Permit #2025080442

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7059-00610-0300
CONDITIONED SPACE: 2400 sqft
GARAGE: 566 sqft
OPENED PORCH (WITH ROOF) : 350 sqft
Total Square Footage: 3316 sqft
Block: 00610
Subdivision: 7059 -
Job Phone: 386-283-2035
Location Address: 46 SLEEPY HOLLOW TRL
Type: DU - DUPLEX
Issue Date: 09/18/2025
NOC: RECORDED
Applicant name: OLEG BELINSKIY
Owner: FLORIDAS BEST BUILDERS INC

Address

19 PINE CIRCLE DR

PALM COAST, FL 32164

Lot: 0300
Contracted Stated Job Value: ¤350,000.00
Job Description: DUPLEX
Type: CN

Contractor

FLORIDAS BEST BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE

PALM COAST, FL 32164

CBC1264760 (Exp: 08/31/2026) 386-283-2035

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
TIMUR ISPARYAN
Status Location Address State License Number Phone Fax
ACTIVE

3665 SPRINK PARK ROAD

JACKSONVILLE , FL 32207

CMC1249968 (Exp: 08/31/2026) 904-245-1818 904-337-1910
FERNANDO MEZA SR
Status Location Address State License Number Phone
ACTIVE

457 CHELSEA PLACE AVE

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2026) 386-241-5211

Inspection History

Type Request Date Result Inspector
ROW- PRE-APRON (PRE-POUR) 05/27/2026 APPROVED FSLADISH
Note: 5/27/26 YOU ARE APPROVED TO LAY PAVERS AS OF THIS INSPECTION. _______________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 5/27/26 THIS IS A DUPLICATE INSPECTION. THIS WAS APPROVED 5/21/26 APPROVING AS NOTED. Inspector Notes from Inspection 9271 5/21/26 ACCIDENTALLY APPROVED A SECONDARY PRE POUR INSTEAD OF A PAVER RESTRAINT INSPECTION. I AM GOING TO APPROVE THIS AS NOTED AND CREATE AN ADDITIONAL PREPOUR INSPECTION. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS Inspector Notes from Inspection 9270 5/20/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 5/20/2026 - PREVIOUS INSPECTION NOTES 5/20/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS. 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26 CANCELLING AS A COURTESY.
ROW- PAVER RESTRAINTS 05/27/2026 APPROVED - AS NOTED FSLADISH
Note: 5/27/26 THIS IS A DUPLICATE INSPECTION. THIS WAS APPROVED 5/21/26 APPROVING AS NOTED. Inspector Notes from Inspection 9271 5/21/26 ACCIDENTALLY APPROVED A SECONDARY PRE POUR INSTEAD OF A PAVER RESTRAINT INSPECTION. I AM GOING TO APPROVE THIS AS NOTED AND CREATE AN ADDITIONAL PREPOUR INSPECTION. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS Inspector Notes from Inspection 9270 5/20/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 5/20/2026 - PREVIOUS INSPECTION NOTES 5/20/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS. 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26 CANCELLING AS A COURTESY.
ROW- PAVER RESTRAINTS 05/21/2026 APPROVED - AS NOTED FSLADISH
Note: 5/21/26 ACCIDENTALLY APPROVED A SECONDARY PRE POUR INSTEAD OF A PAVER RESTRAINT INSPECTION. I AM GOING TO APPROVE THIS AS NOTED AND CREAT AN ADDITIONAL PREPOUR INSPECTION. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS Inspector Notes from Inspection 9270 5/20/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 5/20/2026 - PREVIOUS INSPECTION NOTES 5/20/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS. 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26 CANCELLING AS A COURTESY.
ROW- PRE-APRON (PRE-POUR) 05/20/2026 PARTIALLY APPROVED FSLADISH
Note: 5/20/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS. 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26 CANCELLING AS A COURTESY.
ROW- PRE-APRON (PRE-POUR) 05/20/2026 APPROVED - AS NOTED FSLADISH
Note: 5/20/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 5/20/2026 - PREVIOUS INSPECTION NOTES 5/20/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS. 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26 CANCELLING AS A COURTESY.
ROW- PAVER RESTRAINTS 05/18/2026 CANCELLED BY APPLICANT FSLADISH
Note: 5/18/26 CANCELLING AS A COURTESY.
ROW- PRE-APRON (PRE-POUR) 05/18/2026 CANCELLED BY APPLICANT FSLADISH
Note: 5/18/26 CANCELLING AS A COURTESY.
SEWER TIE IN 05/04/2026 APPROVED KSANDOE
Note: 4/30/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-uncovert drain pipe all throug the pep tank to confirm tie in 4/28/2026 - PREVIOUS INSPECTION NOTES please fix items before next inspection ( City of Palm Coast Requirements ) #1-According to local Florida utility requirements (specifically Palm Coast, which utilizes Pretreatment Effluent Pumping "PEP" tanks), the sewer tie-in must be made from the house, through a cleanout, to the PEP tank on the property line . Key Requirements for PEP Tank Tie-ins: #1-Location: PEP tanks are installed in the utility right-of-way/easement, typically opposite the water meter. #2-Tie-in Point: The plumber connects the house gravity sewer to the inlet side of the PEP tank. #3-Cleanout: A 6” cleanout stack must be installed on the sewer stub-out by the house. #4-Connection Method: Use a 6” x 4” eccentric reducer if connecting to a 6-inch service line, ensuring the flow channel side is at the bottom to maintain flow. #5-Distance: The PEP tank cleanout must be placed within 3 feet from the end of the tank. #6-Site Constraints: No driveways or plantings are allowed within 4.5 feet of the sides of the lid, 3 feet in front, or 9 feet behind the PEP tank lid. #7-Panel Placement: The control panel must be located within 5 feet of the front corner of the building. These regulations are enforced by city utility inspectors, requiring all pipes to be exposed at the time of inspection.
ELECTRIC - EARLY POWER 05/04/2026 APPROVED KSANDOE
GRAVITY SEWER TEST 04/30/2026 APPROVED CVANSTRAHLEN
Note: 4/28/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Water level low on right side of the building
SEWER TIE IN 04/30/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection #1-uncovert drain pipe all throug the pep tank to confirm tie in 4/28/2026 - PREVIOUS INSPECTION NOTES please fix items before next inspection ( City of Palm Coast Requirements ) #1-According to local Florida utility requirements (specifically Palm Coast, which utilizes Pretreatment Effluent Pumping "PEP" tanks), the sewer tie-in must be made from the house, through a cleanout, to the PEP tank on the property line . Key Requirements for PEP Tank Tie-ins: #1-Location: PEP tanks are installed in the utility right-of-way/easement, typically opposite the water meter. #2-Tie-in Point: The plumber connects the house gravity sewer to the inlet side of the PEP tank. #3-Cleanout: A 6” cleanout stack must be installed on the sewer stub-out by the house. #4-Connection Method: Use a 6” x 4” eccentric reducer if connecting to a 6-inch service line, ensuring the flow channel side is at the bottom to maintain flow. #5-Distance: The PEP tank cleanout must be placed within 3 feet from the end of the tank. #6-Site Constraints: No driveways or plantings are allowed within 4.5 feet of the sides of the lid, 3 feet in front, or 9 feet behind the PEP tank lid. #7-Panel Placement: The control panel must be located within 5 feet of the front corner of the building. These regulations are enforced by city utility inspectors, requiring all pipes to be exposed at the time of inspection.
SEWER TIE IN 04/28/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: please fix items before next inspection ( City of Palm Coast Requirements ) #1-According to local Florida utility requirements (specifically Palm Coast, which utilizes Pretreatment Effluent Pumping "PEP" tanks), the sewer tie-in must be made from the house, through a cleanout, to the PEP tank on the property line . Key Requirements for PEP Tank Tie-ins: #1-Location: PEP tanks are installed in the utility right-of-way/easement, typically opposite the water meter. #2-Tie-in Point: The plumber connects the house gravity sewer to the inlet side of the PEP tank. #3-Cleanout: A 6” cleanout stack must be installed on the sewer stub-out by the house. #4-Connection Method: Use a 6” x 4” eccentric reducer if connecting to a 6-inch service line, ensuring the flow channel side is at the bottom to maintain flow. #5-Distance: The PEP tank cleanout must be placed within 3 feet from the end of the tank. #6-Site Constraints: No driveways or plantings are allowed within 4.5 feet of the sides of the lid, 3 feet in front, or 9 feet behind the PEP tank lid. #7-Panel Placement: The control panel must be located within 5 feet of the front corner of the building. These regulations are enforced by city utility inspectors, requiring all pipes to be exposed at the time of inspection.
GRAVITY SEWER TEST 04/28/2026 Disapproved - NO FEE CVANSTRAHLEN
Note: Please fix items before next inspection #1- Water level low on right side of the building
PEP TANK INSTALLATION REQUEST 04/02/2026 APPROVED ISANDERSON
INSULATION 03/26/2026 APPROVED CVANSTRAHLEN
Note: 3/25/2026 - PREVIOUS INSPECTION NOTES Please read note from previous inspection Left side is fix , right side need attention 3/24/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-Need solid blocking on garage double wall middle , penetration throug attic ( right side need bloking , Opening is about 1") left side need fire rate foam , opening is about 1/8" FBC R302.11
INSULATION 03/25/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please read note from previous inspection Left side is fix , right side need attention 3/24/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-Need solid blocking on garage double wall middle , penetration throug attic ( right side need bloking , Opening is about 1") left side need fire rate foam , opening is about 1/8" FBC R302.11
INSULATION 03/24/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection #1-Need blocking on garage double wall middle , penetration throug attic ( right side need bloking , Opening is about 1") left side need fire rate foam , opening is about 1/8" FBC R302.11
LATH/BRICK/ WATER BARRIER 03/19/2026 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2420 Please fix item before next inspection #1-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( unit A and B )
ALL ROUGH 03/13/2026 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix item before next inspection #1-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( unit A and B )
FIREWALL FINAL 02/17/2026 APPROVED BTAYLOR
FIREWALL DRYWALL NAILING 02/12/2026 APPROVED BTAYLOR
ROOF VALLEY & METAL 02/09/2026 APPROVED BTAYLOR
WALL SHEATHING 02/05/2026 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/05/2026 APPROVED BTAYLOR
FIREWALL FRAMING 02/05/2026 APPROVED BTAYLOR
TIE BEAM / LINTEL 01/16/2026 APPROVED CVANSTRAHLEN
MONOLITHIC SLAB 12/09/2025 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 12/04/2025 APPROVED MGIBSON
Note: WATER SERVICE NOT RAN YET
FORMBOARD SURVEY (OFFICE USE ONLY) 12/03/2025 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 11/19/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 11/06/2025 APPROVED CBOWERMASTER
U-CROSS CONNECTION
BLD - BUILDING FINAL
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 05/18/2026 05/27/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
SW1 COMPLETE 01/08/2026 01/09/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 01/08/2026 01/08/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 COMPLETE 12/03/2025 12/03/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 12/03/2025 12/03/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 11/24/2025 11/25/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM The dimensions along the front of the home on the formboard does not match dimensions on the approved grading. Please revise as needed. Please feel free to call or email if there are any questions or concerns.
ZON COMPLETE 11/24/2025 11/24/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 11/19/2025 11/19/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
MECH COMPLETE 08/20/2025 08/20/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/20/2025 08/21/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 08/14/2025 08/15/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN COMPLETE 08/12/2025 08/15/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 08/12/2025 08/15/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 08/12/2025 08/18/2025
Note: Released By: MICHELLE MCPARTLAND - -
ELEC COMPLETE 08/12/2025 08/18/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/12/2025 08/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 08/12/2025 08/12/2025
LOCATE COMPLETE 08/12/2025 08/14/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 08/12/2025 08/13/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide return duct transfer sizes on duct layout
SW1 HOLD 08/12/2025 08/13/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM There shall be a minumum of 0.3' fall from lot 31 to the common swale on the right side. Please revise so that the 0.3' fall is maintained throughout the common swale.
ZON HOLD 08/12/2025 08/13/2025
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM for recording purposes the original ROW agreement must be turn in.
SWALE COMPLETE 08/12/2025 08/15/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/18/2026
REINSPECTION FEE ¤40.00 05/18/2026
REINSPECTION RESIDENTIAL ¤40.00 05/18/2026
REINSPECTION RESIDENTIAL ¤40.00 05/18/2026
CONTRACTOR CHANGE ¤20.00 05/18/2026
FC IMPACT FEE EMS ¤124.00 09/18/2025
IMPACT FEE FIRE ¤869.02 09/18/2025
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 09/18/2025
FC IMPACT FEE LIBRARY ¤536.00 09/18/2025
IMPACT FEE PARKS ¤3,656.02 09/18/2025
IMPACT FEE SCHOOL ¤10,900.00 09/18/2025
RECORDING FEE REIMBURSE DOC ¤44.00 09/18/2025
PEP TANK INSTALL ¤1,513.48 09/18/2025
WATER- TURN ON ¤100.00 09/18/2025
ADJUSTMENT 10% (¤166.09) 09/18/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/18/2025
INSPECTION - RESIDENTIAL ¤1,270.50 09/18/2025
PLAN REVIEW - RESIDENTIAL ¤360.36 09/18/2025
WASTEWATER MAIN EXTENSION IMPA ¤4,770.00 09/18/2025
SURCHARGE FS 533.721 ¤14.95 09/18/2025
SURCHARGE - FS 468.631 ¤22.42 09/18/2025
SW ENG - FOUNDATION SURVEY ¤20.00 09/18/2025
SW ENG INSPECTION 80 ¤80.00 09/18/2025
SW ENG PRE APRON ¤30.00 09/18/2025
SW ENG - REVIEW 20 ¤20.00 09/18/2025
SW ENG RES REVIEW 200 ¤200.00 09/18/2025
WATER METER W/ TAP ¤4,653.86 09/18/2025
TRANSPORTATION IMPACT FEE ¤2,974.00 09/18/2025
SEWER CREDIT (¤1,700.00) 09/18/2025
WASTEWATER PERM INSPECTION ¤80.00 09/18/2025
WASTEWATER PERM REVIEW ¤100.00 09/18/2025
SEWER CAPITAL FACILITY ¤8,830.00 09/18/2025
WATER CAPITAL FACILITY FEE ¤7,580.98 09/18/2025
WATER PERMIT INSPECTION ¤80.00 09/18/2025
WATER MAIN EXTENSION IMPACT ¤1,834.54 09/18/2025
SITE PLAN 30 ¤30.00 09/18/2025
Fees Total Due: ¤0.00 Total Paid: ¤49,474.04