I want to search for...

Permit #2025070699

Permit Details

Status: INSPECT

Subdivision: 2161 - RIGHT OF WAY/STREETS/PATHS
Job Phone: 386-257-7912
Location Address: 10000 COLBERT LN
Type: ROW - RIGHT OF WAY
Issue Date: 08/06/2025
NOC: Unknown
Applicant name: ATT
Owner: CITY OF PALM COAST
Job Description: Colbert Lane DB 120' flexpipe w/fiber/Tr db 240'copper/fiber/Plc 1 dg/anc & 3 HH@2 Concord Ln
Type: CN

Contractor

AT&T
Status Location Address State License Number Phone
ACTIVE

268 N RIDGEWOOD AVE ROOM 232

DAYTONA BEACH, FL 32114

ATT 386-257-7912

Inspection History

Type Request Date Result Inspector
ROW- PROJECT STATUS 09/01/2025 Status Check EMADISON
ROW CABLE PROJECT STATUS 08/25/2025 Status Check EMADISON
ROW CABLE PROJECT STATUS 08/18/2025 Status Check PFLANAGAN
Note: NO WORKERS AT THIS TIME
ROW - FINAL INSPECTION

Review History

Department Status Date In Date Out
TRENG COMPLETE 07/30/2025 08/06/2025
Note: Released By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM
UD1 COMPLETE 07/25/2025 07/28/2025
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
TRENG HOLD 07/25/2025 07/29/2025
Note: Held By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM Please note that the proposed work is located on a County roadway, and the City of Palm Coast will be performing roadway improvements at this location. Therefore, both City and Flagler County Right-of-Way (ROW) permits are required. Refer to the Flagler County ROW permit application, available under the "Application - Manual" section. Complete the required information and submit the application directly to Flagler County. Once the ROW permit is approved, please provide a copy of the approved permit to the City of Palm Coast for final review and approval.
RSI COMPLETE 07/18/2025 07/25/2025
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
TRENG HOLD 07/18/2025 07/24/2025
Note: Held By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM Please refer to the uploaded roadway plans under RIGHT OF WAY INFORMATION for the Colbert Lane and Waterfront Park Road intersection improvements. The proposed construction sequence includes a temporary roadway to be built north of the existing alignment, followed by stormwater system improvements, and ultimately, a final roadway configuration that introduces dedicated left-turn and right-turn lanes into Waterfront Park Road. This final condition will result in a wider roadway footprint. Based on the current plans, the two proposed handholes (HH) located on the north side appear to be in conflict with the temporary roadway, and will likely remain in conflict with the future widened roadway section. Please revise the plans to eliminate these conflicts and ensure the HH locations are compatible with both the temporary and final roadway alignments.
UD1 HOLD 07/18/2025 07/21/2025
Note: Held By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM 1. A GIS Utility Map has been sent to bp4408@att.com and kd4964@att.com, please add existing utilities (water-blue, pink-reclaim and sanitary sewer-green) to project drawing.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
DUMMY FEE ¤1.00 08/06/2025
Fees Total Due: ¤0.00 Total Paid: ¤1.00