Permit #2025070788
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7016-00040-1820 |
| Total Square Footage: 576 sqft |
| Block: 00040 |
| Subdivision: 7016 - |
| Job Phone: 321-228-8247 |
| Location Address: 16 COLONIA CT |
| Type: PO - POOL |
| Issue Date: 09/16/2025 |
| NOC: RECORDED |
| Applicant name: CHARLES BUDDY COLLINS III |
| Owner: TINE MARK A & MICHELE H&W |
|
Address 93 RESERVIOR RD MIDDLETOWN, CT 06457 |
| Lot: 1820 |
| Contracted Stated Job Value: ¤114,211.00 |
| Job Description: inground concrete swimming pool with spa and screen enclosure, GAS BY OTHERS |
| Type: CN |
Contractor
COLLINSBUILT POOLS CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4240 AUDUBON AVE DE LEON SPRINGS, FL 32130 |
CPC1459157 (Exp: 08/31/2026) | 321-228-8247 |
Sub Contractors
ROBERT YORK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
560 S. YONGE ST. ORMOND BEACH, FL 32174 |
CBC1268129 (Exp: 08/31/2028) | (386)673-4589 | (386)673-8045 |
CHARLES BUDDY COLLINS III
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4240 AUDUBON AVE DE LEON SPRINGS, FL 32130 |
CPC1459157 (Exp: 08/31/2026) | 321-228-8247 |
ANTHONY ROBERT PETRAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3505 TRADE ST DELTONA, FL 32738 |
EC13006448 (Exp: 08/31/2026) | 386-804-1241 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 02/10/2026 | FINAL APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2610 1. Will need Termite spray Certificate for the deck at Final Inspection. Builder installing additional paver base and paver deck. Inspector Notes from Inspection 2600 1. Went in the morning and did the inspection all was good except missing some rebar for the steps per the plan. In the afternoon I did a virtual on the rebar that was missing on the steps. Ok to shut. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/06/2026 | FINAL APPROVED | BHAINES |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/05/2026 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/05/2026 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW - FINAL INSPECTION | 02/05/2026 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ELECTRIC AND ALARM | 01/23/2026 | APPROVED | MCONTRYMAN |
| POOL DECK | 12/16/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Will need Termite spray Certificate for the deck at Final Inspection. Builder installing additional paver base and paver deck. Inspector Notes from Inspection 2600 1. Went in the morning and did the inspection all was good except missing some rebar for the steps per the plan. In the afternoon I did a virtual on the rebar that was missing on the steps. Ok to shut. | |||
| STEEL AND GROUND | 11/07/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Went in the morning and did the inspection all was good except missing some rebar for the steps per the plan. In the afternoon I did a virtual on the rebar that was missing on the steps. Ok to shut. |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/29/2025 | 08/29/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BFLOOD | COMPLETE | 08/26/2025 | 09/02/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/26/2025 | 08/27/2025 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. SHOW POOL DECK DIMENSIONS ON SITE PLAN 2ND REQUEST | |||
| BLD | COMPLETE | 08/26/2025 | 09/02/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| RSI | COMPLETE | 08/14/2025 | 08/14/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BFLOOD | HOLD | 08/14/2025 | 08/20/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Structural systems supporting proposed pool to be designed, connected and anchored to resist flotation, collapse or permanent lateral movement due to structural loads and stresses from flooding equal to the design flood elevation. Provide engineering statement on engineered pool plans confirming design conforms to this section. For previously approved Pool Master Plans, provide engineer's statement signed and sealed by the engineer on separate letterhead referencing this site address and permit number. R322.1.2. 2. Pool equipment shall be installed at or above the design flood elevation provided it is elevated to the extent practical and is anchored to prevent flotation and resist flood forces and is supplied by branch circuits that have ground-fault cicuit interrupter protection. Electrical wiring systems are permitted below the design flood elevation provided they conform to the provisions of the Electrical Code for wet locations. Add note to plans indicating a.) pool equipment will be installed at the highest elevation possible; b.) that all pool equiment will be anchored in a manner to prevent flotation and to resist flood forces; c.) that pool electrical equipment will be provided with branch circuites that are ground-fault circuit interrupter protected and d.) that all electrical equipment to be installed as required for wet locations per the 2020 NEC. R322.1.6 Exception. 3. ok | |||
| BFLOOD | HOLD | 07/21/2025 | 07/28/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Structural systems supporting proposed pool to be designed, connected and anchored to resist flotation, collapse or permanent lateral movement due to structural loads and stresses from flooding equal to the design flood elevation. Provide engineering statement on engineered pool plans confirming design conforms to this section. For previously approved Pool Master Plans, provide engineer's statement signed and sealed by the engineer on separate letterhead referencing this site address and permit number. R322.1.2. 2. Pool equipment shall be installed at or above the design flood elevation provided it is elevated to the extent practical and is anchored to prevent flotation and resist flood forces and is supplied by branch circuits that have ground-fault cicuit interrupter protection. Electrical wiring systems are permitted below the design flood elevation provided they conform to the provisions of the Electrical Code for wet locations. Add note to plans indicating a.) pool equipment will be installed at the highest elevation possible; b.) that all pool equiment will be anchored in a manner to prevent flotation and to resist flood forces; c.) that pool electrical equipment will be provided with branch circuites that are ground-fault circuit interrupter protected and d.) that all electrical equipment to be installed as required for wet locations per the 2020 NEC. R322.1.6 Exception. 3. Contractor for retaining wall to obtain permit prior to release of pool permit | |||
| BLD | COMPLETE | 07/21/2025 | 07/24/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/21/2025 | 07/24/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/21/2025 | 07/22/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| RSI | HOLD | 07/21/2025 | 07/25/2025 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM The applicant must show the drainage pattern on the on-site plan with arrows showing that stormwater will drain to the front swale. | |||
| ZON | INFORMATION | 07/21/2025 | 07/21/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. SHOW POOL DECK DIMENSIONS ON SITE PLAN |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤27.97) | 09/16/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/16/2025 |
| INSPECTION- POOL | ¤160.00 | 09/16/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤89.70 | 09/16/2025 |
| SURCHARGE FS 533.721 | ¤2.52 | 09/16/2025 |
| SURCHARGE - FS 468.631 | ¤3.78 | 09/16/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 09/16/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/16/2025 |
| SITE PLAN 30 | ¤30.00 | 09/16/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤348.03 |