Permit #2025090872

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7016-00100-0670
Block: 00100
Subdivision: 7016 -
Job Phone: 386-931-5388
Location Address: 18 CHERRYTREE CT
Type: DR - DRIVEWAY
Issue Date: 10/05/2025
NOC: Unknown
Applicant name: GEOFFREY SANTOPADRE
Owner: KRAESE HERBERT & BARBARA

Address

18 CHERRYTREE COURT

PALM COAST, FL 32137

Lot: 0670
Contracted Stated Job Value: ¤2,400.00
Job Description: Remove and replace concrete driveway apron 16'-6" from edge of pavement
Type: CN

Contractor

SANTOPADRE & SONS LANDSCAPING, INC.
Status Location Address State License Number Phone
ACTIVE

1330 COUNTY RD 13

Bunnell, FL 32110

CGC048833 (Exp: 08/31/2026) (386) 437-1961

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 10/28/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 10/28/2025 FINAL APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 10/27/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- PRE-APRON (PRE-POUR) 10/14/2025 APPROVED - AS NOTED EMADISON
Note: ** 10/14/25 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 CANCELLED VIA PHONE CALL FROM BUILDER ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 CULVERT PIPE IS FULL OF WATER SITE NOT READY FOR INSPECTION ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 10/10/2025 CANCELLED BY APPLICANT EMADISON
Note: ** 10/10/25 CANCELLED VIA PHONE CALL FROM BUILDER ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 CULVERT PIPE IS FULL OF WATER SITE NOT READY FOR INSPECTION ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 10/09/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/09/25 CULVERT PIPE IS FULL OF WATER SITE NOT READY FOR INSPECTION ** SEE ATTACHED PHOTOS

Review History

Department Status Date In Date Out
RSI COMPLETE 09/30/2025 09/30/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM TALKED TO CONTRACTOR ABOUT WIDTH OF THE DRIVEWAY THE DRIVEWAY GOES TO 16.6' TO 18' WHERE THE CULVERT IS SO CULVERT SIZE IS CORRECT FOR 4' ON EACH SIDE
SWALE COMPLETE 09/29/2025 09/29/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
RSI HOLD 09/25/2025 09/26/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEW CULVERT PIPE IS TO LONG NEED TO HAVE MAX OF A 24' CULVERT
ENGIN1 COMPLETE 09/25/2025 09/29/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
UTL COMPLETE 09/25/2025 09/29/2025
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 09/25/2025 09/25/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Concrete Driveway Apron replacement
ENGIN1 COMPLETE 09/22/2025 09/22/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
RSI HOLD 09/22/2025 09/22/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM MUST PROVIDE LENGTH OF THE CULVERT PIPE
UTL COMPLETE 09/22/2025 09/23/2025
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 09/22/2025 09/22/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Concrete Driveway Apron replacement

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 10/26/2025
SW ENG INSPECTION 40 ¤40.00 10/05/2025
SW ENG PRE APRON ¤30.00 10/05/2025
SW ENG RES REVIEW 200 ¤200.00 10/05/2025
SITE PLAN 15 ¤15.00 10/05/2025
ADJUSTMENT 10% (¤3.00) 10/05/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/05/2025
Fees Total Due: ¤0.00 Total Paid: ¤347.00