construction phasing schedule explaining and outlining the intended sequencing and completion of all site improvements. a. In conjunction with the written narrative above, provide a Site Plan defining by markings, each construction phase and note the order of completion of each phase and all buildings, facilities and other site features and amenities intended to be completed within each phase. b. Provide intended completion schedules for all site improvements and facilities to be completed in each phase to include parking lots / areas, recreation trails, dog parks, outdoor amenities such as recreation courts, fields and similar, mail kiosks, amenity centers, gyms, swimming pools, fishing piers, gazebos, pavilions and any other facility described in the Development Plans. c. Indicate areas where the first lift of asphalt will be provided. Include a completion schedule for the second and final lift of asphalt is to be completed. Provide a timeline of when the temporary and permanent stripping is to be complete. d. Indicate areas of temporary parking and roadway markings / striping. Provide a completion schedule of when the temporary and permanent striping is to be completed. e. Indicate the installation of landscaping around buildings and in different areas of the site such as common areas, parking areas, recreation and in what stages will they be installed 2. Identify location of fire department access roads through site. a. Indicate whether access roads or portions thereof will be permanent or temporary, stabilized roads. b. Indicate points of site ingress and egress. c. Provide minimum clear widths of 20 feet for one direction access roads and 24 feet for two-way access roads. d. For access roads exceeding 150 feet in length, indicate path of travel to site egress without backing or turning. e. Dead-end access roads of more than 150 feet in length shall be provided with a full-movement turn-around of 104 feet in diameter to accommodate fire apparatus. f. Indicate fire access roads will extend to within 50 feet of at least one entry to all buildings. g. For temporary, stabilized access roads provide a roadway cross section and material details by the project engineer able to support 75,000 pound fire apparatus and an all-weather surface. h. Add notes to indicate temporary, stabilized fire access roads to be maintained by the project developer and deficiencies identified by the Palm Coast Fire Department shall be promptly corrected by the developer to the satisfaction of the Palm Coast Fire Department. 3. Please provide a note on the plans stating: The required fire hydrants and water supply will be installed, flow tested, and flow test reports submitted to the Palm Coast Building Department for review and approval. No storage of combustible materials and no vertical construction is permitted to occur until fire-flow test reports have been approved. If completion of water supply and fire hydrants is intended to be part of a Phasing Plan, then fire hydrants intended to be “in-service” shall be shown in conjunction with each phase. 4. Denote and map area for FDEP partial clearance for water main on-site plan. 5. A sign is required to be located on each building at a location approved by the City stating the following: “NOTICE: DO NOT CONNECT WATER OR SEWER LINES”. This sign should be in English and Spanish. (See Exhibit B). Signs are required to be maintained and always in vertical position. 6. If this site has a SWPPP on file all requirements listed in this plan must be met to include the stabilization of areas not to be built on with seeds. 7. Issuance of building permits shall also conform to requirements of other City departments and divisions. 8. When submitting for a modification to the DO submit all pictures with the signs posted on each proposed building location, DEP clearance and all test preformed on the water system. All documents must be provided via this link below and not part of this permit. . https://old.palmcoastgov.com/government/planning/online-app | |||
| UD2 | COMPLETE | 08/19/2025 | 09/02/2025 |
| Note: Released By: DAN LEMONCELLO - - | |||
| MECH | COMPLETE | 08/19/2025 | 08/28/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 08/19/2025 | 08/28/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 08/19/2025 | 08/29/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/19/2025 | 08/28/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 08/19/2025 | 08/29/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM | |||
| ARCHR | COMPLETE | 08/19/2025 | 09/03/2025 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/19/2025 | 09/02/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM REPEAT COMMENT: 2. In Life Safety Chart show total building design occupant load. FBCB 1004.1. Include outside area such as rear Lounging Area Poolside / covered porch. If any part of the pool, pool deck or similar outdoor areas associated with the adjacent pool and / or other outdoor areas are intended to pass through the building as part of the means of egress for those areas, include, by separate line item, the total number of occupants expected in the building’s means of egress system. Outdoor areas including pool and pool deck may be classified as an A3 occupancy dependent on occupant load and if it exceeds 50 occupants. Use 7 net square feet per occupant to determine number of occupants. FBCB 1004.7, Table 1004.5. Ensure building means of egress system is designed for additional outdoor area occupants. FBCB 1005 and other applicable portions of FBCB Chapter 10. (PROVIDE POOL DECK OCCUPANT LOAD. PROVIDE OCCUPANT LOAD FOR COVERED PATIOS. PROVIDE EXIT WIDTH IN INCHES BASED ON THE POOL BATHER LOAD AND POOL DECK OCCUPANT LOAD.) REPEAT COMMENT: 13. Provide Florida Product Approval Number for soffits and garage door on Florida Product Approval Worksheet. 107.2.1(NO NEW PRODUCT APPROVAL SHEET UPLOADED) NEW COMMENT: 1. Plan page CS000 needs to be digitally signed sealed and verifiable. F.S. 471.025 2. Provide gate details showing dimensions, panic hardware, accessibility requirements. You can defer these details to the pool permit, but will need to show them to obtain the pool permit. | |||
| ARCHR | HOLD | 07/03/2025 | 07/18/2025 |
| Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM LDC Section 13.04.03 (ROOFS) Requires that pitched roofs shall have minimum pitch of 5/12. Roof areas that are flatter, are permited on a maxmum of 35% of the overall roof area. Provide a chart/table (with areas of each roof pitch) to demonstrate that flatter roofs do not exceed 35% of the overall roof area. | |||
| BLD | HOLD | 07/03/2025 | 07/22/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA BUILDING CODE-PLUMBING (FBCP), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Plans need to be from 2023 8th edition. Also revise structural plans to say 8Th edition. FBC Building 2. In Life Safety Chart show total building design occupant load. FBCB 1004.1. Include outside area such as rear Lounging Area Poolside / covered porch. If any part of the pool, pool deck or similar outdoor areas associated with the adjacent pool and / or other outdoor areas are intended to pass through the building as part of the means of egress for those areas, include, by separate line item, the total number of occupants expected in the building’s means of egress system. Outdoor areas including pool and pool deck may be classified as an A3 occupancy dependent on occupant load and if it exceeds 50 occupants. Use 7 net square feet per occupant to determine number of occupants. FBCB 1004.7, Table 1004.5. Ensure building means of egress system is designed for additional outdoor area occupants. FBCB 1005 and other applicable portions of FBCB Chapter 10. 3. Provide soffit dimensions. If over 12 inches, provide intermediate nailing strip. 1410.3 FBC Building 4. Provide missing plan sheets ID8.1 and ID8.2 and any other sheet needed to complete plans. Please provide a plan sheet legend for all plans sheets. Not all listed on current legend. 107.2.1 FBC Building 5. Provide bathroom finish and finish around service sinks 1210.2.2 FBC Building 6. Provide list of deferred submittals. Engineered truss plans not provided, list them as a deferred submittal. Pre-manufactured awnings and similar. FBCB Section 107.3.4.1 7. Provide City of Palm Coast Roofing Worksheet - FL# 18374-R4 not valid. 107.2.1 8. Plan Sheet CA020 under Under project summary it calls out NFPA13R and the code summary NFPA 13. Revise 107.2.1 9. Plan Sheet CA262, CA060- Notes refer to FBC 7th Edition. Please update to current code cycle. Check all plan pages. 107.2.1 11. Provide site plan with distances between buildings for Fire separation distance FBC 705.6 12. Provide legend detail for dotted line on covered patio between fitness room and amenity center. Is that a screen wall?. Also some plan sheets show a door in that wall, bit some plans only show an opening. Provide details on the door. Update all plan sheets to show the same. 107.2.1 13. Provide Florida Product Approval Number for soffits and garage door on Florida Product Approval Worksheet. 107.2.1 14. Clarify 1Hr rated outside wall only for electrical rooms. Is this correct? Is it only for outside walls or all the room walls? 107.2.1 | |||
| DSD | HOLD | 07/03/2025 | 07/10/2025 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Prior to issuance of building permits, all life- safety facilities necessary to support access and safety of the site by first responders must be in place completed and functioning for their intended purpose. These life-safety facilities are in addition to water, wastewater and stormwater facilities (including DEP certification), fire-protection and, at a minimum, stabilized fire access roads Site Improvement Requirements: 1. Provide a complete written project construction phasing schedule explaining and outlining the intended sequencing and completion of all site improvements. a. In conjunction with the written narrative above, provide a Site Plan defining by markings, each construction phase and note the order of completion of each phase and all buildings, facilities and other site features and amenities intended to be completed within each phase. b. Provide intended completion schedules for all site improvements and facilities to be completed in each phase to include parking lots / areas, recreation trails, dog parks, outdoor amenities such as recreation courts, fields and similar, mail kiosks, amenity centers, gyms, swimming pools, fishing piers, gazebos, pavilions and any other facility described in the Development Plans. c. Indicate areas where the first lift of asphalt will be provided. Include a completion schedule for the second and final lift of asphalt is to be completed. Provide a timeline of when the temporary and permanent stripping is to be complete. d. Indicate areas of temporary parking and roadway markings / striping. Provide a completion schedule of when the temporary and permanent striping is to be completed. e. Indicate the installation of landscaping around buildings and in different areas of the site such as common areas, parking areas, recreation and in what stages will they be installed 2. Identify location of fire department access roads through site. a. Indicate whether access roads or portions thereof will be permanent or temporary, stabilized roads. b. Indicate points of site ingress and egress. c. Provide minimum clear widths of 20 feet for one direction access roads and 24 feet for two-way access roads. d. For access roads exceeding 150 feet in length, indicate path of travel to site egress without backing or turning. e. Dead-end access roads of more than 150 feet in length shall be provided with a full-movement turn-around of 104 feet in diameter to accommodate fire apparatus. f. Indicate fire access roads will extend to within 50 feet of at least one entry to all buildings. g. For temporary, stabilized access roads provide a roadway cross section and material details by the project engineer able to support 75,000 pound fire apparatus and an all-weather surface. h. Add notes to indicate temporary, stabilized fire access roads to be maintained by the project developer and deficiencies identified by the Palm Coast Fire Department shall be promptly corrected by the developer to the satisfaction of the Palm Coast Fire Department. 3. Please provide a note on the plans stating: The required fire hydrants and water supply will be installed, flow tested, and flow test reports submitted to the Palm Coast Building Department for review and approval. No storage of combustible materials and no vertical construction is permitted to occur until fire-flow test reports have been approved. If completion of water supply and fire hydrants is intended to be part of a Phasing Plan, then fire hydrants intended to be “in-service” shall be shown in conjunction with each phase. 4. Denote and map area for FDEP partial clearance for water main on-site plan. 5. A sign is required to be located on each building at a location approved by the City stating the following: “NOTICE: DO NOT CONNECT WATER OR SEWER LINES”. This sign should be in English and Spanish. (See Exhibit B). Signs are required to be maintained and always in vertical position. 6. If this site has a SWPPP on file all requirements listed in this plan must be met to include the stabilization of areas not to be built on with seeds. 7. Issuance of building permits shall also conform to requirements of other City departments and divisions. 8. When submitting for a modification to the DO submit all pictures with the signs posted on each proposed building location, DEP clearance and all test preformed on the water system. All documents must be provided via this link below and not part of this permit. . https://old.palmcoastgov.com/government/planning/online-app | |||
| ELEC | HOLD | 07/03/2025 | 07/18/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Requirements need to be 100% addressed in comcheck | |||
| FI1 | HOLD | 07/03/2025 | 07/18/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to reference the FFPC 8th edition 2. Reference the current NFPA 1 and 101 3. Please provide information on the Knox access box for rapid entry access of fire department into the building per NFPA 1, 18.2.2.1 and AHJ And place the following note on the cover sheet. Please select FLAGLER COUNTY DEPT. of EMERGENCY MANAGEMENT, for jurisdiction or agency even though it is going in the city. This way it will get it keyed correctly. https://www.knoxbox.com/Products/Commercial-KnoxBoxes 4. This is not a NFPA 13R system. Revise plan that notes that. 5. Place note on plans : SEPARATE PERMITS REQUIRED FOR ALL FIRE SPRINKLERS, FIRE ALARMS/NOTIFICATION, FIRE SUPPRESSION, HOOD SUPPRESSION SYSTEMS, AND FIRE UNDERGROUND WORK BY CONTRACTORS LICENSED FOR THE SCOPE OF WORK ACCORDING TO FLORIDA STATUTES CHAPTER 633. PLANS PREPARED BY A FLORIDA LICENSED PROFESSIONAL AS WELL AS ANY SYSTEM LAYOUT PLANS SHALL BE SUBMITTED WITH EACH PERMIT. ALLOW SUFFICIENT TIME FOR PLAN REVIEW AND PLAN APPROVAL. NO WORK SHALL BE STARTED, COVERED OR OTHERWISE CONCEALED FROM VIEW UNTIL APPROVED | |||
| GAS | CANCEL | 07/03/2025 | 07/10/2025 |
| MECH | HOLD | 07/03/2025 | 07/18/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE- MECHANICAL (FBCM), FLORIDA BUILDING CODE-ENERGY CONSERVATION (FBCEC), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Requirements need to be 100% addressed in comcheck 2. Provide kitchen schedule for clubroom and workroom 107.2.1 3. Provide Heatload Calculation per C403.2.1 FBC Energy Conservation 4. Provide Ventilation calculation per Table 403.3.1.1 FBC Mechanical 5. Revise note 11 on plan page CM001 to show condensate drains for AC units need to run to the outside of the building. Not allowed to run into sanitary sewer system per Municode Section 49-104 (12) 6. Provide note on plan for test and balance per C408.2.2 FBC Energy Conservation 7. Provide note on plan showing smoke detectors mounted in supply side of RTU's per 606.2.1 FBC Mechanical 8. Provide ductwork details showing hanging, installation and volume dampers per Chapter 603 FBC Mechanical 9. Provide note on plans for means of balancing for all supply, return, fresh air and exhaust per Section 608 FBC Mechanical 10. Plans refer to ID81 for interior elevations. That page is missing. Is there a fireplace?. If so provide venting details and manufacturer specs 107.2.1 11. Provide refrigerant leak detection for machinery rooms 1105.3 FBC Mechanical 12. Provide means of ventilation for both machinery rooms 1105.6 FBC Mechanical/ ASHAE 15 13. Provide EDVC calculation. Show work. 7.3.1 ASHRAE 15 | |||
| PLUM | HOLD | 07/03/2025 | 07/18/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-PLUMBING (FBCP), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA STATUTES (F.S.), FLORIDA ADMINISTRATIVE CODE (F.A.C.) AND AUTHORITY HAVING JURISDICTION (A.H.J.). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Provide minimum plumbing fixture requirement. 403.1 2. Provide plumbing fixture calculations based on total building occupant load. Show areas and calculations. Amenity building serves pool . Provide sanitary facility fixture calculations per FBCB 454.1.6.1 and Table 454.1.6.1. Provide note indicating all sanitary facilitits will not exceed 200-foot walking distance from the nearest water’s edge. FBCB 454.1.6.1. Amenity building plumbing facilities serve outdoor pool deck. Pool deck area is not shown. Provide area of pool deck and any other outdoor areas served by Amenity Building. Check City approved site plan to ensure all outdoor areas are included. Provide occupant load calculations for outdoor areas using 15 square feet per occupant. FBCB 1004.7. Provide plumbing fixture calculations based on cumulative occupant loads outlined in this section. 3. Add backflow device schedule. List various backflow devices, manufacturer, model and applicable design standard they must conform to for each device type. Section 608. Table 608.1. Backflow preventer required at hose-bibbs, janitor sink, ice-maker, and any other water utilizing appliance connected to the water system including any not shown in the plans (e.g. coffee maker with direct water supply connection). 4. Provide location and make of hammer arrestors called out on plans.107.2.1 5. Provide note to indicate all backflow devices are subject to testing by an independent, third party, Florida licensed backflow testing agency and each backflow device will be tested and provided with an approved testing tag at time of installation. 312.10.2 | |||
| UD1 | HOLD | 07/03/2025 | 07/18/2025 |
| Note: Held By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM See utility comments (water & sewer) referenced by D. Ramirez of Development Services | |||
| UD2 | HOLD | 07/03/2025 | 07/14/2025 |
| Note: Held By: DAN LEMONCELLO - - 1) No grease interceptor needed for aplliances listed: 2-comp sink, stove and refridgerator. No fryers? no commercial ovens? no hood? 2) contact Utility Wastewater Pretreatment Inspector Dan Lemoncello if any questions at (386) 286-2011 or llemoncello@palmcoastgov.com | |||
| GAS | PENDING | ||
| PLLA | PENDING | ||
| ELEC | PENDING |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤298.89) | 12/15/2025 |
| ADMINISTRATIVE - COMMERCIAL PP | ¤1,350.00 | 12/15/2025 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 12/15/2025 |
| INSPECTION - FIRE COMMERCIAL | ¤441.50 | 12/15/2025 |
| PLAN REVIEW - COMMERCIAL | ¤2,472.40 | 12/15/2025 |
| SURCHARGE FS 533.721 | ¤40.40 | 12/15/2025 |
| SURCHARGE - FS 468.631 | ¤60.60 | 12/15/2025 |
| SITE PLAN 30 | ¤30.00 | 12/15/2025 |
| IMPACT FEE FIRE | ¤7,501.90 | |
| REINSPECTION- SITE INSPECTOR | ¤40.00 | |
| Fees | Total Due: ¤7,541.90 | Total Paid: ¤4,171.01 |