I want to search for...

Permit #2025080494

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7002-00070-0020
Block: 00070
Subdivision: -
Job Phone: 386-931-6577
Location Address: 3 FERGUSON CT
Type: BH - BOATHOUSE
Issue Date: 09/15/2025
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: MARK & LUCILA HOCAMP

Address

45 OLD OAK DRIVE SOUTH

PALM COAST, FL 32137

Lot: 0020
Contracted Stated Job Value: ¤55,000.00
Job Description: BOAT HOUSE & DOCK
Type: CN

Contractor

A PLUS HOME IMPROVEMENTS LLC
Status Location Address State License Number Phone
ACTIVE

306 S RAILROAD ST

BUNNELL, FL 32110

CRC1327024 (Exp: 08/31/2026) 386-263-2167

Inspection History

Type Request Date Result Inspector
FINAL - BUILDING MISC 10/27/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/27/2025 10:37:54 AM *** 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25 No plans or permit paperwork on site, please have a full set of plans onsite with Building Dept. stamp of approval for inspection FBC 107.3.1
FINAL - BUILDING MISC 10/24/2025 Disapproved - NO FEE MKRASKI
Note: 10/24/25 No plans or permit paperwork on site, please have a full set of plans onsite with Building Dept. stamp of approval for inspection FBC 107.3.1

Review History

Department Status Date In Date Out
BADMIN COMPLETE 09/10/2025 09/10/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BADMIN HOLD 09/05/2025 09/05/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM application submitted on 08/22 is for a dock not a boat house please correct.
BLD COMPLETE 09/05/2025 09/10/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON COMPLETE 09/05/2025 09/08/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 09/03/2025 09/04/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD HOLD 09/03/2025 09/05/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Plan sheet 4 still looks to be cut off. Please upload complete pages. 2. OK
BADMIN HOLD 09/03/2025 09/03/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM application submitted on 08/22 is for a dock not a boat house please correct.
ZON HOLD 08/20/2025 08/20/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. Setbacks from projection of side property line to structure installation shall be a minimum of 10'. For docks with slips, an additional foot of setback will be required for every foot of slipway over 20 feet. Site plan must be adjusted. 2. Engineered drawing must have total roof dimensions. 3. Site plan must show roof location (you can use a dotted line) and also please write in the dimensions of the roof.
ZON HOLD 08/19/2025 08/19/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. Setbacks from projection of side property line to structure installation shall be a minimum of 10'. For docks with slips, an additional foot of setback will be required for every foot of slipway over 20 feet. Site plan must be adjusted. 2. Engineered drawing must have total roof dimensions. 3. Site plan must show roof location (you can use a dotted line) and also please write in the dimensions of the roof. 4. Please submit original License Agreement for Saltwater Access.
BLD HOLD 08/19/2025 08/21/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Plan sheet 3 and 4 look to be cut off. Please upload complete pages. 2. PT beams missing at waters edge in plans.
BADMIN HOLD 08/19/2025 08/19/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Per Scott, please submit signed and notarized permit application with owner name.
BLD HOLD 08/13/2025 08/18/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Please priovide engineered drawing for review.
ZON HOLD 08/13/2025 08/13/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. According to the deed to the property, the ownership that you have listed on the License Agreement is incorrect. The Agreement also needs to be the Agreement for properties deeded in a trust - you cannot use the standard Agreement when the ownership is a trust. Please note that all pages of the Agreement must be properly completed in the trustee/trust name, along with the signature lines and the notary section. 2. When submitting the correct License Agreement with the correct ownership, please DO NOT remove the City logo and Clerk's return to information from the top of the form. 3. Please submit engineered drawings. Unable to complete a zoning review without the engineering drawings. - ADDITIONAL COMMENTS WILL BE PROVIDED ONCE ALL REQUIRED DOCUMENTS ARE SUBMITTED.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤24.63) 09/15/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/15/2025
INSPECTION - RESIDENTIAL ¤151.25 09/15/2025
PLAN REVIEW - RESIDENTIAL ¤65.00 09/15/2025
SURCHARGE FS 533.721 ¤2.22 09/15/2025
SURCHARGE - FS 468.631 ¤3.33 09/15/2025
SITE PLAN 30 ¤30.00 09/15/2025
Fees Total Due: ¤0.00 Total Paid: ¤257.17