| Type |
Request Date |
Result |
Inspector |
|
ROW CABLE PROJECT STATUS |
01/13/2026 |
Status Check |
FSLADISH |
|
Note: 1/13/26 No work crew on site, no work being performed at the time of this inspection.
|
|
ROW CABLE PROJECT STATUS |
12/29/2025 |
Status Check |
FSLADISH |
|
Note: 12/29/25 No work crew on site, no work being performed at the time of this inspection.
|
|
ROW CABLE PROJECT STATUS |
12/15/2025 |
Status Check |
FSLADISH |
|
Note: 12/15/25 A JUNCTION BOX HAS BEEN ADDED IN PEDESTRIAN/ROADWAY MEDIAN NORTH OF WAWA. AREA HAS SMALL PILE OF DIRT THAT IS CONED OFF AND SECURED SAFELY. LOCATE FLAGS ARE PRESENT. THERE ARE NO CREW PERFORMING WORK AT THE TIME OF THIS STATUS CHECK (8:40 AM.).
|
|
ROW CABLE PROJECT STATUS |
12/01/2025 |
Status Check |
FSLADISH |
|
Note: 12/1/25 NO WORK BEING COMPLETED AT THE TIME OF THIS INSPECTION. NO DAMAGE OBSERVED.
|
|
ROW CABLE PROJECT STATUS |
11/04/2025 |
Status Check |
FSLADISH |
|
Note: 11/4/25 NO WORK BEING COMPLETED AT THE TIME OF THIS INSPECTION. NO DAMAGE OBSERVED.
|
|
ROW CABLE PROJECT STATUS |
10/21/2025 |
Status Check |
FSLADISH |
|
Note: 10/21/25 NO WORK BEING COMPLETED AT THE TIME OF THIS INSPECTION.
|
|
ROW - FINAL INSPECTION |
|
|
|
| Department |
Status |
Date In |
Date Out |
|
UD1 |
COMPLETE |
10/21/2025 |
10/22/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
|
|
TRENG |
COMPLETE |
10/02/2025 |
10/21/2025 |
| Note: Released By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM
|
|
RSI |
COMPLETE |
10/02/2025 |
10/06/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
|
|
UD1 |
HOLD |
10/02/2025 |
10/08/2025 |
| Note: Held By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
Please change the call out (ID) for the purple/pink lines to Reclaimed Water instead of SD (Storm Drain)
|
|
TRENG |
HOLD |
09/22/2025 |
09/25/2025 |
| Note: Held By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM
The proposed work along Bulldog Drive appears to be in close proximity to the existing sidewalk. Please submit the location of the directional drilling equipment as well as all bore pit locations. If any portion of the sidewalk is damaged as a result of construction activities or equipment, the contractor shall be responsible for removing and replacing the entire affected panel, from joint to joint. |
|
UD1 |
COMPLETE |
07/28/2025 |
07/28/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
|
|
TRENG |
HOLD |
07/28/2025 |
07/29/2025 |
| Note: Held By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM
Previous comments are not resolved. please provide information. |
|
RSI |
COMPLETE |
07/16/2025 |
07/23/2025 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
|
|
TRENG |
HOLD |
07/16/2025 |
07/24/2025 |
| Note: Held By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM
1. The proposed work is located within FDOT right-of-way. Please provide an approved FDOT permit
2. Additionally, the proposed work along Bulldog Drive appears to be in close proximity to the existing sidewalk. Please submit the location of the directional drilling equipment as well as all bore pit locations. If any portion of the sidewalk is damaged as a result of construction activities or equipment, the contractor shall be responsible for removing and replacing the entire affected panel, from joint to joint. |
|
UD1 |
HOLD |
07/16/2025 |
07/17/2025 |
| Note: Held By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
Please revise and resubmit drawings depicting existing water, sewer and reclaim mains as shown on GIS map, sent to kyle.mckenzie@metronet.com, robert.schlobach@metronet.com & phillip.balboa@metronet.com |