I want to search for...

Permit #2025090725

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-1040-00000-0390
CONDITIONED SPACE: 2530 sqft
GARAGE: 470 sqft
OPENED PORCH (WITH ROOF) : 148 sqft
OPENED PORCH (WITH ROOF) : 83 sqft
Total Square Footage: 3231 sqft
Block: 00000
Subdivision: 2078 - CANTERBURY ESTATES
Job Phone: 386-569-7882
Location Address: 10 LEWIS DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/11/2025
NOC: RECORDED
Applicant name: VLADIMIR V PEREPECHKIN
Owner: WISE CHOICE CUSTOM HOMES INC

Address

77 SOUTHLAKE DR

PALM COAST, FL 32137

Lot: 0390
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WISE CHOICE CUSTOM HOMES, INC.
Status Location Address State License Number Phone
ACTIVE

77 SOUTHLAKE DR

PALM COAST, FL 32137

CRC1328738 (Exp: 08/31/2026) 386-569-7882

Sub Contractors

ANDREW GONCALVES HOWARD
Status Location Address State License Number Phone
ACTIVE

2 RYALL LANE

PALM COAST, FL 32164

CCC1333989 (Exp: 08/31/2026) 386-347-0366
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
MAXIM BUDNIK
Status Location Address State License Number
ACTIVE

3 WAVECREST PL

PALM COAST, FL 32164

CAC1818445 (Exp: 08/31/2026)

Inspection History

Type Request Date Result Inspector
TIE BEAM / LINTEL 04/29/2026 APPROVED JSTEWART
MONOLITHIC SLAB 02/12/2026 APPROVED JSTEWART
PLUMBING 1ST ROUGH UNDERGROUND 02/09/2026 APPROVED CVANSTRAHLEN
Note: 2/5/2026 - PREVIOUS INSPECTION NOTES Previous Notes not rectified......Please sleeve/insulate pex where they cross other plumbing for protection of plumbing. Per manufacturer spec. P2906.10.2 Mechanical joints. Please seperate Hot and cold supply lines in trench. Per manufactuer spec Min of 6" seperation. 308.9 Parallel water distribution systems. 2/2/2026 - PREVIOUS INSPECTION NOTES Water in the lines is frozen, the test is invalid because the ice may temporarily plug leaks, preventing the "visual inspection" and "leak-free" proof required by code. FBPC 312.5 Water supply system test. No preassure gauge installed. Inspection will be needed once Lines are thawed and preassure test is at working preassure. Please sleeve/insulate pex where they cross other plumbing for protection of plumbing. Per manufacturer spec. P2906.10.2 Mechanical joints. Please seperate Hot and cold supply lines in trench. Per manufactuer spec Min of 6" seperation. 308.9 Parallel water distribution systems.
PLUMBING 1ST ROUGH UNDERGROUND 02/05/2026 Disapproved -FEE REQUIRED JSTEWART
Note: Previous Notes not rectified......Please sleeve/insulate pex where they cross other plumbing for protection of plumbing. Per manufacturer spec. P2906.10.2 Mechanical joints. Please seperate Hot and cold supply lines in trench. Per manufactuer spec Min of 6" seperation. 308.9 Parallel water distribution systems. 2/2/2026 - PREVIOUS INSPECTION NOTES Water in the lines is frozen, the test is invalid because the ice may temporarily plug leaks, preventing the "visual inspection" and "leak-free" proof required by code. FBPC 312.5 Water supply system test. No preassure gauge installed. Inspection will be needed once Lines are thawed and preassure test is at working preassure. Please sleeve/insulate pex where they cross other plumbing for protection of plumbing. Per manufacturer spec. P2906.10.2 Mechanical joints. Please seperate Hot and cold supply lines in trench. Per manufactuer spec Min of 6" seperation. 308.9 Parallel water distribution systems.
PLUMBING 1ST ROUGH UNDERGROUND 02/02/2026 Disapproved - NO FEE JSTEWART
Note: Water in the lines is frozen, the test is invalid because the ice may temporarily plug leaks, preventing the "visual inspection" and "leak-free" proof required by code. FBPC 312.5 Water supply system test. No preassure gauge installed. Inspection will be needed once Lines are thawed and preassure test is at working preassure. Please sleeve/insulate pex where they cross other plumbing for protection of plumbing. Per manufacturer spec. P2906.10.2 Mechanical joints. Please seperate Hot and cold supply lines in trench. Per manufactuer spec Min of 6" seperation. 308.9 Parallel water distribution systems.
ROW - DRAINAGE 02/02/2026 APPROVED - AS NOTED EMADISON
Note: ** 02/02/26 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS _________________________________________________________________________________________________________________________ 1/27/2026 - PREVIOUS INSPECTION NOTES 01-27-26 TPOLACEK*** SEE ATTACHED PHOTO, BUILDER MUST HAVE SILT FENCE EXTENDED TO COVER ALL BARE DISTURBED GROUND OR HAVE DISTURBED GROUND OUTSIDE SILT FENCE STABILIZED WITH SOD. I WILL GIVE AN ADDITIONAL 5 DAYS TO COMPLETE AND I WILL PARIALLY APPROVE 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
FORMBOARD SURVEY (OFFICE USE ONLY) 01/30/2026 APPROVED PFLANAGAN
ROW - DRAINAGE 01/27/2026 PARTIALLY APPROVED TPOLACEK
Note: 01-27-26 TPOLACEK*** SEE ATTACHED PHOTO, BUILDER MUST HAVE SILT FENCE EXTENDED TO COVER ALL BARE DISTURBED GROUND OR HAVE DISTURBED GROUND OUTSIDE SILT FENCE STABILIZED WITH SOD. I WILL GIVE AN ADDITIONAL 5 DAYS TO COMPLETE AND I WILL PARIALLY APPROVE 1/22/2026 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
ROW - DRAINAGE 01/22/2026 Disapproved - NO FEE TPOLACEK
Note: TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 5 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 01/20/2026 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 12/16/2025 APPROVED CBOWERMASTER
PEP TANK INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ALL ROUGH
WALL SHEATHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
BLD - BUILDING FINAL
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
LATH/BRICK/ WATER BARRIER
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
SW1 COMPLETE 01/29/2026 01/30/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 01/29/2026 01/29/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 01/15/2026 01/20/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/05/2025 12/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SWALE COMPLETE 12/05/2025 12/11/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 11/25/2025 11/25/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 COMPLETE 11/25/2025 12/05/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved as noted: Please ensure there are no slopes greater than 4:1, specifically on the front right of this home where the swale comes around the concrete walk.
ENGIN1 COMPLETE 11/10/2025 11/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 11/10/2025 11/12/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Provide a site plan with no elevations
MECH COMPLETE 11/10/2025 11/12/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 11/10/2025 11/13/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading comments: - New homes shall not be proposed lower than existing homes. - There shall be a minimum of 0.5'(6") in the first 10' of the home. - There is a type of 24.00' on the left side of this lot. - There shall be 0.1' fall every 20' Please review the COPC SW Informational Packet and the Example Grading Plans. Feel free to call or email if there are any questions or concern to mitigate any further delays.
BLD COMPLETE 11/10/2025 11/14/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN INFORMATION 10/17/2025 10/17/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SITE PLAN MUST NOT HAVE ELEVATIONS LISTED
BLD HOLD 09/18/2025 09/24/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Product Approval 1. FL# 15322.11 not valid 2. FL# 38740 not valid 3. List structural components 4. List FL# for roof vents
CUSVC COMPLETE 09/18/2025 09/26/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 09/18/2025 09/24/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 09/18/2025 09/18/2025
Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM Need to include an elevation benchmark on the grading/drainage plan.
GAS CANCEL 09/18/2025 09/19/2025
LOCATE COMPLETE 09/18/2025 09/19/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 09/18/2025 09/19/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition
SW1 HOLD 09/18/2025 09/22/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) MUST HAVE EXISTING ELEVATONS EVERY 20'. 2) MUST HAVE A BM ON MANHOLE, FIRE HYDRENT, OR POWER POLE. NAILS IN THE ROAD ARE A LAST RESORT. 3) NEED TO HAVE EXISTING ELEVATIONS ON THE ADJACENT LOTS 10' OFF SET ON THE ADJACENT LOT. 4) THE DRAINAGE PATTERN MUST HAVE POSITVE FALL EVERY 20' 5) NEED TO HAVE 6" OF FALL THE FIRST 10' OFF THE BACK OF THE STRUCTURE. 6) NEED TO HAVE EXISTING ELEVATIONS EVERY 20' ON THE EDGE OF PAVEMENT.
ZON HOLD 09/18/2025 09/18/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan : Ac is encroaching in the 10' easement. Provide an 2' easement encroachment agreement. Also list the dimension of ac pad as you can only be 2' into the easement if you are encroaching Color sheet : provide the manufacturer of mink as I have a brown color but that is not the LRV.
URB COMPLETE 09/18/2025 09/29/2025
Note: Released By: MATTHEW SIERRA - (386)286-2002 - MSIERRA@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
FC IMPACT FEE EMS ¤62.00 12/11/2025
IMPACT FEE FIRE ¤434.51 12/11/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/11/2025
FC IMPACT FEE LIBRARY ¤268.00 12/11/2025
IMPACT FEE PARKS ¤1,828.01 12/11/2025
IMPACT FEE SCHOOL ¤5,450.00 12/11/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 12/11/2025
WATER METER W/OUT TAP ¤965.03 12/11/2025
SURCHARGE FS 533.721 ¤15.17 12/11/2025
SURCHARGE - FS 468.631 ¤22.76 12/11/2025
SW ENG - FOUNDATION SURVEY ¤20.00 12/11/2025
SW ENG INSPECTION 80 ¤80.00 12/11/2025
SW ENG PRE APRON ¤30.00 12/11/2025
SW ENG - REVIEW 20 ¤20.00 12/11/2025
SW ENG RES REVIEW 200 ¤200.00 12/11/2025
WASTEWATER PERM INSPECTION ¤80.00 12/11/2025
WASTEWATER PERM REVIEW ¤25.00 12/11/2025
SEWER CAPITAL FACILITY ¤4,415.00 12/11/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 12/11/2025
WATER PERMIT REVIEW ¤25.00 12/11/2025
SITE PLAN 30 ¤30.00 12/11/2025
WATER- TURN ON ¤50.00 12/11/2025
ADJUSTMENT 10% (¤168.56) 12/11/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/11/2025
INSPECTION - RESIDENTIAL ¤1,289.75 12/11/2025
PLAN REVIEW - RESIDENTIAL ¤365.82 12/11/2025
REINSPECTION RESIDENTIAL ¤40.00
RSI REINSPECTION 1 ¤35.00
RSI REINSPECTION 1 ¤35.00
RSI REINSPECTION 1 ¤35.00
Fees Total Due: ¤145.00 Total Paid: ¤23,047.98