I want to search for...
Permit #2025080612
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7024-00020-0280 |
| CONDITIONED SPACE: 2108 sqft |
| GARAGE: 757 sqft |
| OPENED PORCH (WITH ROOF) : 342 sqft |
| OPENED PORCH (WITH ROOF) : 137 sqft |
| Total Square Footage: 3344 sqft |
| Block: 00020 |
| Subdivision: - |
| Job Phone: 386-627-0430 |
| Location Address: 7 PRINCESS ELLEN PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/26/2025 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: PHILIP A ARMACIDA |
|
Address 45 LARAMIE DR PALM COAST, FL 32137 |
| Lot: 0280 |
| Contracted Stated Job Value: ¤450,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CRC1332537 (Exp: 08/31/2026) | 386-445-7945 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 06/10/2026 | PARTIALLY APPROVED | FSLADISH |
| Note: 6/10/26 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS PREPOUR INSPECTION. WITH RAIN IN THE FORECAST IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT ALL WATER IS OUT OF POUR AREA, IT IS PROPERLY COMPACTED AND THE PIPE ELEVATION HAS NOT CHANGED SINCE THIS INSPECTION. 6/10/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 5/28/2026 - PREVIOUS INSPECTION NOTES 5/28/26 YOUR GRADING AND DRAINAGE PLAN DOES NOT SHOW A PAVER DRIVEWAY. YOU DO NOT HAVE A PAVER DRIVEWAY DETAIL SHEET UPLOADED. YOUR LEFT SIDE CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AND YOUR RIGHT SIDE CULVERT PIPE IS BACKPITCHED AT THE TIME OF THIS INSPECTION. PLEASE REVISE SITE PLA TO INCLUDE A PAVER DRIVEWAY AND UPLOAD A PAVER DRIVEWAY DETAIL SHEET WITH THE OPTION YOU ARE CHOOSING CIRCLED OR OTHERWISE INDICATED BEFORE RESUBMITTING FOR A PREPOUR INSPECTION. | |||
| ROW- PAVER RESTRAINTS | 06/10/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR DRIVEWAY PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 05/28/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 5/28/26 YOUR GRADING AND DRAINAGE PLAN DOES NOT SHOW A PAVER DRIVEWAY. YOU DO NOT HAVE A PAVER DRIVEWAY DETAIL SHEET UPLOADED. YOUR LEFT SIDE CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AND YOUR RIGHT SIDE CULVERT PIPE IS BACKPITCHED AT THE TIME OF THIS INSPECTION. PLEASE REVISE SITE PLA TO INCLUDE A PAVER DRIVEWAY AND UPLOAD A PAVER DRIVEWAY DETAIL SHEET WITH THE OPTION YOU ARE CHOOSING CIRCLED OR OTHERWISE INDICATED BEFORE RESUBMITTING FOR A PREPOUR INSPECTION. | |||
| GRAVITY SEWER TEST | 03/06/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/6/2026 10:38:26 AM *** | |||
| SEWER TIE IN | 03/06/2026 | APPROVED | PKNAPIK |
| Note: Via Virtual Inspection Inspector Notes from Inspection 2060 THIS WAS APPROVED 10/9/25 | |||
| LATH/BRICK/ WATER BARRIER | 12/26/2025 | APPROVED | CVANSTRAHLEN |
| Note: 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: 1). Right side: Holes in CMU wall at hose bibb and plumbing need wire lath over opening. 2). Left Side: Opening in CMU wall at blue corrugated raceway needs to be sealed. Inspector Notes from Inspection 2490 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2 | |||
| LATH/BRICK/ WATER BARRIER | 12/23/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/23/2025 1:46:37 PM *** 12/23/25: 1). Right side: Holes in CMU wall at hose bibb and plumbing need wire lath over opening. 2). Left Side: Opening in CMU wall at blue corrugated raceway needs to be sealed. Inspector Notes from Inspection 2490 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2 | |||
| WINDOW NAILING | 12/19/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: Front door approved Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2 | |||
| INSULATION | 12/19/2025 | APPROVED - AS NOTED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2 | |||
| ALL ROUGH | 12/10/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2 | |||
| WALL SHEATHING | 12/03/2025 | APPROVED | MCONTRYMAN |
| Note: 11/18/2025 - PREVIOUS INSPECTION NOTES 11/18/25: As noted on inspection 2460. *** A plan revision needs to be submitted to and approved by the City showing all details for the entire front entry area as plans do not include any detail. FBC [A]107.4 Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/02/2025 | APPROVED | MCONTRYMAN |
| Note: 11/24/2025 - PREVIOUS INSPECTION NOTES 11/24/25: Roof sheathing, down cell and truss engineering checked and approved. NOTE: Window sills have been corrected. 1). Revised plans are still missing tie down, beam,etc. details as the plans do not match the installed condition. 11/18/2025 - PREVIOUS INSPECTION NOTES 11/18/25: 1). additional anchor required in garage back load bearing wall where bottom plate is cut out for AC pipe raceway per plan. FBC [A]107.4 2). A plan revision needs to be submitted to and approved by the City showing all details for the entire front entry area as plans do not include any detail. FBC [A]107.4 3). Window sills noted on the previous inspection still need to be corrected. >>> 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| ROOF VALLEY & METAL | 12/01/2025 | APPROVED | MCONTRYMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/24/2025 | PARTIALLY APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/24/2025 11:08:34 AM *** 11/24/25: Roof sheathing, down cell and truss engineering checked and approved. NOTE: Window sills have been corrected. 1). Revised plans are still missing tie down, beam,etc. details as the plans do not match the installed condition. 11/18/2025 - PREVIOUS INSPECTION NOTES 11/18/25: 1). additional anchor required in garage back load bearing wall where bottom plate is cut out for AC pipe raceway per plan. FBC [A]107.4 2). A plan revision needs to be submitted to and approved by the City showing all details for the entire front entry area as plans do not include any detail. FBC [A]107.4 3). Window sills noted on the previous inspection still need to be corrected. >>> 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/18/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/18/2025 10:52:06 AM *** 11/18/25: 1). additional anchor required in garage back load bearing wall where bottom plate is cut out for AC pipe raceway per plan. FBC [A]107.4 2). A plan revision needs to be submitted to and approved by the City showing all details for the entire front entry area as plans do not include any detail. FBC [A]107.4 3). Window sills noted on the previous inspection still need to be corrected. >>> 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| WALL SHEATHING | 11/18/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/18/2025 10:53:47 AM *** 11/18/25: As noted on inspection 2460. *** A plan revision needs to be submitted to and approved by the City showing all details for the entire front entry area as plans do not include any detail. FBC [A]107.4 Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| ELECTRIC-TUG | 11/13/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/13/2025 12:10:50 PM *** 11/13/25: FPL emailed > Approved for TUG. 1). Silt fence needs to be repaired (prior to next inspection) and maintained throughout build. FBC 3307.1 | |||
| TIE BEAM / LINTEL | 11/05/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| ROW - DRAINAGE | 10/24/2025 | APPROVED | TPOLACEK |
| Note: 10-24-25 TPOLACEK*** ALL CONCRETE SLURRY HAS BEEN REMOVED FROM THE ROW. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/23/2025 - PREVIOUS INSPECTION NOTES 10-23-25 TPOLACEK*** THERE IS AN ILLICIT DISCHARGE OF CONCRETE SLURRY IN THE ROW THAT MUST BE REMOVED BY TOMORROW. | |||
| ROW - DRAINAGE | 10/23/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 10-23-25 TPOLACEK*** THERE IS AN ILLICIT DISCHARGE OF CONCRETE SLURRY IN THE ROW THAT MUST BE REMOVED BY TOMORROW. | |||
| MONOLITHIC SLAB | 10/17/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| ROW - DRAINAGE | 10/15/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE ITS THE RESPONISIBILTY OF THE CONTRACTOR TO KEEP UP SEDIMENT CONTROL DEVISES -------------------------------------------------------------- 10/14/2025 - PREVIOUS INSPECTION NOTES CALL FROM GOLDEN FOX WANT EXTRA TIME TO FIX CORRECTIONS WILL BE GIVING THEM TILL 10/15/2025 TO CORRECT ALL ISSUES IF ALL ISSUES ARE NOT FIXED BY THIS DATE A INSPECTION HOLD WILL BE PUT ON THIS PERMIT. -------------------------------------------------------------- 10/7/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM ROADSIDE SWALE AND REGRADE SWALE SO WATER CAN FLOW. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT AND LEAVE A CONSTRUCTION ENTERANCE. YOU WILL HAVE TILL 10/13/25 TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/14/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS APPROVED 10/9/25 | |||
| ROW - DRAINAGE | 10/13/2025 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CALL FROM GOLDEN FOX WANT EXTRA TIME TO FIX CORRECTIONS WILL BE GIVING THEM TILL 10/15/2025 TO CORRECT ALL ISSUES IF ALL ISSUES ARE NOT FIXED BY THIS DATE A INSPECTION HOLD WILL BE PUT ON THIS PERMIT. -------------------------------------------------------------- 10/7/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM ROADSIDE SWALE AND REGRADE SWALE SO WATER CAN FLOW. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT AND LEAVE A CONSTRUCTION ENTERANCE. YOU WILL HAVE TILL 10/13/25 TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 10/10/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 10/09/2025 | APPROVED | PKNAPIK |
| ROW - DRAINAGE | 10/07/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM ROADSIDE SWALE AND REGRADE SWALE SO WATER CAN FLOW. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT AND LEAVE A CONSTRUCTION ENTERANCE. YOU WILL HAVE TILL 10/13/25 TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD | |||
| WATER METER INSTALLATION REQUEST | 09/30/2025 | APPROVED | CBOWERMASTER |
| U-CROSS CONNECTION | |||
| BLD - BUILDING FINAL | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| Note: 6/10/2026 - PREVIOUS INSPECTION NOTES 6/10/26 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS PREPOUR INSPECTION. WITH RAIN IN THE FORECAST IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT ALL WATER IS OUT OF POUR AREA, IT IS PROPERLY COMPACTED AND THE PIPE ELEVATION HAS NOT CHANGED SINCE THIS INSPECTION. 6/10/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 5/28/2026 - PREVIOUS INSPECTION NOTES 5/28/26 YOUR GRADING AND DRAINAGE PLAN DOES NOT SHOW A PAVER DRIVEWAY. YOU DO NOT HAVE A PAVER DRIVEWAY DETAIL SHEET UPLOADED. YOUR LEFT SIDE CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AND YOUR RIGHT SIDE CULVERT PIPE IS BACKPITCHED AT THE TIME OF THIS INSPECTION. PLEASE REVISE SITE PLA TO INCLUDE A PAVER DRIVEWAY AND UPLOAD A PAVER DRIVEWAY DETAIL SHEET WITH THE OPTION YOU ARE CHOOSING CIRCLED OR OTHERWISE INDICATED BEFORE RESUBMITTING FOR A PREPOUR INSPECTION. | |||
| ELECTRIC - EARLY POWER | |||
| WINDOW NAILING | |||
| Note: 12/19/2025 - PREVIOUS INSPECTION NOTES Front door approved Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2 | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 06/04/2026 | 06/09/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/01/2026 | 06/01/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/29/2026 | 06/02/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/29/2026 | 06/04/2026 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM The newest grading plan in the permit is unreadable. Please provide a clearer grading plan. | |||
| ZON | HOLD | 05/29/2026 | 05/29/2026 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Bring in original paver agreement | |||
| MECH | COMPLETE | 12/08/2025 | 12/09/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/26/2025 | 12/01/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/21/2025 | 11/21/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/21/2025 | 11/21/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/03/2025 | 11/04/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/03/2025 | 11/03/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 10/31/2025 | 10/31/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RIGHT SIDE SETBACK MISSING ON FORMBOARD SURVEY | |||
| BLD | COMPLETE | 10/09/2025 | 10/09/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/09/2025 | 10/10/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/09/2025 | 10/09/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/08/2025 | 10/08/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Density report is not digitally verifiable. | |||
| SW1 | COMPLETE | 09/05/2025 | 09/05/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/04/2025 | 09/05/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL FINISH GRADE MUST BE 4" BELOW FFE FOR BLOCK AND 6" FOR WOOD FRAME | |||
| ELEC | COMPLETE | 09/04/2025 | 09/05/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/04/2025 | 09/05/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 08/28/2025 | 09/04/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Can not read the riser diagram. Submit it as a separate plan | |||
| SW1 | HOLD | 08/28/2025 | 08/28/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL FINISH ELEVATIONS AGAINST THE HOUSE MUST HAVE 4" BELOW FFE FOR BLOCK AND 6" BELOW FFE ON A WOOD STRUCTURE. | |||
| MECH | COMPLETE | 08/28/2025 | 09/02/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/22/2025 | 08/22/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/22/2025 | 08/27/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) YOU NEED TO HAVE PROPOSED ELEVATIONS ON THE OUTSIDE OF THE STRUCTURE. 2) NEED TO HAVE PROPOSED ELEVATIONS EVERY 20' ON THE RIGHT OF WAY LINE AND PROPERTY LINES. 3) NEED TO HAVE ON SITE BENCHMARK | |||
| MECH | COMPLETE | 08/22/2025 | 08/25/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 08/22/2025 | 08/25/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. The wire going from panel to transfer switch is wrong size. Need to match the service size. | |||
| BLD | COMPLETE | 08/22/2025 | 08/26/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 08/15/2025 | 08/20/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/15/2025 | 08/20/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/15/2025 | 08/19/2025 |
| Note: Released By: MICHELLE MCPARTLAND - - | |||
| ELEC | HOLD | 08/15/2025 | 08/18/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit manufacture specs of generator. 2. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. Must include generator NEC 2020 230.67, 230.85 3. Provide note on plans that generator exhaust must be minimum 10ft from any opening into the building per FBC Residential 2023 8Th edition M1905.2.5. If using the exception to 5ft, carbon monoxide detectors will be inspected on generator final. | |||
| ENGIN1 | COMPLETE | 08/15/2025 | 08/15/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 08/15/2025 | 08/18/2025 |
| LOCATE | COMPLETE | 08/15/2025 | 08/18/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/15/2025 | 08/18/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| SW1 | HOLD | 08/15/2025 | 08/15/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Please provide proposed grades on a 20' grid. - Please provide FFEs for the lanai amd entry. I've attach the Stormwater informational packet for your reference. Please feel free to call or email if there are any question or concerns. | |||
| ZON | HOLD | 08/15/2025 | 08/15/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Provide materials and width of the driveway and the walkway and circular. Provide the side setbacks on the site plan Provide the square footage of the lot on the site plan Demonstrate that the curb on the driveway will meet the 5' as shown does not meet shows in easement. Landscape plan: 8 Shrubs needed along the front facade of the home Floor plan: label the rooms accordingly on the floor plan. | |||
| SWALE | COMPLETE | 08/15/2025 | 10/06/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | 09/26/2025 |
| ADJUSTMENT 10% | (¤161.85) | 09/26/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/26/2025 |
| INSPECTION - RESIDENTIAL | ¤1,237.50 | 09/26/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤351.00 | 09/26/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 09/26/2025 |
| IMPACT FEE FIRE | ¤434.51 | 09/26/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/26/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/26/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 09/26/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/26/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 09/26/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 09/26/2025 |
| SURCHARGE FS 533.721 | ¤14.57 | 09/26/2025 |
| SURCHARGE - FS 468.631 | ¤21.85 | 09/26/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/26/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/26/2025 |
| SW ENG PRE APRON | ¤30.00 | 09/26/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/26/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/26/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 09/26/2025 |
| SEWER CREDIT | (¤1,342.00) | 09/26/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 09/26/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 09/26/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 09/26/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 09/26/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 09/26/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 09/26/2025 |
| SITE PLAN 30 | ¤30.00 | 09/26/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤237.50 | Total Paid: ¤24,722.28 |