Permit #2025070588

Permit Details

Status: COED

Parcel Id: 07-11-31-7017-00040-0350
OPENED PORCH (WITH ROOF) : 1 sqft
GARAGE: 1 sqft
Total Square Footage: 2 sqft
Block: 00040
Subdivision: -
Job Phone: 832-726-2202
Location Address: 39 BOLLING LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/18/2025
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: ZZMZ CASPIAN LLC

Address

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

Address

162

ORLANDO, FL 32826

Lot: 0350
Contracted Stated Job Value: ¤131,500.00
Job Description: Single Family Residence
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/07/2026 Approval - Private Provider PPROVIDER
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/06/2026 APPROVED - AS NOTED RRICKS
Note: RRicks Original inspection was previously. Final Survey was uploaded by accident. Approved as noted.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/01/2026 Disapproved - NO FEE RRICKS
Note: RRicks 5-1-26 - Missing an elevation shot on lot 36, unable to to determine if this lot is being impacted or not. - Please capture the berm on the right side of this lot in the back yard. - Please ensure that the drainage swale maintain postive fall, 0.1 every 20'.
U -UTILITY RESIDENTIAL FINAL 02/11/2026 FINAL APPROVED BWRIGHT
U-CROSS CONNECTION 02/11/2026 APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 02/06/2026 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW FIELD SURVEY /GRADING CERTIFICATION 02/06/2026 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 02/06/2026 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/06/2026 APPROVED EMADISON
Note:
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/27/2026 Disapproved - NO FEE TPOLACEK
Note: 01-27-26 TPOLACEK*** YOU ARE REQUIRED TO UPLOAD A LOT GRADING AND DRAINAGE CHECLIST FOR REVIEW AND APPROVAL BEFORE ANY INSPECTIONS CAN BE COMPLETED. New document type: Final Lot Grading & Drainage Certification • Begins 7/1/25 – all 1 and 2 family dwelling permits submitted on or after 7/1/25 • Actual Lot Grading & Drainage Certification IS NOT submitted at time of permit application • Lot Grading & Drainage Certification submitted near completion of the home after installation of landscaping / sod and REPLACES the Final Survey • Same review process as current • Lot Grading & Drainage Certification must be on City Form – if not on City form permit revision / submittal will be rejected. • Lot Grading & Drainage Certification signed and sealed (digitally) by a Florida licensed Professional Engineer – no exceptions • If not by a PE – Lot Grading & Drainage Certification will be rejected
ROW- PRE-APRON (PRE-POUR) 12/18/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 12/17/2025 - PREVIOUS INSPECTION NOTES RECIEVED CALL FROM GRADER PIPE IS NOT SET ASKING TO CANEL
ROW- PRE-APRON (PRE-POUR) 12/17/2025 CANCELLED BY APPLICANT TPOLACEK
Note: RECIEVED CALL FROM GRADER PIPE IS NOT SET ASKING TO CANEL
ELECTRIC - EARLY POWER 12/16/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 11/07/2025 Approval - Private Provider PPROVIDER
INSULATION 11/04/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 10/28/2025 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 10/28/2025 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 10/28/2025 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 10/27/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROOF VALLEY & METAL 10/23/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 10/16/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/16/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 10/02/2025 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 09/23/2025 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 09/17/2025 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 09/12/2025 APPROVED PKNAPIK
FORMBOARD SURVEY (OFFICE USE ONLY) 09/11/2025 APPROVED RRICKS
WATER METER INSTALLATION REQUEST 09/02/2025 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 07/21/2025 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
BADMIN INFORMATION 05/06/2026 05/06/2026
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Missing attachment.
BADMIN INFORMATION 02/05/2026 02/05/2026
Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM The As-Built Final Lot Grading & Drainage Plan must be accompanied by the Final Lot Grading & Drainage Certification. It must be part of one file and not uploaded as a separate document. https://copc-strapi-production.s3.amazonaws.com/Final_Lot_Grading_and_Drainage_Certification_form_07_01_25_cc754b0282.pdf
BLD HOLD 09/11/2025 09/11/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech cert and density need to be digitally verifiable.
BLD COMPLETE 09/11/2025 09/12/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 09/10/2025 09/11/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 09/10/2025 09/10/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 08/13/2025 08/13/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 08/08/2025 08/08/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Site plan missing.
BADMIN COMPLETE 08/08/2025 08/13/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 08/08/2025 08/08/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
BLD CANCEL 08/08/2025 08/13/2025
ZON HOLD 08/08/2025 08/08/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Site plan submitted can't have drainage information on this one.
SW1 HOLD 08/05/2025 08/06/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please clearly depict a berm on the right back yard containing water to this lot. There shall also be a minimum of 0.3' fall from the top of the berm to the toe of the slope. - Please labeled patio and porch "FFE" with the proposed elevation. Please feel free to call or email if there are any questions.
BADMIN HOLD 08/05/2025 08/05/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM This is a written notice to the permit applicant in accordance with Florida Statute 553.791 (7) (a) and identifies specific plan features that do not comply with the applicable codes. Please note the following items and citations of the 2023 Florida Building Code-Building (FBCB), Florida Building Code-Existing Building (FBCEB), Florida Building Code-Accessibility (FBCA), Florida Building Code-Mechanical (FBCM), Florida Building Code-Energy Conservation (FBCBEC), Florida Building Code-Plumbing (FBCP), National Electric Code (NEC), Florida Statutes (F.S.) and Florida Administrative Code (F.A.C.). 1.ok 2. Product Approval FL# 16937-R2 out of cycle.
ENGIN1 COMPLETE 08/05/2025 08/06/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 08/05/2025 08/05/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Site plan is missing. Pevious hold comment was site plan missing map panel # and flood zone. Make sure site plan does not have any drainage information on it.
BADMIN HOLD 07/24/2025 07/29/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM This is a written notice to the permit applicant in accordance with Florida Statute 553.791 (7) (a) and identifies specific plan features that do not comply with the applicable codes. Please note the following items and citations of the 2023 Florida Building Code-Building (FBCB), Florida Building Code-Existing Building (FBCEB), Florida Building Code-Accessibility (FBCA), Florida Building Code-Mechanical (FBCM), Florida Building Code-Energy Conservation (FBCBEC), Florida Building Code-Plumbing (FBCP), National Electric Code (NEC), Florida Statutes (F.S.) and Florida Administrative Code (F.A.C.). 1. Roffing worksheet FL# 5444.2-R25 not valid 2. Product Approval FL# 19321-R2 out of cycle. We are in the 2023 review cycle. FL# 9589-R10 not valid FL# 16937-R3 out of cycle.
SW1 HOLD 07/24/2025 07/28/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Need more proposed elevations in the back right of this property. Based on the proposed elevations this lot is negatively impacting lot 21 from the back right corner of this lot. - Along with prpoposed finished floor elevation for concrete sturctures, please label it as proposed FFE to clearly depict it as such.
SWALE COMPLETE 07/16/2025 08/01/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
PLENV COMPLETE 07/16/2025 07/21/2025
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 07/21/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
BADMIN HOLD 07/15/2025 07/22/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM This is a written notice to the permit applicant in accordance with Florida Statute 553.791 (7) (a) and identifies specific plan features that do not comply with the applicable codes. Please note the following items and citations of the 2023 Florida Building Code-Building (FBCB), Florida Building Code-Existing Building (FBCEB), Florida Building Code-Accessibility (FBCA), Florida Building Code-Mechanical (FBCM), Florida Building Code-Energy Conservation (FBCBEC), Florida Building Code-Plumbing (FBCP), National Electric Code (NEC), Florida Statutes (F.S.) and Florida Administrative Code (F.A.C.). 1. Roffing worksheet FL# 5444-R16 out of cycle. We are in the 2023 review cycle. 2. Product Approval FL# 5444-R16 out of cycle. We are in the 2023 review cycle. FL# 16918-R2 out of cycle. FL# 19321-R2 out of cycle. FL# 9589-R6 out of cycle. FL# 16937-R3 out of cycle.
CUSVC COMPLETE 07/15/2025 07/21/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/15/2025 07/16/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
LOCATE COMPLETE 07/15/2025 07/16/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 07/15/2025 07/22/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM COPC Technical Manual Section - 200.01A.1.b.(11) - The Finished Floor Elevation (FFE) of the proposed home’s living space, attached and / or detached garages, attached and / or detached patios, lanais, porches, exterior door landings, sidewalks and similar shall be shown. Unattached pads solely for the purpose of supporting AC, LPG and pool equipment are exempt. - All attached garages, patios, lanais, porches, exterior door landings, sidewalks and similar shall show an FFE of not less than 0.33 tenths of a foot (4 inches) lower than the FFE of the home’s living space. Exception: Access ramps may rise to the FFE of the interior living space for the width of the ramp only. - All attached patios, lanais, porches, exterior door landings, sidewalks and similar and those located within 10 feet of the proposed home shall show a minimum slope perpendicular to the foundation of not less than 2%. Attached and detached garages shall show a positive slope to facilitate drainage towards the vehicle entrance. - When proposing a berm there shall a minimum of 0.3' fall from the top of the berm to the toe of the slope. - Please provide proposed elevations along the back property line clearly indicating what is proposed. - Along the back left of the property, there is a proposed grade of 25.3' and an existing elevation of 25..8'. Proposed grade shall match existing grades along improved properties.
ZON HOLD 07/15/2025 07/16/2025
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Site plan is missing map panel # and flood zone
PLENV COMPLETE 07/15/2025 07/21/2025
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 07/21/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤50.00 08/18/2025
ADJUSTMENT 10% (¤3.00) 08/18/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/18/2025
FC IMPACT FEE EMS ¤62.00 08/18/2025
IMPACT FEE FIRE ¤434.51 08/18/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/18/2025
FC IMPACT FEE LIBRARY ¤268.00 08/18/2025
IMPACT FEE PARKS ¤1,828.01 08/18/2025
IMPACT FEE SCHOOL ¤5,450.00 08/18/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 08/18/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 08/18/2025
SURCHARGE FS 533.721 ¤2.00 08/18/2025
SURCHARGE - FS 468.631 ¤2.00 08/18/2025
SW ENG - FOUNDATION SURVEY ¤20.00 08/18/2025
SW ENG INSPECTION 80 ¤80.00 08/18/2025
SW ENG PRE APRON ¤30.00 08/18/2025
SW ENG - REVIEW 20 ¤20.00 08/18/2025
SW ENG RES REVIEW 200 ¤200.00 08/18/2025
WATER METER W/ TAP ¤2,326.93 08/18/2025
SEWER CREDIT (¤1,342.00) 08/18/2025
WASTEWATER PERM INSPECTION ¤80.00 08/18/2025
WASTEWATER PERM REVIEW ¤25.00 08/18/2025
SEWER CAPITAL FACILITY ¤4,415.00 08/18/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 08/18/2025
WATER PERMIT REVIEW ¤25.00 08/18/2025
WATER MAIN EXTENSION IMPACT ¤917.27 08/18/2025
SITE PLAN 30 ¤30.00 08/18/2025
Fees Total Due: ¤0.00 Total Paid: ¤23,260.21