Permit #2025070558

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-0860
CONDITIONED SPACE: 2350 sqft
OPENED PORCH (WITH ROOF) : 37 sqft
OPENED PORCH (WITH ROOF) : 397 sqft
GARAGE: 698 sqft
Total Square Footage: 3482 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-236-4133
Location Address: 686 MAHOGANY RUN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/18/2025
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: VOLUSIA RESIDENTIAL CONSTRUCTION LLC

Address

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

Lot: 0860
Contracted Stated Job Value: ¤422,951.00
Job Description: SINGLE FAMILY RESIDENCE.
Type: CN

Contractor

VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1262114 (Exp: 08/31/2026) 386-236-4133

Sub Contractors

TIMUR ISPARYAN
Status Location Address State License Number Phone Fax
ACTIVE

3665 SPRINK PARK ROAD

JACKSONVILLE , FL 32207

CMC1249968 (Exp: 08/31/2026) 904-245-1818 904-337-1910
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
HUGH MACDONALD
Status Location Address State License Number Phone
ACTIVE

10825 TOM FOLSOM ROAD, SUITE A

THONOTOSASSA, FL 33592

CCC1329562 (Exp: 08/31/2026) 813-986-4968
HARLEY M BRYAN
Status Location Address State License Number Phone
ACTIVE

5223 EDGEWOOD CT

ORMOND BEACH, FL 32174

LI26657 (Exp: 08/31/2028) 386-463-2700

Inspection History

Type Request Date Result Inspector
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/30/2025 APPROVED RRICKS
Note: 12/23/2025 - RRicks Gabriel and I conducted a site visit, and the field conditions are satisfactory, although the Final Survey does show some discrepancies. We discussed these items with Ryan, the Construction Manager, and he is currently working on submitting a revised Final Survey along with the Final Lot Grading and Drainage Certificate. We also discussed the possibility of allowing a Temporary Certificate of Occupancy with Patrick; however, no confirmation has been received as of yet... 12/19/2025 - PREVIOUS INSPECTION NOTES 12-19-25 TPOLACEK*** ALL PERMITS DATED AFTER JULY 1ST 2025 REQUIRE A LOT GRADING CERTIFICATION. City of Palm Coast Building Services June 3, 2025 ATTENTION RESIDENTIAL HOME BUILDERS EFFECTIVE JULY 1, 2025 NEW REQUIREMENTS FOR RESIDENTIAL (ONE- AND TWO-FAMILY DWELLINGS) STORMWATER MANAGEMENT BEGINNING JULY, 1, 2025 PLEASE NOTE THE FOLLOWING PERMIT SUBMITTAL CHANGES NEW DOCUMENT TYPE: LOT GRADING & DRAINAGE PLANS - PERMITS APPLIED FOR ON AND AFTER JULY 1, 2025 • LOT GRADING AND DRAINAGE PLANS ARE A NEW DOCUMENT TYPE THAT MUST BE SUBMITTED WITH ALL PERMIT APPLICATIONS FOR NEW ONE- AND TWO-FAMILY DWELLINGS • LOT GRADING AND DRAINAGE PLANS MUST BE PREPARED BY, AND DIGITALLY SIGNED AND SEALED BY, A FLORIDA LICENSED PROFESSIONAL ENGINEER - GRADING & DRAINAGE PLANS BY LAND SURVEYORS / MAPPERS WILL NOT BE ACCEPTED. • LOT GRADING AND DRAINAGE PLANS MUST INCLUDE ALL STORMWATER GRADING AND DRAINAGE DESIGN CRITERIA (SEPARATE PUBLICATION FORTHCOMING). SITE PLANS • SITE PLANS SHALL NOT CONTAIN ANY LOT GRADING AND DRAINAGE DETAILS. SITE PLANS SHALL CONTAIN ONLY ZONING AND LAND USE DETAILS. SITE PLANS CONTAINING GRADING AND DRAINAGE INFORMATION WILL BE REJECTED WITH A REQUEST TO REMOVE GRADING AND DRAINAGE DETAILS. NEW DOCUMENT TYPE: FINAL LOT GRADING AND DRAINAGE CERTIFICATIONS - PERMITS APPLIED FOR ON AND AFTER JULY 1, 2025 • AT COMPLETION OF THE HOME AND AFTER INSTALLATION OF ALL REQUIRED LANDSCAPING A FINAL LOT GRADING & DRAINAGE CERTIFICATION SHALL BE SUBMITTED. • THE LOT GRADING & DRAINAGE CERTIFICATION SHALL BE ON A FORM PROVIDED BY THE CITY (FORM WILL BE POSTED ON THE BUILDING DIVISION WEBSITE) • THE FINAL LOT GRADING & DRAINAGE CERTIFICATION SHALL BE PREPARED BY AND SIGNED AND SEALED BY THE FLORIDA LICENSED PROFESSIONAL ENGINEER WHO PREPARED THE LOT GRADING & DRAINAGE PLAN • THE FINAL LOT GRADING & GRADING CERTIFICATION IS IN LIEU OF THE STORMWATER FINAL SURVEY. THE FINAL SURVEY IS NO LONGER REQUIRED. MORE INFORMATION WILL BE PROVIDED IN THE COMING WEEKS PRIOR TO THE JULY 1ST EFFECTIVE DATE INCLUDING OPPORTUNITIES TO MEET WITH THE BUILDING DIVISION ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback
U -UTILITY RESIDENTIAL FINAL 12/30/2025 FINAL APPROVED BHAINES
Note: Inspector Notes from Inspection 9035 NO CC,
ROW FIELD SURVEY /GRADING CERTIFICATION 12/29/2025 APPROVED RRICKS
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved
ROW - STORMWATER FINAL 12/29/2025 APPROVED RRICKS
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved
ROW - FINAL APRON (AFTER POUR) 12/29/2025 APPROVED RRICKS
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved
BLD - BUILDING FINAL 12/26/2025 APPROVED CVANSTRAHLEN
GAS FINAL 12/19/2025 APPROVED HCAMACHO
Note: Gas Final on the house and piping. Inspector Notes from Inspection 2225 NEED BOND WIRE ATTACHED TO GAS STUB-OUT
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/19/2025 Disapproved - NO FEE TPOLACEK
Note: 12-19-25 TPOLACEK*** ALL PERMITS DATED AFTER JULY 1ST 2025 REQUIRE A LOT GRADING CERTIFICATION. City of Palm Coast Building Services June 3, 2025 ATTENTION RESIDENTIAL HOME BUILDERS EFFECTIVE JULY 1, 2025 NEW REQUIREMENTS FOR RESIDENTIAL (ONE- AND TWO-FAMILY DWELLINGS) STORMWATER MANAGEMENT BEGINNING JULY, 1, 2025 PLEASE NOTE THE FOLLOWING PERMIT SUBMITTAL CHANGES NEW DOCUMENT TYPE: LOT GRADING & DRAINAGE PLANS - PERMITS APPLIED FOR ON AND AFTER JULY 1, 2025 • LOT GRADING AND DRAINAGE PLANS ARE A NEW DOCUMENT TYPE THAT MUST BE SUBMITTED WITH ALL PERMIT APPLICATIONS FOR NEW ONE- AND TWO-FAMILY DWELLINGS • LOT GRADING AND DRAINAGE PLANS MUST BE PREPARED BY, AND DIGITALLY SIGNED AND SEALED BY, A FLORIDA LICENSED PROFESSIONAL ENGINEER - GRADING & DRAINAGE PLANS BY LAND SURVEYORS / MAPPERS WILL NOT BE ACCEPTED. • LOT GRADING AND DRAINAGE PLANS MUST INCLUDE ALL STORMWATER GRADING AND DRAINAGE DESIGN CRITERIA (SEPARATE PUBLICATION FORTHCOMING). SITE PLANS • SITE PLANS SHALL NOT CONTAIN ANY LOT GRADING AND DRAINAGE DETAILS. SITE PLANS SHALL CONTAIN ONLY ZONING AND LAND USE DETAILS. SITE PLANS CONTAINING GRADING AND DRAINAGE INFORMATION WILL BE REJECTED WITH A REQUEST TO REMOVE GRADING AND DRAINAGE DETAILS. NEW DOCUMENT TYPE: FINAL LOT GRADING AND DRAINAGE CERTIFICATIONS - PERMITS APPLIED FOR ON AND AFTER JULY 1, 2025 • AT COMPLETION OF THE HOME AND AFTER INSTALLATION OF ALL REQUIRED LANDSCAPING A FINAL LOT GRADING & DRAINAGE CERTIFICATION SHALL BE SUBMITTED. • THE LOT GRADING & DRAINAGE CERTIFICATION SHALL BE ON A FORM PROVIDED BY THE CITY (FORM WILL BE POSTED ON THE BUILDING DIVISION WEBSITE) • THE FINAL LOT GRADING & DRAINAGE CERTIFICATION SHALL BE PREPARED BY AND SIGNED AND SEALED BY THE FLORIDA LICENSED PROFESSIONAL ENGINEER WHO PREPARED THE LOT GRADING & DRAINAGE PLAN • THE FINAL LOT GRADING & GRADING CERTIFICATION IS IN LIEU OF THE STORMWATER FINAL SURVEY. THE FINAL SURVEY IS NO LONGER REQUIRED. MORE INFORMATION WILL BE PROVIDED IN THE COMING WEEKS PRIOR TO THE JULY 1ST EFFECTIVE DATE INCLUDING OPPORTUNITIES TO MEET WITH THE BUILDING DIVISION ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback
U-CROSS CONNECTION 12/19/2025 APPROVED - AS NOTED BHAINES
Note: NO CC,
ELECTRIC - EARLY POWER 11/25/2025 APPROVED MCONTRYMAN
Note: 11/25/25 1. Label all breakers in meter/main panel by final Inspector Notes from Inspection 2200 Authorize release of email.
ROW- PRE-APRON (PRE-POUR) 11/12/2025 APPROVED PFLANAGAN
Note: READY FOR PAVERS ----------------------------------------------------------------------------------- 11/3/2025 - PREVIOUS INSPECTION NOTES ** 11/03/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________
ROW- PAVER RESTRAINTS 11/03/2025 APPROVED EMADISON
Note: * 11/03/25 READY TO POUR PAVER RESTRAINTS AND APRON ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ____________________________________________________________________________________________________________________
ROW- PRE-APRON (PRE-POUR) 11/03/2025 PARTIALLY APPROVED EMADISON
Note: ** 11/03/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________
LATH/BRICK/ WATER BARRIER 10/27/2025 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2490 10/22/25 Gas riser revision was sent in. Waiting for approval Inspector Notes from Inspection 2420 1. Missing nail plates behind the plumbing on the shear wall plywood side. 2. Gas piping missing bonding wire. 3. Gas line missing to the cooktop in the kitchen according to the riser. If deleting revise riser layout.
ELECTRIC-TUG 10/23/2025 APPROVED - AS NOTED JSTEWART
Note: Authorize release of email.
INSULATION 10/22/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 10/22/25 Gas riser revision was sent in. Waiting for approval Inspector Notes from Inspection 2420 1. Missing nail plates behind the plumbing on the shear wall plywood side. 2. Gas piping missing bonding wire. 3. Gas line missing to the cooktop in the kitchen according to the riser. If deleting revise riser layout.
GAS ROUGH 10/20/2025 APPROVED - AS NOTED MGIBSON
Note: NEED BOND WIRE ATTACHED TO GAS STUB-OUT
ALL ROUGH 10/20/2025 APPROVED - AS NOTED HCAMACHO
Note: 1. Missing nail plates behind the plumbing on the shear wall plywood side. 2. Gas piping missing bonding wire. 3. Gas line missing to the cooktop in the kitchen according to the riser. If deleting revise riser layout.
WALL SHEATHING 10/17/2025 APPROVED HCAMACHO
ROOF VALLEY & METAL 10/08/2025 APPROVED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/03/2025 APPROVED JSTEWART
TIE BEAM / LINTEL 09/25/2025 APPROVED HCAMACHO
MONOLITHIC SLAB 09/16/2025 APPROVED JSTEWART
Note: 9/15/2025 - PREVIOUS INSPECTION NOTES canceled via phone
MONOLITHIC SLAB 09/15/2025 CANCELLED BY APPLICANT HCAMACHO
Note: canceled via phone
FORMBOARD SURVEY (OFFICE USE ONLY) 09/11/2025 APPROVED PFLANAGAN
PLUMBING 1ST ROUGH UNDERGROUND 09/11/2025 APPROVED MGIBSON
GRAVITY SEWER TEST 09/11/2025 APPROVED MGIBSON
SEWER TIE IN 09/11/2025 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 09/11/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BADMIN INFORMATION 12/29/2025 12/29/2025
Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM The As-Built Final Lot Grading & Drainage Plan must be accompanied by the Final Lot Grading & Drainage Certification. It must be part of one file and not uploaded as a separate document.
BADMIN INFORMATION 12/29/2025 12/29/2025
Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM The As-Built Final Lot Grading & Drainage Plan must be accompanied by the Final Lot Grading & Drainage Certification. It must be part of one file and not uploaded as a separate document.
GAS COMPLETE 10/22/2025 10/23/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/24/2025 09/24/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 09/23/2025 09/23/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 09/16/2025 09/16/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 09/10/2025 09/10/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 09/10/2025 09/10/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Form board survey must demonstrate that the rear of the home on the right side meets the minimum required 3' setback.
BLD COMPLETE 08/28/2025 09/03/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ELEC COMPLETE 08/28/2025 09/04/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/28/2025 09/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
MECH COMPLETE 08/28/2025 08/29/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 08/28/2025 08/28/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 08/14/2025 08/14/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
SW1 HOLD 08/12/2025 08/13/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - The proposed FFE appears to be lower than surrounding FFE's. Please confirm. - Please depict on site plan that you are referencing NAVD88 - Based on the proposed elevations water from adjacents lot is negatively impacting this home. - The shall be a minimum of 0.3' fall from adjacent lots to proposes common swale along side property lines. - Please provide more adjacent grades along home's foundation to clearly depict how this home is being impacted. Please feel free to call or email if there are any questions or concerns.
ENGIN1 COMPLETE 08/12/2025 08/13/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 08/07/2025 08/07/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Additional comments: Please label adjacent lots as vacant or improved. If lot is vacant the nearest improved lot's FFE shall be depicted per COPC Technical Manual.
BLD COMPLETE 08/06/2025 08/11/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 HOLD 08/06/2025 08/07/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Please label on site benchmarks with elevations. Provide proposed elevations along property lines on a 20' grid. Please note that there shall positive fall moving water away from home on the sides. - When common swales are proposed there shall a minimum of 0.3' fall from top of swale to the bottom of the swale. This will ensure that neither lot is negatively impacted.
BADMIN COMPLETE 07/15/2025 07/22/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 07/15/2025 07/22/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Product Approval List structural components that will be used.
CUSVC COMPLETE 07/15/2025 07/18/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 07/15/2025 07/22/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/15/2025 07/16/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS COMPLETE 07/15/2025 07/16/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE COMPLETE 07/15/2025 07/16/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/15/2025 07/17/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 07/15/2025 07/23/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM COPC Technical Manual Section - 200.01.A.b(1) -Finished Floor Elevation (FFE) of the living area of all improved structures on adjacent (left and right sides) lots. If there is no improved property on the left or right, the closest improved adjacent FFE shall be provided. 2) The elevations on all adjacent properties at a minimum of 20-foot intervals on a 10-foot offset outside the property lines. (3) The elevations at 20-foot intervals along all property lines. There must be sufficient elevation shots to indicate the proposed drainage pattern. (4) The elevations interior to the lot at no greater than a 20-foot grid. (5) Elevations at the lot corners, at foundation corners, along all sides of the proposed building, and 10 feet off the proposed building are required in addition to the 20-foot grid. COPC Technical Manual Section - 200.01A.1.b.(11) - The Finished Floor Elevation (FFE) of the proposed home’s living space, attached and / or detached garages, attached and / or detached patios, lanais, porches, exterior door landings, sidewalks and similar shall be shown. Unattached pads solely for the purpose of supporting AC, LPG and pool equipment are exempt. - All attached garages, patios, lanais, porches, exterior door landings, sidewalks and similar shall show an FFE of not less than 0.33 tenths of a foot (4 inches) lower than the FFE of the home’s living space. Exception: Access ramps may rise to the FFE of the interior living space for the width of the ramp only. - All attached patios, lanais, porches, exterior door landings, sidewalks and similar and those located within 10 feet of the proposed home shall show a minimum slope perpendicular to the foundation of not less than 2%. Attached and detached garages shall show a positive slope to facilitate drainage towards the vehicle entrance. - Please provide an on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). COPC Technical Manual Section - 200.01A.1.b.(6) - The road centerline (RCL) and edge of pavement (EOP) elevations (also on a 20-ft grid) for roadways adjacent to and along all property lines, including EOP in cul-de-sacs at 9, 12, and 3 o’clock positions - Please include lot numbers as well Note: I have attached the SW infromational packet for reference.
ZON COMPLETE 07/15/2025 07/16/2025
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
URB COMPLETE 07/15/2025 07/21/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 12/26/2025
FC IMPACT FEE EMS ¤62.00 08/18/2025
IMPACT FEE FIRE ¤434.51 08/18/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/18/2025
FC IMPACT FEE LIBRARY ¤268.00 08/18/2025
IMPACT FEE PARKS ¤1,828.01 08/18/2025
IMPACT FEE SCHOOL ¤5,450.00 08/18/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 08/18/2025
WATER METER W/OUT TAP ¤965.03 08/18/2025
SURCHARGE FS 533.721 ¤15.11 08/18/2025
SURCHARGE - FS 468.631 ¤22.66 08/18/2025
SW ENG - FOUNDATION SURVEY ¤20.00 08/18/2025
SW ENG INSPECTION 80 ¤80.00 08/18/2025
SW ENG PRE APRON ¤30.00 08/18/2025
SW ENG - REVIEW 20 ¤20.00 08/18/2025
SW ENG RES REVIEW 200 ¤200.00 08/18/2025
WASTEWATER PERM INSPECTION ¤80.00 08/18/2025
WASTEWATER PERM REVIEW ¤25.00 08/18/2025
WATER PERMIT REVIEW ¤25.00 08/18/2025
SITE PLAN 30 ¤30.00 08/18/2025
WATER- TURN ON ¤50.00 08/18/2025
ADJUSTMENT 10% (¤167.85) 08/18/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/18/2025
INSPECTION - RESIDENTIAL ¤1,284.25 08/18/2025
PLAN REVIEW - RESIDENTIAL ¤364.26 08/18/2025
Fees Total Due: ¤0.00 Total Paid: ¤14,868.48