I want to search for...
Permit #2025070279
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7063-00390-0060 |
| Block: 00390 |
| Subdivision: 7063 - |
| Job Phone: 904-826-9393 |
| Location Address: 16 ZEBULAHS TRL |
| Type: GA - GAS |
| Issue Date: 07/14/2025 |
| NOC: Unknown |
| Applicant name: JACKSON T BRADY |
| Owner: RYAN CHRISTOPHER |
|
Address 16 ZEBULAHS TRL PALM COAST, FL 32164 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤1,600.00 |
| Job Description: Install 2-120 aboveground LP Gas tanks and 10ft piping to a generator |
| Type: CN |
Contractor
IDEAL GAS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3200 PARKER DRIVE , |
LQ33538 (Exp: 08/31/2027) | 904-417-6470 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS FINAL | 10/08/2025 | FINAL APPROVED | MKRASKI |
| GAS FINAL | 08/14/2025 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: 7/25/2025 - PREVIOUS INSPECTION NOTES 7/25/25 The site plan revision and gas layout that was sent in and approved, still shows tanks in different locations than they are actually placed. Tanks are set just inside of the front left fence line (left garage side). Site plans have the tanks in the left side rear yard, and the gas layout has the tanks placed in left side back, behind the AC Unit. Please have both revisions submitted and approved the proper location of where the tanks are installed before scheduling another inspection. 7/21/2025 - PREVIOUS INSPECTION NOTES 7/21/25 Site plan revision has not been made/submitted for approval. Inspector Notes from Inspection 2225 SITE PLAN SHOWS TANKS A/G SITTING BEHIND A/C UNIT, FILE FOR REVISION TO SHOW THE TANKS SITTING IN IN CURRENT LOCACTION UP AGAINST FENCE ON LEFT SIDE OF PROPERTY BY GATE NEED TO FILE REVISION FOR SITE PLAN, SITE PLAN SHOWS A/G TANKS SITTING BEHIND A/C UNIT HOWEVER TANKS ARE SITTING RIGHT BEHIND FENCE ON LEFT SIDE OF GARAGE | |||
| GAS FINAL | 07/25/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 7/25/25 The site plan revision and gas layout that was sent in and approved, still shows tanks in different locations than they are actually placed. Tanks are set just inside of the front left fence line (left garage side). Site plans have the tanks in the left side rear yard, and the gas layout has the tanks placed in left side back, behind the AC Unit. Please have both revisions submitted and approved the proper location of where the tanks are installed before scheduling another inspection. 7/21/2025 - PREVIOUS INSPECTION NOTES 7/21/25 Site plan revision has not been made/submitted for approval. Inspector Notes from Inspection 2225 SITE PLAN SHOWS TANKS A/G SITTING BEHIND A/C UNIT, FILE FOR REVISION TO SHOW THE TANKS SITTING IN IN CURRENT LOCACTION UP AGAINST FENCE ON LEFT SIDE OF PROPERTY BY GATE | |||
| GAS FINAL | 07/21/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 7/21/25 Site plan revision has not been made/submitted for approval. Inspector Notes from Inspection 2225 SITE PLAN SHOWS TANKS A/G SITTING BEHIND A/C UNIT, FILE FOR REVISION TO SHOW THE TANKS SITTING IN IN CURRENT LOCACTION UP AGAINST FENCE ON LEFT SIDE OF PROPERTY BY GATE | |||
| GAS ROUGH | 07/17/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: SITE PLAN SHOWS TANKS A/G SITTING BEHIND A/C UNIT, FILE FOR REVISION TO SHOW THE TANKS SITTING IN IN CURRENT LOCACTION UP AGAINST FENCE ON LEFT SIDE OF PROPERTY BY GATE |
Review History
| Department | Status | Date In | Date Out |
| GAS | COMPLETE | 08/06/2025 | 08/06/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/06/2025 | 08/06/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/23/2025 | 07/23/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 07/23/2025 | 07/24/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| GAS | HOLD | 07/22/2025 | 07/23/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide new site plan and reupload gas riser and name it gas riser diagram | |||
| ZON | HOLD | 07/22/2025 | 07/22/2025 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. SUBMIT REVISED SITE PLAN | |||
| GAS | COMPLETE | 07/09/2025 | 07/09/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/09/2025 | 07/09/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/15/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2025 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/14/2025 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/14/2025 |
| SITE PLAN 15 | ¤15.00 | 07/14/2025 |
| ADJUSTMENT 10% | (¤12.25) | 07/14/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/14/2025 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 07/14/2025 |
| PLAN REVIEW - MISC 32.50 | ¤32.50 | 07/14/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤249.25 |