I want to search for...

Permit #2025080832

Permit Details

Status: COED

Parcel Id: 03-12-31-1126-00000-2540
CONDITIONED SPACE: 2715 sqft
GARAGE: 614 sqft
OPENED PORCH (WITH ROOF) : 76 sqft
OPENED PORCH (WITH ROOF) : 208 sqft
Total Square Footage: 3613 sqft
Subdivision: 2344 - COLBERT LANDINGS PH 2
Job Phone: 813-917-1689
Location Address: 112 ARMOYAN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/06/2025
NOC: RECORDED
Applicant name: SCOTT EVAN KEUNING
Owner: TAYLOR MORRISON OF FLORIDA INC

Address

1275 W GRANADA BLVD

ORMOND BEACH, FL 32174

Address

SUITE 3B

ORMOND BEACH, FL 32174

Lot: 254
Contracted Stated Job Value: ¤208,548.00
Job Description: Single Family Residence
Type: CN

Contractor

TAYLOR MORRISON OF FLORIDA INC
Status Location Address State License Number Phone
ACTIVE

7785 BAY MEADOWS WAY, SUITE 105

JACKSONVILLE, FL 32256

CBC1265083 (Exp: 08/31/2026) 813-917-1689

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426
CHASE RANDOLPH MASSEY
Status Location Address State License Number Phone
ACTIVE

10048 103RD ST

JACKSONVILLE, FL 32210

CCC1332486 (Exp: 08/31/2026) 904-248-1133

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 03/17/2026 APPROVED BWRIGHT
U -UTILITY RESIDENTIAL FINAL 03/17/2026 FINAL APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 03/16/2026 APPROVED FSLADISH
Note: 3/16/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/16/2026 APPROVED FSLADISH
Note: 3/16/26 LDAGC CORRECTION COMPLETED AT THE TIME OF THIS INSPECTION. 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26 YOU HAVE NOT CHECKED YES OR NO ON BOX #10 OF THE LDAGC. PLEASE MAKE CORRECTION BEFORE RESUBMITTING LDAGC. THANK YOU.
ROW FIELD SURVEY /GRADING CERTIFICATION 03/16/2026 APPROVED FSLADISH
Note: 3/16/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 03/16/2026 APPROVED FSLADISH
Note: 3/16/26 THERE IS A SMALL AREA IN THE REAR ON THE RIGHT SIDE IN THE COMMON AREA WHERE THE SOD HAS BEEN DISTURBED. AS IT IS A MINOR CORRECTION, I AM GOING TO APPROVE THIS FINAL AS A COURTESY AND THAT YOU WILL BE REQUIRED TO REPAIR IT IN A TIMELY MANNER.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/12/2026 Disapproved - NO FEE FSLADISH
Note: 3/12/26 YOU HAVE NOT CHECKED YES OR NO ON BOX #10 OF THE LDAGC. PLEASE MAKE CORRECTION BEFORE RESUBMITTING LDAGC. THANK YOU.
BLD - BUILDING FINAL 03/04/2026 APPROVED CVANSTRAHLEN
Note: 2/25/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-Exhausted for range hood need to be install and connected #2-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( low voltage wire AHU Plenum conduit ) #3- Seal AH Unit closet penetrations , walls and ceiling .FBC-R302.6 #4-Share bathroom sink water stopper , not working per mnufacture expec #5-please removed porta potty and dumpter #6-FBCR M1303.1-HEAT STRIPS NOT MARKED #7-Plans missing garage framing jam details #8-FPC-708.1.10 clean out cap / plug
BLD - BUILDING FINAL 02/25/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection #1-Exhausted for range hood need to be install and connected #2-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( low voltage wire AHU Plenum conduit ) #3- Seal AH Unit closet penetrations , walls and ceiling .FBC-R302.6 #4-Share bathroom sink water stopper , not working per mnufacture expec #5-please removed porta potty and dumpter #6-FBCR M1303.1-HEAT STRIPS NOT MARKED #7-Plans missing garage framing jam details #8-FPC-708.1.10 clean out cap / plug
ELECTRIC - EARLY POWER 01/30/2026 APPROVED - AS NOTED BTAYLOR
Note: 1-30-26 1. Emailed FPL at 11:11. Inspector Notes from Inspection 2200 12-4-25 1.Emailed FPL at 9:29.
ROW- PRE-APRON (PRE-POUR) 01/16/2026 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, IN THE UPCOMING MONTHS THE DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS WILL BE REQUIRED TO BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. YOU WILL RECEIVE A NEWS BLAST WHEN THIS BECOMES NECESSARY. 1/15/2026 - PREVIOUS INSPECTION NOTES 01-15-26 TPOLACEK*** POUR AREA DOES NOT HAVE 6" THROUGHOUT THE ENTIRE ROW POUR AREA. ROW IN SUBDIVISIONS IS 10' FROM CURB EDGE.
ROW- PRE-APRON (PRE-POUR) 01/15/2026 Disapproved -FEE REQUIRED TPOLACEK
Note: 01-15-26 TPOLACEK*** POUR AREA DOES NOT HAVE 6" THROUGHOUT THE ENTIRE ROW POUR AREA. ROW IN SUBDIVISIONS IS 10' FROM CURB EDGE.
GRAVITY SEWER TEST 01/08/2026 APPROVED BTAYLOR
SEWER TIE IN 01/08/2026 APPROVED BTAYLOR
INSULATION 12/23/2025 APPROVED BTAYLOR
ALL ROUGH 12/15/2025 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 12/09/2025 APPROVED BTAYLOR
ROOF VALLEY & METAL 12/09/2025 APPROVED BTAYLOR
ELECTRIC-TUG 12/04/2025 APPROVED - AS NOTED BTAYLOR
Note: 12-4-25 1.Emailed FPL at 9:29.
WALL SHEATHING 12/02/2025 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/02/2025 APPROVED BTAYLOR
MONOLITHIC SLAB 11/17/2025 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 11/13/2025 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 11/13/2025 APPROVED CBOWERMASTER
FORMBOARD SURVEY (OFFICE USE ONLY) 11/12/2025 APPROVED RRICKS

Review History

Department Status Date In Date Out
BADMIN INFORMATION 03/12/2026 03/12/2026
Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM The As-Built Final Lot Grading & Drainage Plan must be accompanied by the Final Lot Grading & Drainage Certification. It must be part of one file and not uploaded as a separate document.
BLD COMPLETE 01/09/2026 01/12/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 11/12/2025 11/12/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 11/12/2025 11/12/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 10/29/2025 10/29/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved contingent on final survey.
SW1 COMPLETE 10/29/2025 10/29/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
SW1 HOLD 10/06/2025 10/06/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please disregard latest comments from 10/6. New comments: - The shall be existing elevations on a 20' grid with 10' shots beyond the property line. Please review the SW informational packet and the example grading plan to prevent any further holds. Please feel free to call or email if there are any questions or concerns.
ZON COMPLETE 10/03/2025 10/03/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 10/03/2025 10/06/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Comments: - Based on the proposed elevations in the back of this lot. This lot is draining as a "B-type" instead of an A-Type. Please provide more proposed elevations in the back of this clearly depicting a rear yard drainage swale. Water shall move from the back from the back of the home. - The shall be existing elevations on a 20' grid with 10' shots beyond the property line. Please review the SW informational packet and the example grading plan to prevent any further holds. Please feel free to call or email if there are any questions or concerns.
ENGIN1 COMPLETE 10/03/2025 10/03/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
RSI CANCEL 10/03/2025 10/03/2025
BADMIN INFORMATION 10/03/2025 10/07/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM For future submittals, please follow the document submittal requirements instructions for file naming and document type requirements. example - grading and drainage plan should be uploaded under that document type (not site plan) response letters should be uploaded under supporting documents - not site plan. etc.
ZON HOLD 09/22/2025 09/22/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan shows that this is in AE zone but the flood info we have is that this is X zone. Please correct site plan
SW1 HOLD 09/22/2025 09/25/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Previous comments not addressed.
ENGIN1 COMPLETE 09/09/2025 09/11/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 09/09/2025 09/09/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Flood information missing on site plan - map panel number and flood zone
SW1 HOLD 09/09/2025 09/11/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading comments: - There shall be existing elevation shots at all locations of proposed elevations and 10' beyond property line to depict what the water is doing. - Please depict the proposed FFE for the lanai, front porch and sidewalk. These shall be no less the 0.33'(4") of home's FFE and shall have a minimum slope of 2% away from structure. I've attached some example grading plans. Please feel free to call or email if there are any questions or concerns.
BADMIN COMPLETE 08/20/2025 08/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 08/20/2025 08/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 08/20/2025 08/28/2025
Note: Released By: MICHELLE MCPARTLAND - -
ELEC COMPLETE 08/20/2025 08/25/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 08/20/2025 08/21/2025
Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM Need to include an onsight benchmark on the grading/drainage plan.
GAS CANCEL 08/20/2025 08/20/2025
LOCATE COMPLETE 08/20/2025 08/26/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 08/20/2025 08/21/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 08/20/2025 08/27/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading comments: - Please provide an on-site benchmark. - Please provide the proposed FFE for the covered lanai, covered porch, and sidewalk. - Proposed elevations along the side and front property lines shall be on a 20' grid with existing eleavtions along with the proposed elevations. - There is no proposed FFE for the foundation. Please feel to call or email if there are any questions.
ZON HOLD 08/20/2025 08/21/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: front setback from right side garage is the closest point provide the setback. Provide walkwalkway width, map panel number missing , and flood zone missing Site plan need to show the 10' easement on the left side of the property Landscape Symbols on the legend are all missing

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 03/16/2026
RSI REINSPECTION 1 ¤35.00 03/16/2026
SURCHARGE FS 533.721 ¤16.57 11/06/2025
SURCHARGE - FS 468.631 ¤24.85 11/06/2025
SW ENG - FOUNDATION SURVEY ¤20.00 11/06/2025
SW ENG INSPECTION 80 ¤80.00 11/06/2025
SW ENG PRE APRON ¤30.00 11/06/2025
SW ENG - REVIEW 20 ¤20.00 11/06/2025
WASTEWATER PERM INSPECTION ¤80.00 11/06/2025
WASTEWATER PERM REVIEW ¤25.00 11/06/2025
SEWER CAPITAL FACILITY ¤3,613.92 11/06/2025
WATER CAPITAL FACILITY FEE ¤3,039.48 11/06/2025
WATER PERMIT INSPECTION ¤40.00 11/06/2025
WATER PERMIT REVIEW ¤25.00 11/06/2025
SITE PLAN 30 ¤30.00 11/06/2025
FC IMPACT FEE EMS ¤62.00 11/06/2025
IMPACT FEE FIRE ¤434.51 11/06/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 11/06/2025
FC IMPACT FEE LIBRARY ¤268.00 11/06/2025
IMPACT FEE PARKS ¤1,828.01 11/06/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 11/06/2025
WATER METER W/OUT TAP ¤965.03 11/06/2025
WATER-METER ¤965.03 11/06/2025
WATER- TURN ON ¤50.00 11/06/2025
WATER- TURN ON ¤50.00 11/06/2025
ADJUSTMENT 10% (¤184.09) 11/06/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/06/2025
INSPECTION - RESIDENTIAL ¤1,410.75 11/06/2025
PLAN REVIEW - RESIDENTIAL ¤400.14 11/06/2025
Fees Total Due: ¤0.00 Total Paid: ¤17,119.20