Permit #2025090288

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7010-00070-1060
CONDITIONED SPACE: 2430 sqft
GARAGE: 699 sqft
SCREEN PORCH (SOLID ROOF) : 504 sqft
ENCLOSE EXISTING PORCH TO LIVING : 96 sqft
Total Square Footage: 3729 sqft
Block: 00070
Subdivision: -
Job Phone: 386-627-0430
Location Address: 31 FLEMINGTON LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/25/2025
NOC: RECORDED
Applicant name: ANNA WIKTORIA LISOWSKI
Owner: SOARES CARLOS M & MARIA A TRUSTEES

Address

3 ABBOTT RUN VALLEY RD

CUMBERLAND, RI 02864

Lot: 1060
Contracted Stated Job Value: ¤350,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLDEN FOX HOME REMODELING, INC
Status Location Address State License Number Phone
INACTIVE

72 HERNANDEZ AVE

PALM COAST, FL 32137

CBC1259266 (Exp: 08/31/2026) 386-627-0430

Sub Contractors

CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CRC1332537 (Exp: 08/31/2026) 386-445-7945
WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762
SCOTT H STILLWELL
Status Location Address State License Number Phone
ACTIVE

4500 US 1 UNIT 206

BUNNELL, FL 32110

CAC1819433 (Exp: 08/31/2026) 386-864-4404
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)

Inspection History

Type Request Date Result Inspector
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/12/2026
Note: 6/11/2026 - PREVIOUS INSPECTION NOTES 06-11-26 TPOLACEK** AS STATED IN THE LGDC ANY BOXES CHECKED "NO" MUST HAVE AN EXPLANATION STATING "For each statement initialed with a “No”. attach an explanation detailing the discrepancy, change or deviation that occurred and its effect" PLEASE EXPLAIN THE BOXES CHECKED NO AND FOR #11 FINAL SURVEY MUST INDICATE TYPE OF CONSTRUCTION TO DETERMINE THE PROPER FALL.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/11/2026 Disapproved - NO FEE TPOLACEK
Note: 06-11-26 TPOLACEK** AS STATED IN THE LGDC ANY BOXES CHECKED "NO" MUST HAVE AN EXPLANATION STATING "For each statement initialed with a “No”. attach an explanation detailing the discrepancy, change or deviation that occurred and its effect" PLEASE EXPLAIN THE BOXES CHECKED NO AND FOR #11 FINAL SURVEY MUST INDICATE TYPE OF CONSTRUCTION TO DETERMINE THE PROPER FALL.
ROW- PRE-APRON (PRE-POUR) 04/24/2026 APPROVED - AS NOTED EMADISON
Note: ** 04/24/26 READY TO SET PAVERS ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ____________________________________________________________________________________________________________________________ 4/16/2026 - PREVIOUS INSPECTION NOTES ** 04/16/26 READY TO POUR APRON AND PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _________________________________________________________________________________________________________________________ 4/15/2026 - PREVIOUS INSPECTION NOTES 04-15-26 TPOLACEK*** CULVERT ON THE RIGHT IS PITCHED AGAINST THE FLOW, CULVERT ON THE LEFT IS OUT OF TOLERENCE BY OVER THE .10 ALLOWED. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Inspector Notes from Inspection 9470 ** 10/27/25 ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________ 10/21/2025 - PREVIOUS INSPECTION NOTES ** 10/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AT CONSTRUCTION ENTRANCE INSTALL A TEMPORARY CULVERT PIPE A MINIMUM OF 12 INCHES IN DIAMETER AS YOU HAVE THE SWALE COMPLETELY ' BLOCKED ** REMOVE THE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ONTO YOUR SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/27/25
ROW- PAVER RESTRAINTS 04/16/2026 APPROVED EMADISON
Note: ** 04/16/26 READY TO POUR APRON AND PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE
ROW- PRE-APRON (PRE-POUR) 04/16/2026 PARTIALLY APPROVED EMADISON
Note: ** 04/16/26 READY TO POUR APRON AND PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _________________________________________________________________________________________________________________________ 4/15/2026 - PREVIOUS INSPECTION NOTES 04-15-26 TPOLACEK*** CULVERT ON THE RIGHT IS PITCHED AGAINST THE FLOW, CULVERT ON THE LEFT IS OUT OF TOLERENCE BY OVER THE .10 ALLOWED. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Inspector Notes from Inspection 9470 ** 10/27/25 ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________ 10/21/2025 - PREVIOUS INSPECTION NOTES ** 10/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AT CONSTRUCTION ENTRANCE INSTALL A TEMPORARY CULVERT PIPE A MINIMUM OF 12 INCHES IN DIAMETER AS YOU HAVE THE SWALE COMPLETELY ' BLOCKED ** REMOVE THE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ONTO YOUR SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/27/25
ROW- PRE-APRON (PRE-POUR) 04/15/2026 Disapproved -FEE REQUIRED TPOLACEK
Note: 04-15-26 TPOLACEK*** CULVERT ON THE RIGHT IS PITCHED AGAINST THE FLOW, CULVERT ON THE LEFT IS OUT OF TOLERENCE BY OVER THE .10 ALLOWED. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Inspector Notes from Inspection 9470 ** 10/27/25 ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________ 10/21/2025 - PREVIOUS INSPECTION NOTES ** 10/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AT CONSTRUCTION ENTRANCE INSTALL A TEMPORARY CULVERT PIPE A MINIMUM OF 12 INCHES IN DIAMETER AS YOU HAVE THE SWALE COMPLETELY ' BLOCKED ** REMOVE THE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ONTO YOUR SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/27/25
ELECTRIC - EARLY POWER 03/13/2026 Disapproved - NO FEE MCONTRYMAN
Note: 3/12/26 1. Alot of gang boxes are missing covers NEC 440.14 2. Some electrical wires are not properly safed off. Must be capped and in a gang box with cover NEC 440.14 3. Cover is off of garage electrical panel NEC 440.14
ELECTRIC - EARLY POWER 03/13/2026 APPROVED MCONTRYMAN
Note: 3/12/2026 - PREVIOUS INSPECTION NOTES 3/12/26 1. Alot of gang boxes are missing covers NEC 440.14 2. Some electrical wires are not properly safed off. Must be capped and in a gang box with cover NEC 440.14 3. Cover is off of garage electrical panel NEC 440.14
GRAVITY SEWER TEST 03/06/2026 APPROVED MCONTRYMAN
SEWER TIE IN 03/05/2026 APPROVED PKNAPIK
Note: Via virtual inspection
LATH/BRICK/ WATER BARRIER 01/15/2026 APPROVED - AS NOTED JSTEWART
Note: Installer is onsite and installing raised bands at back doors and side windows. water barrier (flashing) is inplace and mesh is installed.
INSULATION 01/12/2026 APPROVED MCONTRYMAN
Note: Inspector Notes from Inspection 2420 1/7/26 1. Duct layout does not match what is installed. Please revise and have approved FBC(A) 107.4
ALL ROUGH 01/07/2026 APPROVED - AS NOTED MCONTRYMAN
Note: 1/7/26 1. Duct layout does not match what is installed. Please revise and have approved FBC(A) 107.4
ROOF VALLEY & METAL 12/18/2025 APPROVED HCAMACHO
WALL SHEATHING 12/17/2025 APPROVED HCAMACHO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/17/2025 APPROVED HCAMACHO
ELECTRIC-TUG 12/05/2025 APPROVED HCAMACHO
TIE BEAM / LINTEL 12/03/2025 APPROVED HCAMACHO
MONOLITHIC SLAB 11/12/2025 APPROVED HCAMACHO
PLUMBING 1ST ROUGH UNDERGROUND 11/10/2025 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 11/07/2025 APPROVED PKNAPIK
FORMBOARD SURVEY (OFFICE USE ONLY) 11/04/2025 APPROVED RRICKS
ROW - DRAINAGE 10/27/2025 APPROVED - AS NOTED EMADISON
Note: ** 10/27/25 ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________ 10/21/2025 - PREVIOUS INSPECTION NOTES ** 10/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AT CONSTRUCTION ENTRANCE INSTALL A TEMPORARY CULVERT PIPE A MINIMUM OF 12 INCHES IN DIAMETER AS YOU HAVE THE SWALE COMPLETELY ' BLOCKED ** REMOVE THE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ONTO YOUR SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/27/25
ROW - DRAINAGE 10/21/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/21/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE AT CONSTRUCTION ENTRANCE INSTALL A TEMPORARY CULVERT PIPE A MINIMUM OF 12 INCHES IN DIAMETER AS YOU HAVE THE SWALE COMPLETELY ' BLOCKED ** REMOVE THE PORT-A-JOHN FROM THE ROADSIDE SWALE AND PUT ONTO YOUR SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/27/25
WATER METER INSTALLATION REQUEST 10/15/2025 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 09/15/2025 APPROVED DRODRIGUEZ
U-CROSS CONNECTION
ROW - FINAL APRON (AFTER POUR)
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL
BLD - BUILDING FINAL

Review History

Department Status Date In Date Out
BADMIN INFORMATION 06/09/2026 06/09/2026
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM FINAL GRADE CERTIFICATION & FINAL SURVEY MUST BE IN ONE COMBINED FILE
MECH COMPLETE 06/02/2026 06/05/2026
Note: Released By: KENNETH SANDOE - - KSANDOE@PALMCOASTGOV.COM
MECH HOLD 05/27/2026 06/01/2026
Note: Held By: KENNETH SANDOE - - KSANDOE@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition
MECH COMPLETE 01/08/2026 01/09/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 11/24/2025 11/24/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 11/24/2025 11/24/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 11/07/2025 11/07/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 11/03/2025 11/04/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 11/03/2025 11/03/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
SW1 HOLD 10/31/2025 11/03/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please provide the FFEs of lots 105 and 107 on the formboard survey. This help ensure that there are no discrepancies with the elevations when the formboard elevations are taken.
ZON COMPLETE 10/31/2025 10/31/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
SW1 COMPLETE 09/24/2025 09/24/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
SW1 HOLD 09/23/2025 09/23/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL RIGHT OF WAY ELEVATIONS NEED TO BE EQUAL OR GREATER THEN THE EDGE OF PAVEMENT
ZON COMPLETE 09/18/2025 09/18/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON HOLD 09/17/2025 09/17/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please return original copy of ROW Agreement.to our office for procesing
SW1 HOLD 09/17/2025 09/17/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) MUST HAVE EXISTING ELEVATIONS FOR THE LOT BEHIND THIS LOT 10' OFF ELEVATIONS INSIDE THE PROPERTY. 2) NEED TO HAVE 6" OF FALL THE FIRST 10' OFF THE STRUCTURE. 3) ALL RIGHT OF WAY LINE ELEVATIONS NEED TO BE EQUAL OR GREATER THEN THE EDGE OF PAVEMENT.
MECH COMPLETE 09/17/2025 09/18/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 09/17/2025 09/23/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 09/17/2025 09/17/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/17/2025 09/17/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ENGIN1 HOLD 09/15/2025 09/15/2025
Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM Our city survey crew has found that the benchmark is actually in the power pole at the intersection. This benchmark was clearly labelled in the field with a paddle stating the correct elevation. Please confirm the intersection power pole is correct and revise your site plan to match any changes.
SWALE COMPLETE 09/09/2025 09/17/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 09/08/2025 09/12/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 09/08/2025 09/12/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Product Approval FL# 13389-R16 not valid FL# 11473-R4 out of cycle. We are in the 2023 review cycle. FL# 15363-R2 out of cycle. 2. Plans are missing code criteria.
CUSVC COMPLETE 09/08/2025 09/15/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 09/08/2025 09/11/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing on the pantry since it is a counter top. NEC 2020 210.52 (C)
ENGIN1 COMPLETE 09/08/2025 09/09/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 09/08/2025 09/09/2025
LOCATE COMPLETE 09/08/2025 09/11/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 09/08/2025 09/09/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition
SW1 HOLD 09/08/2025 09/09/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Comments: - All hard elevations shall be depicted to the nearest 0.01. Please show both adjacent lots FFE to the nearest 0.01'. - Covered Lanai and entry shall be no less than 0.33'(4") of proposed home FFE. - Edge of pavement and CL elevations shall be on a 20' grid. - Existing elevations are required at all locations of proposed elevations. - Please depict driveway dimensions behind the RW and at the EP. - Please depict that elevations are reference using NAVD88 Please read over the SW Informational packet and the Example Grading Plans I've attched to clearly understand COPC standards. If there are any questions or concerns please feel free to call or email me.
ZON HOLD 09/08/2025 09/08/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan missing width of driveway in front of garage doors. 2. Site plan missing type of material for walkway. 3. Color sheet missing. 4. Please return original copy of ROW Agreement.
PLENV COMPLETE 09/08/2025 09/15/2025
Note: Released By: DYLAN RODRIGUEZ - (386)986-2320 - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 09/15/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤50.00 09/25/2025
ADJUSTMENT 10% (¤176.68) 09/25/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/25/2025
INSPECTION - RESIDENTIAL ¤1,353.00 09/25/2025
PLAN REVIEW - RESIDENTIAL ¤383.76 09/25/2025
FC IMPACT FEE EMS ¤62.00 09/25/2025
IMPACT FEE FIRE ¤434.51 09/25/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/25/2025
FC IMPACT FEE LIBRARY ¤268.00 09/25/2025
IMPACT FEE PARKS ¤1,828.01 09/25/2025
IMPACT FEE SCHOOL ¤5,450.00 09/25/2025
RECORDING FEE REIMBURSE DOC ¤8.50 09/25/2025
RECORDING FEE REIMBURSE DOC ¤44.00 09/25/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 09/25/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 09/25/2025
SURCHARGE FS 533.721 ¤15.90 09/25/2025
SURCHARGE - FS 468.631 ¤23.85 09/25/2025
SW ENG - FOUNDATION SURVEY ¤20.00 09/25/2025
SW ENG INSPECTION 80 ¤80.00 09/25/2025
SW ENG PRE APRON ¤30.00 09/25/2025
SW ENG - REVIEW 20 ¤20.00 09/25/2025
SW ENG RES REVIEW 200 ¤200.00 09/25/2025
WATER METER W/ TAP ¤2,326.93 09/25/2025
SEWER CREDIT (¤1,147.00) 09/25/2025
WASTEWATER PERM INSPECTION ¤80.00 09/25/2025
WASTEWATER PERM REVIEW ¤25.00 09/25/2025
SEWER CAPITAL FACILITY ¤4,415.00 09/25/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 09/25/2025
WATER PERMIT REVIEW ¤25.00 09/25/2025
WATER MAIN EXTENSION IMPACT ¤917.27 09/25/2025
SITE PLAN 30 ¤30.00 09/25/2025
RSI REINSPECTION 1 ¤35.00
RSI REINSPECTION 1 ¤35.00
RSI REINSPECTION 1 ¤35.00
Fees Total Due: ¤105.00 Total Paid: ¤25,106.54