I want to search for...

Permit #2025080477

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7097-00000-0001
Block: 00000
Subdivision: 7097 -
Job Phone: 386-627-8289
Location Address: 38 CLUB HOUSE DR
Type: CSW - COMMERCIAL SEAWALL
Issue Date: 09/05/2025
NOC: RECORDED
Applicant name: ROBERT E WILLIAMS
Owner: PALM CLUB CONDOMINIUM

Address

DEC REC OR 78 PG 55

, 0

Address

COMMON AREAS

, 0

Lot: 0001
Contracted Stated Job Value: ¤1,267,000.00
Job Description: Remove and replace 1646' of existing seawall, 200' at a time with inspections
Type: CN

Contractor

ELITE MARINE CONSTRUCTION LLC
Status Location Address State License Number Phone
ACTIVE

14 UTILITY DR SUITE9

PALM COAST, FL 32137

SCC131152486 (Exp: 08/31/2026) 386-627-8289

Inspection History

Type Request Date Result Inspector
SEAWALL DEADMAN CAP 05/20/2026 PARTIALLY APPROVED HCAMACHO
Note: Next 200' of wall, cap and deadman. 4/16/2026 - PREVIOUS INSPECTION NOTES Next 200' of wall, cap and deadman. 2/4/2026 - PREVIOUS INSPECTION NOTES Next 200' of wall, cap and deadman. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. Doing 200' of new wall starting on the portion that is existing. 11/7/2025 - PREVIOUS INSPECTION NOTES 1. Doing 275' of wall on the right side of the property up to the residential property that has a wall with no Seawall Cap. 2. Please keep the tubidity in place during construction. 3. About 1/2 way on this 275' of wall there is an existing storm drain coming through the wall.
SEAWALL DEADMAN CAP 04/16/2026 PARTIALLY APPROVED HCAMACHO
Note: Next 200' of wall, cap and deadman. 2/4/2026 - PREVIOUS INSPECTION NOTES Next 200' of wall, cap and deadman. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. Doing 200' of new wall starting on the portion that is existing. 11/7/2025 - PREVIOUS INSPECTION NOTES 1. Doing 275' of wall on the right side of the property up to the residential property that has a wall with no Seawall Cap. 2. Please keep the tubidity in place during construction. 3. About 1/2 way on this 275' of wall there is an existing storm drain coming through the wall.
SEAWALL DEADMAN CAP 02/04/2026 PARTIALLY APPROVED HCAMACHO
Note: Next 200' of wall, cap and deadman. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. Doing 200' of new wall starting on the portion that is existing. 11/7/2025 - PREVIOUS INSPECTION NOTES 1. Doing 275' of wall on the right side of the property up to the residential property that has a wall with no Seawall Cap. 2. Please keep the tubidity in place during construction. 3. About 1/2 way on this 275' of wall there is an existing storm drain coming through the wall.
SEAWALL DEADMAN CAP 12/22/2025 PARTIALLY APPROVED HCAMACHO
Note: 1. Doing 200' of new wall starting on the portion that is existing. 11/7/2025 - PREVIOUS INSPECTION NOTES 1. Doing 275' of wall on the right side of the property up to the residential property that has a wall with no Seawall Cap. 2. Please keep the tubidity in place during construction. 3. About 1/2 way on this 275' of wall there is an existing storm drain coming through the wall.
SEAWALL DEADMAN CAP 11/07/2025 PARTIALLY APPROVED HCAMACHO
Note: 1. Doing 275' of wall on the right side of the property up to the residential property that has a wall with no Seawall Cap. 2. Please keep the tubidity in place during construction. 3. About 1/2 way on this 275' of wall there is an existing storm drain coming through the wall.
SEAWALL DEADMAN CAP
Note: 5/20/2026 - PREVIOUS INSPECTION NOTES Next 200' of wall, cap and deadman. 4/16/2026 - PREVIOUS INSPECTION NOTES Next 200' of wall, cap and deadman. 2/4/2026 - PREVIOUS INSPECTION NOTES Next 200' of wall, cap and deadman. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. Doing 200' of new wall starting on the portion that is existing. 11/7/2025 - PREVIOUS INSPECTION NOTES 1. Doing 275' of wall on the right side of the property up to the residential property that has a wall with no Seawall Cap. 2. Please keep the tubidity in place during construction. 3. About 1/2 way on this 275' of wall there is an existing storm drain coming through the wall.
SEAWALL CAP
SEAWALL FINAL
LDSC- LANDSCAPE FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 08/25/2025 09/02/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 08/13/2025 08/15/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide structural connection of seawall cap and panels ro adjacent seawall cap and panels or provide a seawall return. Seawall returns to extend a minimum of 10 Feet into the property and constructed in the same manner as other parts of the seawall. The seawall return may need to extend further into the lot a sufficient distance to ensure the completed post-construction grading can be completedin a manner so that the lot stormwater drainage remains on the lot until it flows over the seawall and does not top or circumvent the return and impact adjacent lot owner. COPCTM SECTION 1100.09, DRAWING #1100.G. 2. Add note on seawall engineering plans indicating the elevation of the seawall bulkhead cap to be not more than 2.5 NAVD. Show note at both ends of seawall. COPCTM Section1100.09 E.
DSD COMPLETE 08/13/2025 08/13/2025
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM
PLENG COMPLETE 08/13/2025 08/13/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤354.68) 09/05/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/05/2025
INSPECTION - RESIDENTIAL ¤3,484.25 09/05/2025
PLAN REVIEW - MISC 32.50 ¤32.50 09/05/2025
SURCHARGE FS 533.721 ¤31.92 09/05/2025
SURCHARGE - FS 468.631 ¤47.88 09/05/2025
SW ENG REVIEW- 40 ¤40.00 09/05/2025
SW ENG - INSPECTION 20 ¤20.00 09/05/2025
SW ENG - REVIEW 20 ¤20.00 09/05/2025
SITE PLAN 15 ¤15.00 09/05/2025
Fees Total Due: ¤0.00 Total Paid: ¤3,366.87