I want to search for...

Permit #2025090645

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7034-01220-0100
Block: 01220
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-931-6532
Location Address: 21 EDMOND PL
Type: DR - DRIVEWAY
Issue Date: 02/19/2026
NOC: Unknown
Applicant name: JOSE LOPEZ
Owner: PINKSTON BRIAN K & IVY KAY H&W

Address

21 EDMUND PLACE

PALM COAST, FL 32164

Lot: 0100
Contracted Stated Job Value: ¤100.00
Job Description: CONCRETE CIRCULAR DRIVEWAY REF#2023111128
Type: CN
Original Permit #: 2023111128

Contractor

JOSE LOPEZ CONSTRUCTION, INC.
Status Location Address State License Number Phone
ACTIVE

14 UTILITY DRIVE #12

BUNNELL, FL 32110

CRC1327719 (Exp: 08/31/2026) (386)445-9424

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 02/20/2026 APPROVED FSLADISH
Note: 2/20/26 HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ______________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9272 *** NOTES ADDED BY FSLADISH 5/9/2024 11:44:05 AM *** 5/9/24 PIPE ELEVATION GOOD. CUTS MADE. CULVERT CLEAR. YOU WILL BE REQUIRED TO LAY A 12" X 12" HOT PATCH AT THE FRONT OF THE DRIVEWAY APRON PER COPC SPECIFICATIONS IN SECTION 500 OF THE COPC ENGINEERING STANDARDS SECTION TECHNICAL MANUAL. Inspector Notes from Inspection 9270 1/2/24 READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
U -UTILITY RESIDENTIAL FINAL 05/09/2024 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 05/09/2024 APPROVED - AS NOTED FSLADISH
Note: *** NOTES ADDED BY FSLADISH 5/9/2024 11:44:05 AM *** 5/9/24 PIPE ELEVATION GOOD. CUTS MADE. CULVERT CLEAR. YOU WILL BE REQUIRED TO LAY A 12" X 12" HOT PATCH AT THE FRONT OF THE DRIVEWAY APRON PER COPC SPECIFICATIONS IN SECTION 500 OF THE COPC ENGINEERING STANDARDS SECTION TECHNICAL MANUAL. Inspector Notes from Inspection 9270 1/2/24 READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW - FINAL INSPECTION 05/09/2024 Disapproved - NO FEE FSLADISH
Note: *** NOTES ADDED BY FSLADISH 5/9/2024 11:47:32 AM *** 5/9/24 YOU ARE REQUIRED BY COPC ENGINEERING STANDARDS SECTION 500 DRIVEWAY DETAIL TO LAY A 12" X 12" HOT PATCH ABUTTING THE DRIVEWAY APRON POUR AT ROAD EDGE. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR FINAL INSPECTION. Inspector Notes from Inspection 9270 1/2/24 READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- PRE-APRON (PRE-POUR) 01/02/2024 APPROVED - AS NOTED FSLADISH
Note: 1/2/24 READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/29/2023 12/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 11/29/2023 12/08/2023
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 11/29/2023 11/29/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤3.00) 02/19/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/19/2026
SW ENG INSPECTION 40 ¤40.00 02/19/2026
Fees Total Due: ¤0.00 Total Paid: ¤67.00