I want to search for...
Permit #2025090452
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7037-00010-0140 |
| Block: 00010 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-234-9464 |
| Location Address: 27 LUDLOW LN W |
| Type: DR - DRIVEWAY |
| NOC: Unknown |
| Applicant name: CYRUS BROWN |
| Owner: TRUSSEL JOHN & RONEE H&W |
|
Address 4922 RAMBLEWOOD DRIVE GALENA, OH 43021 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤9,200.00 |
| Job Description: 18X42 DRIVEWAY REMOVAL AND REPLACEMENT WITH CONCRETE REF 2022100470 |
| Type: CN |
| Original Permit #: 2022100470 |
Contractor
FLAGLER FINISH & CONCRETE LLC
| Status | Location Address | Mailing Address | Phone |
| ACTIVE |
101 PALM HARBOR PKWY BUNNELL, FL 32110 |
#209A PALM COAST, FL 32137 |
386-234-9464 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 10/11/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/11/22 EVERY EXPANSION JOINT IS CRACKED AND BEGINING TO SEPERATE ** DRIVEWAY DOES NOT APPEAR TO HAVE FIBER ADDED AS REQUIRED AND BE A MINIMUMOF 3,000 PSI POUR DOCUMENTATION IS NEEDED TO PROVIDE SPECIFICATIONS OF POUR ** RIGHT SIDE ALSO HAS A WASHOUT ALONG EDGE OF DRIVEWAY APPEARS TO BE UNDERMINING THE, WHICH NEEDS TO BE SODDED ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 04/12/2022 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| Note: 10/11/2022 - PREVIOUS INSPECTION NOTES ** 10/11/22 EVERY EXPANSION JOINT IS CRACKED AND BEGINING TO SEPERATE ** DRIVEWAY DOES NOT APPEAR TO HAVE FIBER ADDED AS REQUIRED AND BE A MINIMUMOF 3,000 PSI POUR DOCUMENTATION IS NEEDED TO PROVIDE SPECIFICATIONS OF POUR ** RIGHT SIDE ALSO HAS A WASHOUT ALONG EDGE OF DRIVEWAY APPEARS TO BE UNDERMINING THE, WHICH NEEDS TO BE SODDED ** SEE ATTACHED PHOTOS | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/24/2022 | 03/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 03/24/2022 | 03/31/2022 |
| Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/24/2022 | 03/25/2022 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤3.00) | |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | |
| SW ENG INSPECTION 40 | ¤40.00 | |
| SW ENG REINSPECTION 20 | ¤20.00 | |
| Fees | Total Due: ¤87.00 | Total Paid: ¤0.00 |