I want to search for...
Permit #2025090589
Permit Details
Status: EXPIRED
| Parcel Id: 07-11-31-7022-00280-0220 |
| Block: 00280 |
| Subdivision: - |
| Job Phone: 386-387-1722 |
| Location Address: 53 WESTRIDGE LN |
| Type: DR - DRIVEWAY |
| Issue Date: 09/16/2025 |
| NOC: Unknown |
| Applicant name: JONATHAN E SCHOFIELD |
| Owner: FOWLER ERNEST H & TERESA M FOWLER |
|
Address 53 WESTRIDGE LANE PALM COAST, FL 32164 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤2,400.00 |
| Job Description: REF 2024071358 CIRCLE DRIVE EXTENSION CONCRETE. 14FT WIDE X 50FT LONG. |
| Type: CN |
| Original Permit #: 2024071358 |
Contractor
STAY HARD CONCRETE PAVERS LLC
| Status | Location Address | Phone |
| ACTIVE |
123 WESTCHESTER LANE PALM COAST, FL 32164 |
386-387-1722 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 02/19/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 2/19/26 NO INSPECTOR NOTES REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTON. Compacted dirt and sod must Drawing 300-G-12 Compacted dirt and sod must be placed around all edges of the poured concrete to flush grade including around the miter ends and the driveway shoulders to prevent washout-ALL DISTURBED AREAS SHALL BE STABILIZED WITH SOD. PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN OUT ALL DIRT AND OVER POURED CONCRETE FROM CULVERT PIPE. 2) NEED TO ADD SOIL AND SOD ALONG DRIVEWAY SO DRIVEWAY DON'T WASH OUT. 10/18/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN OUT ALL DIRT AND OVER POURED CONCRETE FROM CULVERT PIPE. 2) NEED TO ADD SOIL AND SOD ALONG DRIVEWAY SO DRIVEWAY DON'T WASH OUT. | |||
| ROW - FINAL APRON (AFTER POUR) | 10/18/2024 | APPROVED | PFLANAGAN |
| ROW - FINAL INSPECTION | 10/18/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN OUT ALL DIRT AND OVER POURED CONCRETE FROM CULVERT PIPE. 2) NEED TO ADD SOIL AND SOD ALONG DRIVEWAY SO DRIVEWAY DON'T WASH OUT. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/18/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- PRE-APRON (PRE-POUR) | 08/29/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| ROW - FINAL INSPECTION | |||
| Note: 2/19/2026 - PREVIOUS INSPECTION NOTES 2/19/26 NO INSPECTOR NOTES REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTON. Compacted dirt and sod must Drawing 300-G-12 Compacted dirt and sod must be placed around all edges of the poured concrete to flush grade including around the miter ends and the driveway shoulders to prevent washout-ALL DISTURBED AREAS SHALL BE STABILIZED WITH SOD. PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN OUT ALL DIRT AND OVER POURED CONCRETE FROM CULVERT PIPE. 2) NEED TO ADD SOIL AND SOD ALONG DRIVEWAY SO DRIVEWAY DON'T WASH OUT. 10/18/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN OUT ALL DIRT AND OVER POURED CONCRETE FROM CULVERT PIPE. 2) NEED TO ADD SOIL AND SOD ALONG DRIVEWAY SO DRIVEWAY DON'T WASH OUT. |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/22/2024 | 08/22/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/26/2024 | 07/30/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 07/26/2024 | 08/01/2024 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/26/2024 | 07/26/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please show setback from the arc to front property line not the street |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤3.00) | 09/16/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/16/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 09/16/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/16/2025 |
| RSI REINSPECTION 1 | ¤35.00 | |
| Fees | Total Due: ¤35.00 | Total Paid: ¤87.00 |