I want to search for...
Permit #2025090887
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7032-00490-0180 |
| CONDITIONED SPACE: 1600 sqft |
| GARAGE: 394 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| Total Square Footage: 2164 sqft |
| Block: 00490 |
| Subdivision: - |
| Job Phone: 386-445-9009 |
| Location Address: 107 ROXBORO DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/12/2026 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PARKWAY PALM COAST, FL 32164 |
|
Address SUITE 7 PALM COAST, FL 32164 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤300,600.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| SEWER TIE IN | 06/10/2026 | APPROVED | HCAMACHO |
| Note: Virtual Inspection 6/9/2026 - PREVIOUS INSPECTION NOTES 1. Could not verify the sewer tie in, everything was covered up. FBC P2503.2 UNCOVER WORK TO BE INSPECTED | |||
| GRAVITY SEWER TEST | 06/09/2026 | APPROVED | HCAMACHO |
| SEWER TIE IN | 06/09/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Could not verify the sewer tie in, everything was covered up. FBC P2503.2 UNCOVER WORK TO BE INSPECTED | |||
| DRYWALL NAILING | 06/08/2026 | APPROVED | CVANSTRAHLEN |
| INSULATION | 06/03/2026 | APPROVED | CVANSTRAHLEN |
| LATH/BRICK/ WATER BARRIER | 06/02/2026 | APPROVED | CVANSTRAHLEN |
| ALL ROUGH | 06/01/2026 | APPROVED | CVANSTRAHLEN |
| Note: 5/29/2026 - PREVIOUS INSPECTION NOTES CACELLED BY TEXT Inspector Notes from Inspection 2467 Will check items from previous inspection on all rough inspection #1-Truss T08 missing engineering #2-truss T09 and T10 do not match truss web design #3-Missing 2 Meta 18 S on truss T01 double , t02, t03, t04 front side Inspector Notes from Inspection 2460 Please fix items before next inspection #1-Truss T08 missing engineering #2-truss T09 and T10 do not match truss web design #3-Missing 2 Meta 18 S on truss T01 front side | |||
| ALL ROUGH | 05/29/2026 | CANCELLED BY APPLICANT | CVANSTRAHLEN |
| Note: CACELLED BY TEXT Inspector Notes from Inspection 2467 Will check items from previous inspection on all rough inspection #1-Truss T08 missing engineering #2-truss T09 and T10 do not match truss web design #3-Missing 2 Meta 18 S on truss T01 double , t02, t03, t04 front side Inspector Notes from Inspection 2460 Please fix items before next inspection #1-Truss T08 missing engineering #2-truss T09 and T10 do not match truss web design #3-Missing 2 Meta 18 S on truss T01 front side | |||
| ROOF VALLEY & METAL | 05/21/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Will check items from previous inspection on all rough inspection #1-Truss T08 missing engineering #2-truss T09 and T10 do not match truss web design #3-Missing 2 Meta 18 S on truss T01 double , t02, t03, t04 front side Inspector Notes from Inspection 2460 Please fix items before next inspection #1-Truss T08 missing engineering #2-truss T09 and T10 do not match truss web design #3-Missing 2 Meta 18 S on truss T01 front side | |||
| ROOF VALLEY & METAL | 05/19/2026 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Job not completed #1-Truss T08 missing engineering #2-truss T09 and T10 do not match truss web design #3-Missing 2 Meta 18 S on truss T01 front side Inspector Notes from Inspection 2460 Please fix items before next inspection #1-Truss T08 missing engineering #2-truss T09 and T10 do not match truss web design #3-Missing 2 Meta 18 S on truss T01 front side | |||
| WALL SHEATHING | 05/15/2026 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/15/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-Truss T08 missing engineering #2-truss T09 and T10 do not match truss web design #3-Missing 2 Meta 18 S on truss T01 front side | |||
| TIE BEAM / LINTEL | 04/24/2026 | APPROVED | CVANSTRAHLEN |
| MONOLITHIC SLAB | 04/14/2026 | APPROVED | CVANSTRAHLEN |
| Note: 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix item before next inspection #1-per Fl code rebars must have 3" clearance to the soil , some areas on left , right and garage door area . Pluming on master , dirt is pile on pipes | |||
| MONOLITHIC SLAB | 04/13/2026 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Please fix item before next inspection #1-per Fl code rebars must have 3" clearance to the soil , some areas on left , right and garage door area . Pluming on master , dirt is pile on pipes | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/09/2026 | APPROVED | CVANSTRAHLEN |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/06/2026 | APPROVED | PFLANAGAN |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/31/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/24/2026 | APPROVED | ISANDERSON |
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| BLD - BUILDING FINAL | |||
| ELECTRIC - EARLY POWER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/18/2026 | 05/20/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/06/2026 | 04/06/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/06/2026 | 04/06/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/02/2026 | 04/02/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/02/2026 | 04/02/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM Benchmark changed due to centerline off from benchmark. | |||
| BLD | COMPLETE | 03/31/2026 | 03/31/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/24/2025 | 10/24/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/10/2025 | 10/10/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: This lot requires 5 trees. Landscape plan missing trees | |||
| SW1 | COMPLETE | 10/10/2025 | 10/15/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM No revised grading plan uploaded. Initial grading plan approved. | |||
| BLD | COMPLETE | 09/22/2025 | 09/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/22/2025 | 10/02/2025 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 09/22/2025 | 09/29/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/22/2025 | 09/22/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/22/2025 | 09/24/2025 |
| LOCATE | COMPLETE | 09/22/2025 | 09/26/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/22/2025 | 09/24/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/22/2025 | 09/26/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/22/2025 | 09/23/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Lot square footage incorrect on boundary survey This lot requires 5 trees. Landscape plan missing trees | |||
| SWALE | COMPLETE | 09/22/2025 | 04/14/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | 03/12/2026 |
| ADJUSTMENT 10% | (¤110.67) | 03/12/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/12/2026 |
| INSPECTION - RESIDENTIAL | ¤838.75 | 03/12/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤237.90 | 03/12/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 03/12/2026 |
| IMPACT FEE FIRE | ¤434.51 | 03/12/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/12/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/12/2026 |
| IMPACT FEE PARKS | ¤1,828.01 | 03/12/2026 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/12/2026 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 03/12/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 03/12/2026 |
| SURCHARGE FS 533.721 | ¤9.96 | 03/12/2026 |
| SURCHARGE - FS 468.631 | ¤14.94 | 03/12/2026 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/12/2026 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/12/2026 |
| SW ENG PRE APRON | ¤30.00 | 03/12/2026 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/12/2026 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/12/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 03/12/2026 |
| SEWER CREDIT | (¤1,466.00) | 03/12/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/12/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/12/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 03/12/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 03/12/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/12/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 03/12/2026 |
| SITE PLAN 30 | ¤30.00 | 03/12/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24,126.09 |