I want to search for...

Permit #2025071118

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7033-00240-0120
Block: 00240
Subdivision: 7033 -
Job Phone: 386-872-8025
Location Address: 16 RED MILL DR
Type: DR - DRIVEWAY
Issue Date: 08/01/2025
NOC: RECORDED
Applicant name: STEPHEN SEAN LAWRENCE
Owner: MOORHEAD JAKE MICHAEL & ALLISON REID MOORHEAD JTWR

Address

16 RED MILL DRIVE

PALM COAST, FL 32164

Lot: 0120
Contracted Stated Job Value: ¤11,000.00
Job Description: CONCRETE CIRCULAR DRIVEWAY
Type: CN

Contractor

ACANTHUS CONSTRUCTION LLC
Status Location Address State License Number Phone
ACTIVE

54 BURNELL DRIVE

PALM COAST, FL 32137

CGC1535903 (Exp: 08/31/2026) 386-318-1125

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 11/12/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 11/7/2025 - PREVIOUS INSPECTION NOTES NEED TO CHIP ALL OVER POUR CONCRETE IUT OF THE CULVERT
ROW - FINAL INSPECTION 11/07/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO CHIP ALL OVER POUR CONCRETE IUT OF THE CULVERT
ROW - FINAL APRON (AFTER POUR) 11/07/2025 APPROVED - AS NOTED PFLANAGAN
Note: THE INVERT WAS OUT OF TOLERANCE BY .10 PASSING AS NOTED THAT IT WILL BE OK WITH THE RUN
ROW - FINAL INSPECTION 11/06/2025 Disapproved - NO FEE FSLADISH
Note: 11/6/25 YOU WILL NEED TO REMOVE THE FORMBOARDS AND CONCRETE OVERPOUR IN THE MITERED ENDS, WE REQUIRE ALL CONCRETE BE REMOVED FROM CULVERT PIPE RIBS AND HAVE A CLEAN PIPE. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9270 08/19/25 TPOLACEK*** PLEASE RESHOOT BEFORE POURING DRIVEWAY THE CULVERT IS AT THE MAX ELEVATION BEFORE BEING OUT OF TOLERANCE. IF CULVERT IS OUT OF TOLERANCE WHEN AFTER POUR IS CONDUCTED PIPE MAY HAVE TO BE REMOVED AND RESET. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
ROW - FINAL APRON (AFTER POUR) 11/06/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 11/6/25 YOU WILL NEED TO REMOVE THE FORMBOARDS AND CONCRETE OVERPOUR IN THE MITERED ENDS, WE REQUIRE ALL CONCRETE BE REMOVED FROM CULVERT PIPE RIBS AND HAVE A CLEAN PIPE. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9270 08/19/25 TPOLACEK*** PLEASE RESHOOT BEFORE POURING DRIVEWAY THE CULVERT IS AT THE MAX ELEVATION BEFORE BEING OUT OF TOLERANCE. IF CULVERT IS OUT OF TOLERANCE WHEN AFTER POUR IS CONDUCTED PIPE MAY HAVE TO BE REMOVED AND RESET. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
U -UTILITY RESIDENTIAL FINAL 11/06/2025 FINAL APPROVED BHAINES
ROW- PRE-APRON (PRE-POUR) 08/19/2025 APPROVED - AS NOTED TPOLACEK
Note: 08/19/25 TPOLACEK*** PLEASE RESHOOT BEFORE POURING DRIVEWAY THE CULVERT IS AT THE MAX ELEVATION BEFORE BEING OUT OF TOLERANCE. IF CULVERT IS OUT OF TOLERANCE WHEN AFTER POUR IS CONDUCTED PIPE MAY HAVE TO BE REMOVED AND RESET. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 07/29/2025 07/29/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
UTL COMPLETE 07/29/2025 07/30/2025
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 07/29/2025 07/29/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 07/29/2025 08/01/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 11/10/2025
RSI REINSPECTION 1 ¤35.00 11/06/2025
ADJUSTMENT 10% (¤3.00) 08/01/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/01/2025
SW ENG INSPECTION 40 ¤40.00 08/01/2025
SW ENG PRE APRON ¤30.00 08/01/2025
SW ENG RES REVIEW 200 ¤200.00 08/01/2025
SITE PLAN 15 ¤15.00 08/01/2025
Fees Total Due: ¤0.00 Total Paid: ¤382.00