I want to search for...
Permit #2025090872
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7016-00100-0670 |
| Block: 00100 |
| Subdivision: 7016 - |
| Job Phone: 386-931-5388 |
| Location Address: 18 CHERRYTREE CT |
| Type: DR - DRIVEWAY |
| Issue Date: 10/05/2025 |
| NOC: Unknown |
| Applicant name: GEOFFREY SANTOPADRE |
| Owner: KRAESE HERBERT & BARBARA |
|
Address 18 CHERRYTREE COURT PALM COAST, FL 32137 |
| Lot: 0670 |
| Contracted Stated Job Value: ¤2,400.00 |
| Job Description: Remove and replace concrete driveway apron 16'-6" from edge of pavement |
| Type: CN |
Contractor
SANTOPADRE & SONS LANDSCAPING, INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1330 COUNTY RD 13 Bunnell, FL 32110 |
CGC048833 (Exp: 08/31/2026) | (386) 437-1961 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 10/28/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 10/28/2025 | FINAL APPROVED | BWRIGHT |
| ROW - FINAL APRON (AFTER POUR) | 10/27/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 10/14/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/14/25 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 10/10/2025 - PREVIOUS INSPECTION NOTES ** 10/10/25 CANCELLED VIA PHONE CALL FROM BUILDER ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 CULVERT PIPE IS FULL OF WATER SITE NOT READY FOR INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 10/10/2025 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 10/10/25 CANCELLED VIA PHONE CALL FROM BUILDER ______________________________________________________________________________________________________________________ 10/9/2025 - PREVIOUS INSPECTION NOTES ** 10/09/25 CULVERT PIPE IS FULL OF WATER SITE NOT READY FOR INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 10/09/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/09/25 CULVERT PIPE IS FULL OF WATER SITE NOT READY FOR INSPECTION ** SEE ATTACHED PHOTOS |
Review History
| Department | Status | Date In | Date Out |
| RSI | COMPLETE | 09/30/2025 | 09/30/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM TALKED TO CONTRACTOR ABOUT WIDTH OF THE DRIVEWAY THE DRIVEWAY GOES TO 16.6' TO 18' WHERE THE CULVERT IS SO CULVERT SIZE IS CORRECT FOR 4' ON EACH SIDE | |||
| SWALE | COMPLETE | 09/29/2025 | 09/29/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| RSI | HOLD | 09/25/2025 | 09/26/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEW CULVERT PIPE IS TO LONG NEED TO HAVE MAX OF A 24' CULVERT | |||
| ENGIN1 | COMPLETE | 09/25/2025 | 09/29/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 09/25/2025 | 09/29/2025 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/25/2025 | 09/25/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Concrete Driveway Apron replacement | |||
| ENGIN1 | COMPLETE | 09/22/2025 | 09/22/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| RSI | HOLD | 09/22/2025 | 09/22/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM MUST PROVIDE LENGTH OF THE CULVERT PIPE | |||
| UTL | COMPLETE | 09/22/2025 | 09/23/2025 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/22/2025 | 09/22/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Concrete Driveway Apron replacement |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 10/26/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 10/05/2025 |
| SW ENG PRE APRON | ¤30.00 | 10/05/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/05/2025 |
| SITE PLAN 15 | ¤15.00 | 10/05/2025 |
| ADJUSTMENT 10% | (¤3.00) | 10/05/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/05/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤347.00 |