I want to search for...

Permit #2025080612

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7024-00020-0280
CONDITIONED SPACE: 2108 sqft
GARAGE: 757 sqft
OPENED PORCH (WITH ROOF) : 342 sqft
OPENED PORCH (WITH ROOF) : 137 sqft
Total Square Footage: 3344 sqft
Block: 00020
Subdivision: -
Job Phone: 386-627-0430
Location Address: 7 PRINCESS ELLEN PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/26/2025
NOC: RECORDED
Applicant name: ANNA WIKTORIA LISOWSKI
Owner: PHILIP A ARMACIDA

Address

45 LARAMIE DR

PALM COAST, FL 32137

Lot: 0280
Contracted Stated Job Value: ¤450,000.00
Job Description: Single Family Residence
Type: CN

Contractor

GOLDEN FOX HOME REMODELING, INC
Status Location Address State License Number Phone
ACTIVE

72 HERNANDEZ AVE

PALM COAST, FL 32137

CBC1259266 (Exp: 08/31/2026) 386-627-0430

Sub Contractors

CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CRC1332537 (Exp: 08/31/2026) 386-445-7945
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762
SCOTT H STILLWELL
Status Location Address State License Number Phone
ACTIVE

4500 US 1 UNIT 206

BUNNELL, FL 32110

CAC1819433 (Exp: 08/31/2026) 386-864-4404

Inspection History

Type Request Date Result Inspector
ROW- PRE-APRON (PRE-POUR) 06/10/2026 PARTIALLY APPROVED FSLADISH
Note: 6/10/26 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS PREPOUR INSPECTION. WITH RAIN IN THE FORECAST IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT ALL WATER IS OUT OF POUR AREA, IT IS PROPERLY COMPACTED AND THE PIPE ELEVATION HAS NOT CHANGED SINCE THIS INSPECTION. 6/10/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 5/28/2026 - PREVIOUS INSPECTION NOTES 5/28/26 YOUR GRADING AND DRAINAGE PLAN DOES NOT SHOW A PAVER DRIVEWAY. YOU DO NOT HAVE A PAVER DRIVEWAY DETAIL SHEET UPLOADED. YOUR LEFT SIDE CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AND YOUR RIGHT SIDE CULVERT PIPE IS BACKPITCHED AT THE TIME OF THIS INSPECTION. PLEASE REVISE SITE PLA TO INCLUDE A PAVER DRIVEWAY AND UPLOAD A PAVER DRIVEWAY DETAIL SHEET WITH THE OPTION YOU ARE CHOOSING CIRCLED OR OTHERWISE INDICATED BEFORE RESUBMITTING FOR A PREPOUR INSPECTION.
ROW- PAVER RESTRAINTS 06/10/2026 APPROVED - AS NOTED FSLADISH
Note: AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR DRIVEWAY PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 05/28/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 5/28/26 YOUR GRADING AND DRAINAGE PLAN DOES NOT SHOW A PAVER DRIVEWAY. YOU DO NOT HAVE A PAVER DRIVEWAY DETAIL SHEET UPLOADED. YOUR LEFT SIDE CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AND YOUR RIGHT SIDE CULVERT PIPE IS BACKPITCHED AT THE TIME OF THIS INSPECTION. PLEASE REVISE SITE PLA TO INCLUDE A PAVER DRIVEWAY AND UPLOAD A PAVER DRIVEWAY DETAIL SHEET WITH THE OPTION YOU ARE CHOOSING CIRCLED OR OTHERWISE INDICATED BEFORE RESUBMITTING FOR A PREPOUR INSPECTION.
GRAVITY SEWER TEST 03/06/2026 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/6/2026 10:38:26 AM ***
SEWER TIE IN 03/06/2026 APPROVED PKNAPIK
Note: Via Virtual Inspection Inspector Notes from Inspection 2060 THIS WAS APPROVED 10/9/25
LATH/BRICK/ WATER BARRIER 12/26/2025 APPROVED CVANSTRAHLEN
Note: 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: 1). Right side: Holes in CMU wall at hose bibb and plumbing need wire lath over opening. 2). Left Side: Opening in CMU wall at blue corrugated raceway needs to be sealed. Inspector Notes from Inspection 2490 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2
LATH/BRICK/ WATER BARRIER 12/23/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 12/23/2025 1:46:37 PM *** 12/23/25: 1). Right side: Holes in CMU wall at hose bibb and plumbing need wire lath over opening. 2). Left Side: Opening in CMU wall at blue corrugated raceway needs to be sealed. Inspector Notes from Inspection 2490 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2
WINDOW NAILING 12/19/2025 PARTIALLY APPROVED KSANDOE
Note: Front door approved Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2
INSULATION 12/19/2025 APPROVED - AS NOTED KSANDOE
Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2
ALL ROUGH 12/10/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2
WALL SHEATHING 12/03/2025 APPROVED MCONTRYMAN
Note: 11/18/2025 - PREVIOUS INSPECTION NOTES 11/18/25: As noted on inspection 2460. *** A plan revision needs to be submitted to and approved by the City showing all details for the entire front entry area as plans do not include any detail. FBC [A]107.4 Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/02/2025 APPROVED MCONTRYMAN
Note: 11/24/2025 - PREVIOUS INSPECTION NOTES 11/24/25: Roof sheathing, down cell and truss engineering checked and approved. NOTE: Window sills have been corrected. 1). Revised plans are still missing tie down, beam,etc. details as the plans do not match the installed condition. 11/18/2025 - PREVIOUS INSPECTION NOTES 11/18/25: 1). additional anchor required in garage back load bearing wall where bottom plate is cut out for AC pipe raceway per plan. FBC [A]107.4 2). A plan revision needs to be submitted to and approved by the City showing all details for the entire front entry area as plans do not include any detail. FBC [A]107.4 3). Window sills noted on the previous inspection still need to be corrected. >>> 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same.
ROOF VALLEY & METAL 12/01/2025 APPROVED MCONTRYMAN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/24/2025 PARTIALLY APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/24/2025 11:08:34 AM *** 11/24/25: Roof sheathing, down cell and truss engineering checked and approved. NOTE: Window sills have been corrected. 1). Revised plans are still missing tie down, beam,etc. details as the plans do not match the installed condition. 11/18/2025 - PREVIOUS INSPECTION NOTES 11/18/25: 1). additional anchor required in garage back load bearing wall where bottom plate is cut out for AC pipe raceway per plan. FBC [A]107.4 2). A plan revision needs to be submitted to and approved by the City showing all details for the entire front entry area as plans do not include any detail. FBC [A]107.4 3). Window sills noted on the previous inspection still need to be corrected. >>> 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/18/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/18/2025 10:52:06 AM *** 11/18/25: 1). additional anchor required in garage back load bearing wall where bottom plate is cut out for AC pipe raceway per plan. FBC [A]107.4 2). A plan revision needs to be submitted to and approved by the City showing all details for the entire front entry area as plans do not include any detail. FBC [A]107.4 3). Window sills noted on the previous inspection still need to be corrected. >>> 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same.
WALL SHEATHING 11/18/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 11/18/2025 10:53:47 AM *** 11/18/25: As noted on inspection 2460. *** A plan revision needs to be submitted to and approved by the City showing all details for the entire front entry area as plans do not include any detail. FBC [A]107.4 Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same.
ELECTRIC-TUG 11/13/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/13/2025 12:10:50 PM *** 11/13/25: FPL emailed > Approved for TUG. 1). Silt fence needs to be repaired (prior to next inspection) and maintained throughout build. FBC 3307.1
TIE BEAM / LINTEL 11/05/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/5/2025 9:21:44 AM *** 11/5/25: Approved as noted. Must be resolved prior to next inspection. 1). (3) - Window Sill mortar beds and/or CMU joints exceed the maximum thickness. >>> [sills - 1/2" / CMU joints - 3/8" (FBC-R606.3.1)] Highlighted in yellow. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same.
ROW - DRAINAGE 10/24/2025 APPROVED TPOLACEK
Note: 10-24-25 TPOLACEK*** ALL CONCRETE SLURRY HAS BEEN REMOVED FROM THE ROW. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/23/2025 - PREVIOUS INSPECTION NOTES 10-23-25 TPOLACEK*** THERE IS AN ILLICIT DISCHARGE OF CONCRETE SLURRY IN THE ROW THAT MUST BE REMOVED BY TOMORROW.
ROW - DRAINAGE 10/23/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 10-23-25 TPOLACEK*** THERE IS AN ILLICIT DISCHARGE OF CONCRETE SLURRY IN THE ROW THAT MUST BE REMOVED BY TOMORROW.
MONOLITHIC SLAB 10/17/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/17/2025 1:22:39 PM *** 10/17/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same.
ROW - DRAINAGE 10/15/2025 APPROVED PFLANAGAN
Note: CORRECTIONS MADE ITS THE RESPONISIBILTY OF THE CONTRACTOR TO KEEP UP SEDIMENT CONTROL DEVISES -------------------------------------------------------------- 10/14/2025 - PREVIOUS INSPECTION NOTES CALL FROM GOLDEN FOX WANT EXTRA TIME TO FIX CORRECTIONS WILL BE GIVING THEM TILL 10/15/2025 TO CORRECT ALL ISSUES IF ALL ISSUES ARE NOT FIXED BY THIS DATE A INSPECTION HOLD WILL BE PUT ON THIS PERMIT. -------------------------------------------------------------- 10/7/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM ROADSIDE SWALE AND REGRADE SWALE SO WATER CAN FLOW. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT AND LEAVE A CONSTRUCTION ENTERANCE. YOU WILL HAVE TILL 10/13/25 TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD
PLUMBING 1ST ROUGH UNDERGROUND 10/14/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS APPROVED 10/9/25
ROW - DRAINAGE 10/13/2025 CANCELLED BY APPLICANT PFLANAGAN
Note: CALL FROM GOLDEN FOX WANT EXTRA TIME TO FIX CORRECTIONS WILL BE GIVING THEM TILL 10/15/2025 TO CORRECT ALL ISSUES IF ALL ISSUES ARE NOT FIXED BY THIS DATE A INSPECTION HOLD WILL BE PUT ON THIS PERMIT. -------------------------------------------------------------- 10/7/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM ROADSIDE SWALE AND REGRADE SWALE SO WATER CAN FLOW. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT AND LEAVE A CONSTRUCTION ENTERANCE. YOU WILL HAVE TILL 10/13/25 TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD
FORMBOARD SURVEY (OFFICE USE ONLY) 10/10/2025 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 10/09/2025 APPROVED PKNAPIK
ROW - DRAINAGE 10/07/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM ROADSIDE SWALE AND REGRADE SWALE SO WATER CAN FLOW. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT AND LEAVE A CONSTRUCTION ENTERANCE. YOU WILL HAVE TILL 10/13/25 TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD
WATER METER INSTALLATION REQUEST 09/30/2025 APPROVED CBOWERMASTER
U-CROSS CONNECTION
BLD - BUILDING FINAL
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW- PRE-APRON (PRE-POUR)
Note: 6/10/2026 - PREVIOUS INSPECTION NOTES 6/10/26 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS PREPOUR INSPECTION. WITH RAIN IN THE FORECAST IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT ALL WATER IS OUT OF POUR AREA, IT IS PROPERLY COMPACTED AND THE PIPE ELEVATION HAS NOT CHANGED SINCE THIS INSPECTION. 6/10/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 5/28/2026 - PREVIOUS INSPECTION NOTES 5/28/26 YOUR GRADING AND DRAINAGE PLAN DOES NOT SHOW A PAVER DRIVEWAY. YOU DO NOT HAVE A PAVER DRIVEWAY DETAIL SHEET UPLOADED. YOUR LEFT SIDE CULVERT PIPE IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM AND YOUR RIGHT SIDE CULVERT PIPE IS BACKPITCHED AT THE TIME OF THIS INSPECTION. PLEASE REVISE SITE PLA TO INCLUDE A PAVER DRIVEWAY AND UPLOAD A PAVER DRIVEWAY DETAIL SHEET WITH THE OPTION YOU ARE CHOOSING CIRCLED OR OTHERWISE INDICATED BEFORE RESUBMITTING FOR A PREPOUR INSPECTION.
ELECTRIC - EARLY POWER
WINDOW NAILING
Note: 12/19/2025 - PREVIOUS INSPECTION NOTES Front door approved Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 12/10/2025 11:39:18 AM *** 12/10/25: Adding a window nailing inspection for the front entry door that is not installed yet along with master bedroom window that has a damaged lower sash which prevented testing of window operation. Inspection needs to be complete prior to insulation inspection. Check remaining items at insulation inspection. 1). Missing fireblocking above both Main breaker panel along with Generator panel. All wires need to be re-installed through holes in a 2" x 4" minimum (cross brace) installed at the lower ceiling area so that the holes can be firefoamed as required by FBC-R302.11. (please call inspector with any questions). 2). Exhaust fans require 2 points of connection > 1 seal and 1 mechanical. fan exhaust ducts are missing mechanical plastic strap or hose clamp at fan to duct connection as required. FBC-M1502.4.2
ROW - STORMWATER FINAL
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
SW1 COMPLETE 06/04/2026 06/09/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 06/01/2026 06/01/2026
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/29/2026 06/02/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 05/29/2026 06/04/2026
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM The newest grading plan in the permit is unreadable. Please provide a clearer grading plan.
ZON HOLD 05/29/2026 05/29/2026
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Bring in original paver agreement
MECH COMPLETE 12/08/2025 12/09/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 11/26/2025 12/01/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON COMPLETE 11/21/2025 11/21/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 11/21/2025 11/21/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 11/03/2025 11/04/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 11/03/2025 11/03/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 10/31/2025 10/31/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RIGHT SIDE SETBACK MISSING ON FORMBOARD SURVEY
BLD COMPLETE 10/09/2025 10/09/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 10/09/2025 10/10/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 10/09/2025 10/09/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 10/08/2025 10/08/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Density report is not digitally verifiable.
SW1 COMPLETE 09/05/2025 09/05/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
SW1 HOLD 09/04/2025 09/05/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL FINISH GRADE MUST BE 4" BELOW FFE FOR BLOCK AND 6" FOR WOOD FRAME
ELEC COMPLETE 09/04/2025 09/05/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/04/2025 09/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ELEC HOLD 08/28/2025 09/04/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Can not read the riser diagram. Submit it as a separate plan
SW1 HOLD 08/28/2025 08/28/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL FINISH ELEVATIONS AGAINST THE HOUSE MUST HAVE 4" BELOW FFE FOR BLOCK AND 6" BELOW FFE ON A WOOD STRUCTURE.
MECH COMPLETE 08/28/2025 09/02/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 08/22/2025 08/22/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 08/22/2025 08/27/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) YOU NEED TO HAVE PROPOSED ELEVATIONS ON THE OUTSIDE OF THE STRUCTURE. 2) NEED TO HAVE PROPOSED ELEVATIONS EVERY 20' ON THE RIGHT OF WAY LINE AND PROPERTY LINES. 3) NEED TO HAVE ON SITE BENCHMARK
MECH COMPLETE 08/22/2025 08/25/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC HOLD 08/22/2025 08/25/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. The wire going from panel to transfer switch is wrong size. Need to match the service size.
BLD COMPLETE 08/22/2025 08/26/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN COMPLETE 08/15/2025 08/20/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 08/15/2025 08/20/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 08/15/2025 08/19/2025
Note: Released By: MICHELLE MCPARTLAND - -
ELEC HOLD 08/15/2025 08/18/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit manufacture specs of generator. 2. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. Must include generator NEC 2020 230.67, 230.85 3. Provide note on plans that generator exhaust must be minimum 10ft from any opening into the building per FBC Residential 2023 8Th edition M1905.2.5. If using the exception to 5ft, carbon monoxide detectors will be inspected on generator final.
ENGIN1 COMPLETE 08/15/2025 08/15/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 08/15/2025 08/18/2025
LOCATE COMPLETE 08/15/2025 08/18/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 08/15/2025 08/18/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition
SW1 HOLD 08/15/2025 08/15/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Please provide proposed grades on a 20' grid. - Please provide FFEs for the lanai amd entry. I've attach the Stormwater informational packet for your reference. Please feel free to call or email if there are any question or concerns.
ZON HOLD 08/15/2025 08/15/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Provide materials and width of the driveway and the walkway and circular. Provide the side setbacks on the site plan Provide the square footage of the lot on the site plan Demonstrate that the curb on the driveway will meet the 5' as shown does not meet shows in easement. Landscape plan: 8 Shrubs needed along the front facade of the home Floor plan: label the rooms accordingly on the floor plan.
SWALE COMPLETE 08/15/2025 10/06/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤50.00 09/26/2025
ADJUSTMENT 10% (¤161.85) 09/26/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/26/2025
INSPECTION - RESIDENTIAL ¤1,237.50 09/26/2025
PLAN REVIEW - RESIDENTIAL ¤351.00 09/26/2025
FC IMPACT FEE EMS ¤62.00 09/26/2025
IMPACT FEE FIRE ¤434.51 09/26/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/26/2025
FC IMPACT FEE LIBRARY ¤268.00 09/26/2025
IMPACT FEE PARKS ¤1,828.01 09/26/2025
IMPACT FEE SCHOOL ¤5,450.00 09/26/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 09/26/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 09/26/2025
SURCHARGE FS 533.721 ¤14.57 09/26/2025
SURCHARGE - FS 468.631 ¤21.85 09/26/2025
SW ENG - FOUNDATION SURVEY ¤20.00 09/26/2025
SW ENG INSPECTION 80 ¤80.00 09/26/2025
SW ENG PRE APRON ¤30.00 09/26/2025
SW ENG - REVIEW 20 ¤20.00 09/26/2025
SW ENG RES REVIEW 200 ¤200.00 09/26/2025
WATER METER W/ TAP ¤2,326.93 09/26/2025
SEWER CREDIT (¤1,342.00) 09/26/2025
WASTEWATER PERM INSPECTION ¤80.00 09/26/2025
WASTEWATER PERM REVIEW ¤25.00 09/26/2025
SEWER CAPITAL FACILITY ¤4,415.00 09/26/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 09/26/2025
WATER PERMIT REVIEW ¤25.00 09/26/2025
WATER MAIN EXTENSION IMPACT ¤917.27 09/26/2025
SITE PLAN 30 ¤30.00 09/26/2025
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
RSI REINSPECTION 1 ¤35.00
RSI REINSPECTION 1 ¤35.00
RSI REINSPECTION 1 ¤35.00
RECORDING FEE REIMBURSE DOC ¤52.50
REINSPECTION RESIDENTIAL ¤40.00
Fees Total Due: ¤237.50 Total Paid: ¤24,722.28