Permit #2025090634
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7039-00060-0030 |
| CONDITIONED SPACE: 1600 sqft |
| GARAGE: 394 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| Total Square Footage: 2164 sqft |
| Block: 00060 |
| Subdivision: - |
| Job Phone: 386-445-9009 |
| Location Address: 107 PEPPERDINE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/12/2026 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PARKWAY PALM COAST, FL 32164 |
|
Address SUITE 7 PALM COAST, FL 32164 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤300,660.00 |
| Job Description: construction single family residence |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
Inspection History
| Type | Request Date | Result | Inspector |
| DRYWALL NAILING | 05/29/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/29/2026 12:43:41 PM *** Approved | |||
| ROW - DRAINAGE | 05/28/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: 5/28/26 SITE IS IN COMPLIANCE WITH COPC STANDARDS AT THE TIME OF THIS INSPECTION. WITH TH POSSIBILITY OF ALOT OF RAIN IN THE FORECAST AND DUE TO THE SLOPE AND HEIGHT OF THE BUILD, BUILDER IS REQUIRED TO CONTAIN ALL DIRT AND SILT ON SIGHT AND NOT ALLOW IT TO OVERSPREAD THE ROADWAY. I WILL CONTINUE TO MONITOR THIS SITE FOR COMPLIANCE DURING CONSTRUCTION. APPROVING AS NOTED. _______________________________________________________________________________________________________________________________ 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26 You are required to remove the dirt/sand buildup in the road as it is creating a safety hazard for pedestrians and traffic, especially motorcyclists. Your culvert pipe is full of silt/dirt not allowing any drainage to flow thru. Swale will need to be cleaned out and open to flowable grade. please make these corrections. I will be back for compliance reinspection on 5/26/26. Photo for reference. | |||
| LATH/BRICK/ WATER BARRIER | 05/28/2026 | APPROVED | JSTEWART |
| INSULATION | 05/27/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/27/2026 8:39:59 AM *** Approved | |||
| ALL ROUGH | 05/22/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/22/2026 10:09:08 AM *** Approved Main underground water service piping is installed from house to meter location but no pressure test has been applied. Trench will need to be opened for visual inspection with pressure test to be inspected by All Rough Inspection 2420 at the latest. | |||
| ROOF VALLEY & METAL | 05/19/2026 | APPROVED | HCAMACHO |
| Note: 5/18/2026 - PREVIOUS INSPECTION NOTES 1. Dripedge in the rear of the house is not nailed off. R905.2.8.5 Drip edge. | |||
| ROW - DRAINAGE | 05/18/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 5/18/26 You are required to remove the dirt/sand buildup in the road as it is creating a safety hazard for pedestrians and traffic, especially motorcyclists. Your culvert pipe is full of silt/dirt not allowing any drainage to flow thru. Swale will need to be cleaned out and open to flowable grade. please make these corrections. I will be back for compliance reinspection on 5/26/26. Photo for reference. | |||
| ROOF VALLEY & METAL | 05/18/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Dripedge in the rear of the house is not nailed off. R905.2.8.5 Drip edge. | |||
| WALL SHEATHING | 05/13/2026 | APPROVED | HCAMACHO |
| Note: 5/11/2026 - PREVIOUS INSPECTION NOTES 1. Disregyard previous wall sheathing inspection, it was resulted by mistake. 2. Wall sheating on gable end truss is not nailed on one side and the other side is not nailed correctly. Marked. Inspector Notes from Inspection 2460 1. Remove shinners from the roof decking. There are several areas around the house on the eves that have shinners. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/11/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Remove shinners from the roof decking. There are several areas around the house on the eves that have shinners. | |||
| WALL SHEATHING | 05/11/2026 | APPROVED | HCAMACHO |
| WALL SHEATHING | 05/11/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Disregyard previous wall sheathing inspection, it was resulted by mistake. 2. Wall sheating on gable end truss is not nailed on one side and the other side is not nailed correctly. Marked. Inspector Notes from Inspection 2460 1. Remove shinners from the roof decking. There are several areas around the house on the eves that have shinners. | |||
| TIE BEAM / LINTEL | 04/16/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/16/2026 8:38:35 AM *** Approved 4/15/2026 - PREVIOUS INSPECTION NOTES 4/15/26: 1). 3 - drilled rods do not meet the 8" minimum embed requirement for missed dowel rods. FBC [A]107.4 (at entry and left wall - marked with orange paint). | |||
| TIE BEAM / LINTEL | 04/15/2026 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/15/2026 10:56:16 AM *** 4/15/26: 1). 3 - drilled rods do not meet the 8" minimum embed requirement for missed dowel rods. FBC [A]107.4 (at entry and left wall - marked with orange paint). | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/01/2026 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2060 *** NOTES ADDED BY RSIMS 3/27/2026 9:16:51 AM *** 3/27/26: Main underground water service piping is installed from house to meter location but no pressure test has been applied. Trench will need to be opened for visual inspection with pressure test to be inspected by All Rough Inspection 2420 at the latest. | |||
| MONOLITHIC SLAB | 04/01/2026 | APPROVED | HCAMACHO |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/27/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/27/2026 9:16:51 AM *** 3/27/26: Main underground water service piping is installed from house to meter location but no pressure test has been applied. Trench will need to be opened for visual inspection with pressure test to be inspected by All Rough Inspection 2420 at the latest. | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 03/26/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/18/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/11/2026 | APPROVED | ISANDERSON |
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| BLD - BUILDING FINAL | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/07/2026 | 05/11/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/25/2026 | 03/26/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/25/2026 | 03/25/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/18/2026 | 03/18/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/03/2026 | 03/06/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/03/2026 | 03/04/2026 |
| Note: Released By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/17/2025 | 10/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/16/2025 | 09/23/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/16/2025 | 09/22/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/16/2025 | 09/23/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/16/2025 | 09/17/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/16/2025 | 09/17/2025 |
| LOCATE | COMPLETE | 09/16/2025 | 09/19/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/16/2025 | 09/17/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/16/2025 | 09/16/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/16/2025 | 09/17/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 02/12/2026 |
| SURCHARGE FS 533.721 | ¤9.96 | 02/12/2026 |
| SURCHARGE - FS 468.631 | ¤14.94 | 02/12/2026 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/12/2026 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/12/2026 |
| SW ENG PRE APRON | ¤30.00 | 02/12/2026 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/12/2026 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/12/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 02/12/2026 |
| SEWER CREDIT | (¤850.00) | 02/12/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 02/12/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 02/12/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 02/12/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 02/12/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 02/12/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 02/12/2026 |
| SITE PLAN 30 | ¤30.00 | 02/12/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 02/12/2026 |
| IMPACT FEE FIRE | ¤434.51 | 02/12/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/12/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/12/2026 |
| IMPACT FEE PARKS | ¤1,828.01 | 02/12/2026 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/12/2026 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 02/12/2026 |
| WATER- TURN ON | ¤50.00 | 02/12/2026 |
| ADJUSTMENT 10% | (¤110.67) | 02/12/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/12/2026 |
| INSPECTION - RESIDENTIAL | ¤838.75 | 02/12/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤237.90 | 02/12/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| Fees | Total Due: ¤102.50 | Total Paid: ¤24,742.09 |