Permit #2025090496

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7065-00390-0030
Block: 00390
Subdivision: -
Job Phone: (386)627-0927
Location Address: 10 KATRINA CT
Type: PO - POOL
Issue Date: 10/17/2025
NOC: RECORDED
Applicant name: JASON BRET PAVLOW
Owner: GURIAN SHARI DENISE SILVA

Address

10 KATRINA CT

PALM COAST, FL 32164

Lot: 0030
Contracted Stated Job Value: ¤59,680.00
Job Description: POOL/EXISTING FENCE
Type: CN

Contractor

WATERSIDE POOLS INC
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST , FL 32137

#3K

PALM COAST , FL 32137

CPC1457358 (Exp: 08/31/2026) (386)447-3390 (386)447-3391

Sub Contractors

CHRISTOPHER I HALL
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 2413

Bunnell, FL 32110

EC13002161 (Exp: 08/31/2028) (386) 437-2966 386-437-5042

Inspection History

Type Request Date Result Inspector
POOL FINAL 02/20/2026 FINAL APPROVED MKRASKI
Note: Via virtual re-inspect
POOL FINAL 02/19/2026 Disapproved - NO FEE MKRASKI
Note: 1. Gate needs to be adjusted so it self closes
ROW - FINAL INSPECTION 02/18/2026 APPROVED FSLADISH
Note: 2/18/26 EDGING DISCUSSED TO ADD A LITTLE BARRIERAND HEIGHT BETWEEN ROCKS AND SOD HAS BEEN INSTALLED AT THE TIME OF THIS INSPECTION, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 2/17/26 MET ON SITE WITH GRADER AND HOMEOWNERS. DETERMINED THERE IS FALL OFF OFF THE POOL DECK AND DRAINAGE FLOW LEFT AND RIGHT OF CENTER. SURVEY DOESN'T REFLECT DRAINAGE IN FIELD. BUILDER IS GOING TO INSTALL EDGING AROUND REAR AND A FEW FEET AROUND REAR CORNERS TO GIVE SOME ADDITIONAL PROTECTION. AREA AROUND POOL IS LANSCAPED WITH ROCK BORDER. HOMEOWNERS HAVE AGREED TO THIS PROPOSAL. I AM APPROVING THIS INSPECTION AS NOTED THAT HOMEOWNERS ARE OK WITH DRAINAGE AT THE TIME OF THIS INSPECTION. _____________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 Inspector Notes from Inspection 9200 2/17/26 MET ON SITE WITH GRADER AND HOMEOWNERS. DETERMINED THERE IS FALL OFF OFF THE POOL DECK AND DRAINAGE FLOW LEFT AND RIGHT OF CENTER. SURVEY DOESN'T REFLECT DRAINAGE IN FIELD. BUILDER IS GOING TO INSTALL EDGING AROUND REAR AND A FEW FEET AROUND REAR CORNERS TO GIVE SOME ADDITIONAL PROTECTION. AREA AROUND POOL IS LANSCAPED WITH ROCK BORDER. HOMEOWNERS HAVE AGREED TO THIS PROPOSAL. 2/17/26 MET ON SITE WITH GRADER AND HOMEOWNERS. DETERMINED THERE IS FALL OFF OFF THE POOL DECK AND DRAINAGE FLOW LEFT AND RIGHT OF CENTER. SURVEY DOESN'T REFLECT DRAINAGE IN FIELD. BUILDER IS GOING TO INSTALL EDGING AROUND REAR AND A FEW FEET AROUND REAR CORNERS TO GIVE SOME ADDITIONAL PROTECTION. AREA AROUND POOL IS LANSCAPED WITH ROCK BORDER. HOMEOWNERS HAVE AGREED TO THIS PROPOSAL. I AM APPROVING THIS INSPECTION AS NOTED THAT HOMEOWNERS ARE OK WITH DRAINAGE AT THE TIME OF THIS INSPECTION. 1/30/2026 - PREVIOUS INSPECTION NOTES 1/30/26 YOU DO NOT HAVE THE COPC MINIMUM REQUIREMENT OF A 3 TENTHS SWALE IN REAR. SEE PHOTO FOR REFERENCE. SWALE 3 TENTHS TOE TO SLOPE Section 300.01 D(6) V-17 6) The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 1/29/2026 - PREVIOUS INSPECTION NOTES 1/29/26 WHAT YOU HAVE UPLOADED IS NOT A TOPOGRAPHICAL SURVEY. YOU ARE REQUIREDTO UPLOAD A TOPO SURVEY THAT MEETS COPC FINAL SURVEY STANDARDS. FINAL SURVEY Section 300.01 F(1) V-17 "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor."
U -UTILITY RESIDENTIAL FINAL 02/18/2026 FINAL APPROVED BHAINES
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/17/2026 APPROVED - AS NOTED FSLADISH
Note: Inspector Notes from Inspection 9200 2/17/26 MET ON SITE WITH GRADER AND HOMEOWNERS. DETERMINED THERE IS FALL OFF OFF THE POOL DECK AND DRAINAGE FLOW LEFT AND RIGHT OF CENTER. SURVEY DOESN'T REFLECT DRAINAGE IN FIELD. BUILDER IS GOING TO INSTALL EDGING AROUND REAR AND A FEW FEET AROUND REAR CORNERS TO GIVE SOME ADDITIONAL PROTECTION. AREA AROUND POOL IS LANSCAPED WITH ROCK BORDER. HOMEOWNERS HAVE AGREED TO THIS PROPOSAL. 2/17/26 MET ON SITE WITH GRADER AND HOMEOWNERS. DETERMINED THERE IS FALL OFF OFF THE POOL DECK AND DRAINAGE FLOW LEFT AND RIGHT OF CENTER. SURVEY DOESN'T REFLECT DRAINAGE IN FIELD. BUILDER IS GOING TO INSTALL EDGING AROUND REAR AND A FEW FEET AROUND REAR CORNERS TO GIVE SOME ADDITIONAL PROTECTION. AREA AROUND POOL IS LANSCAPED WITH ROCK BORDER. HOMEOWNERS HAVE AGREED TO THIS PROPOSAL. I AM APPROVING THIS INSPECTION AS NOTED THAT HOMEOWNERS ARE OK WITH DRAINAGE AT THE TIME OF THIS INSPECTION. 1/30/2026 - PREVIOUS INSPECTION NOTES 1/30/26 YOU DO NOT HAVE THE COPC MINIMUM REQUIREMENT OF A 3 TENTHS SWALE IN REAR. SEE PHOTO FOR REFERENCE. SWALE 3 TENTHS TOE TO SLOPE Section 300.01 D(6) V-17 6) The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 1/29/2026 - PREVIOUS INSPECTION NOTES 1/29/26 WHAT YOU HAVE UPLOADED IS NOT A TOPOGRAPHICAL SURVEY. YOU ARE REQUIREDTO UPLOAD A TOPO SURVEY THAT MEETS COPC FINAL SURVEY STANDARDS. FINAL SURVEY Section 300.01 F(1) V-17 "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor."
ROW FIELD SURVEY /GRADING CERTIFICATION 02/17/2026 APPROVED - AS NOTED FSLADISH
Note: 2/17/26 MET ON SITE WITH GRADER AND HOMEOWNERS. DETERMINED THERE IS FALL OFF OFF THE POOL DECK AND DRAINAGE FLOW LEFT AND RIGHT OF CENTER. SURVEY DOESN'T REFLECT DRAINAGE IN FIELD. BUILDER IS GOING TO INSTALL EDGING AROUND REAR AND A FEW FEET AROUND REAR CORNERS TO GIVE SOME ADDITIONAL PROTECTION. AREA AROUND POOL IS LANSCAPED WITH ROCK BORDER. HOMEOWNERS HAVE AGREED TO THIS PROPOSAL. I AM APPROVING THIS INSPECTION AS NOTED THAT HOMEOWNERS ARE OK WITH DRAINAGE AT THE TIME OF THIS INSPECTION. _____________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 Inspector Notes from Inspection 9200 2/17/26 MET ON SITE WITH GRADER AND HOMEOWNERS. DETERMINED THERE IS FALL OFF OFF THE POOL DECK AND DRAINAGE FLOW LEFT AND RIGHT OF CENTER. SURVEY DOESN'T REFLECT DRAINAGE IN FIELD. BUILDER IS GOING TO INSTALL EDGING AROUND REAR AND A FEW FEET AROUND REAR CORNERS TO GIVE SOME ADDITIONAL PROTECTION. AREA AROUND POOL IS LANSCAPED WITH ROCK BORDER. HOMEOWNERS HAVE AGREED TO THIS PROPOSAL. 2/17/26 MET ON SITE WITH GRADER AND HOMEOWNERS. DETERMINED THERE IS FALL OFF OFF THE POOL DECK AND DRAINAGE FLOW LEFT AND RIGHT OF CENTER. SURVEY DOESN'T REFLECT DRAINAGE IN FIELD. BUILDER IS GOING TO INSTALL EDGING AROUND REAR AND A FEW FEET AROUND REAR CORNERS TO GIVE SOME ADDITIONAL PROTECTION. AREA AROUND POOL IS LANSCAPED WITH ROCK BORDER. HOMEOWNERS HAVE AGREED TO THIS PROPOSAL. I AM APPROVING THIS INSPECTION AS NOTED THAT HOMEOWNERS ARE OK WITH DRAINAGE AT THE TIME OF THIS INSPECTION. 1/30/2026 - PREVIOUS INSPECTION NOTES 1/30/26 YOU DO NOT HAVE THE COPC MINIMUM REQUIREMENT OF A 3 TENTHS SWALE IN REAR. SEE PHOTO FOR REFERENCE. SWALE 3 TENTHS TOE TO SLOPE Section 300.01 D(6) V-17 6) The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 1/29/2026 - PREVIOUS INSPECTION NOTES 1/29/26 WHAT YOU HAVE UPLOADED IS NOT A TOPOGRAPHICAL SURVEY. YOU ARE REQUIREDTO UPLOAD A TOPO SURVEY THAT MEETS COPC FINAL SURVEY STANDARDS. FINAL SURVEY Section 300.01 F(1) V-17 "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor."
ROW- PROJECT STATUS 02/17/2026 APPROVED - AS NOTED FSLADISH
Note: 2/17/26 MET ON SITE WITH GRADER AND HOMEOWNERS. DETERMINED THERE IS FALL OFF OFF THE POOL DECK AND DRAINAGE FLOW LEFT AND RIGHT OF CENTER. SURVEY DOESN'T REFLECT DRAINAGE IN FIELD. BUILDER IS GOING TO INSTALL EDGING AROUND REAR AND A FEW FEET AROUND REAR CORNERS TO GIVE SOME ADDITIONAL PROTECTION. AREA AROUND POOL IS LANSCAPED WITH ROCK BORDER. HOMEOWNERS HAVE AGREED TO THIS PROPOSAL.
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/30/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 1/30/26 YOU DO NOT HAVE THE COPC MINIMUM REQUIREMENT OF A 3 TENTHS SWALE IN REAR. SEE PHOTO FOR REFERENCE. SWALE 3 TENTHS TOE TO SLOPE Section 300.01 D(6) V-17 6) The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 1/29/2026 - PREVIOUS INSPECTION NOTES 1/29/26 WHAT YOU HAVE UPLOADED IS NOT A TOPOGRAPHICAL SURVEY. YOU ARE REQUIREDTO UPLOAD A TOPO SURVEY THAT MEETS COPC FINAL SURVEY STANDARDS. FINAL SURVEY Section 300.01 F(1) V-17 "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor."
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/29/2026 Disapproved - NO FEE FSLADISH
Note: 1/29/26 WHAT YOU HAVE UPLOADED IS NOT A TOPOGRAPHICAL SURVEY. YOU ARE REQUIREDTO UPLOAD A TOPO SURVEY THAT MEETS COPC FINAL SURVEY STANDARDS. FINAL SURVEY Section 300.01 F(1) V-17 "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor."
ELECTRIC AND ALARM 12/17/2025 APPROVED MCONTRYMAN
ELECTRIC AND ALARM 12/16/2025 CANCELLED BY APPLICANT WEB
POOL DECK 12/03/2025 APPROVED MKRASKI
STEEL AND GROUND 11/10/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/10/2025 2:08:24 PM ***

Review History

Department Status Date In Date Out
RSI COMPLETE 09/23/2025 09/24/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 09/23/2025 09/23/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BFLOOD CANCEL 09/12/2025 09/15/2025
BLD COMPLETE 09/12/2025 09/18/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ELEC COMPLETE 09/12/2025 09/15/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 09/12/2025 09/15/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
RSI HOLD 09/12/2025 09/15/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM MUST PROVIDE FLOW ARROWS FOR ENTIRE LOT FOR NEW DRAINAGE PATTERN AFTER POOL IS CONSTRUCTED
ZON COMPLETE 09/12/2025 09/12/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI GENERAL INSPECTION 32.50 ¤32.50 02/18/2026
RSI REINSPECTION 1 ¤35.00 02/18/2026
SURCHARGE FS 533.721 ¤2.30 10/17/2025
SURCHARGE - FS 468.631 ¤3.44 10/17/2025
SW ENG INSPECTION 40 ¤40.00 10/17/2025
SW ENG - REVIEW 20 ¤20.00 10/17/2025
SITE PLAN 30 ¤30.00 10/17/2025
ADJUSTMENT 10% (¤25.50) 10/17/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/17/2025
INSPECTION- POOL ¤160.00 10/17/2025
PLAN REVIEW - RESIDENTIAL ¤65.00 10/17/2025
Fees Total Due: ¤0.00 Total Paid: ¤392.74